For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-32 — Provisions for flood hazard reduction

City Code of the City of Decatur, Alabama (Codified through Ordinance No. 24-4600, adopted December 16, 2024. (Supp. No. 37)) · Decatur City Code § 25-32

Corpus is an independent public-information project, not the official City of Decatur website. Stable reference: corpuslaw.us/code/525466c6-536f-4a2d-b3ef-71bc6413705a

Sec. 25-32. - Provisions for flood hazard reduction.

(a) General standards. In all SFHAs and flood-prone areas regulated by the City of Decatur, the following provisions are required for all proposed development including new construction, reconstruction or repairs made to repetitive loss structures, and substantial improvements: 1. Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including but, not limited to Section 404 of the Federal Water Pollution Control Act Amendments (1972, 33 U.S.C. 1334) and the Endangered Species Act (1973, 16 U.S.C. 1531—1544). Maintain such permits permanently with floodplain development permit file. 2. New construction and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. 3. New construction and substantial improvements shall be constructed with materials resistant to flood damage below the BFE. 4. New construction and substantial improvements shall be constructed by methods and practices that minimize flood damages. 5. New construction and substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. 6. Review subdivision proposals and other proposed development, including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding. If a subdivision proposal or other proposed development is in a SFHA, any such proposals shall be reviewed to assure that: a. They are consistent with the need to minimize flood damage within the SFHA, b. All public utilities and facilities, such as sewer, gas, electrical and water systems are located and constructed to minimize or eliminate flood damage, c. All new and replacement water supply systems are to be designed to minimize or eliminate infiltration of flood waters into the systems, d. All new and replacement sanitary sewage systems are to be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters, e. Onsite waste disposal systems are to be located to avoid impairment to them or contamination from them during flooding, and f. Adequate drainage provided to reduce exposure to flood hazards. 7. Manufactured homes shall be installed using methods and practices which minimize flood damage. They must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not to be limited to, use of over-the-top or frame ties to ground anchors. This requirement is in addition to applicable state and local requirements for resisting wind forces. 8. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the systems. 9. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters. 10. On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. 11. Any alteration, repair, reconstruction or improvement to new construction and substantial improvements which is not compliant with the provisions of this ordinance, shall be undertaken only if the non-conformity is not furthered, extended or replaced. 12. Proposed new construction and substantial improvements that are partially located in a SFHA shall have the entire structure meet the standards of this ordinance for new construction. 13. Where new construction and substantial improvements located in multiple SFHAs or in a SFHA with multiple BFEs, the entire structure shall meet the standards for the most hazardous SFHA and the highest BFE. (b) Specific technical standards. In all special flood hazard areas designated as A, AE, AH (with engineered or estimated BFE), the following provisions are required: 1. Residential and non-residential structures. Where BFE data is available, new construction, reconstruction or repairs made to a repetitive loss structure, and substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation (also referred to as the design flood elevation - DFE). Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of section 25-32(b)3. 2. Non-residential structures. New construction, reconstruction or repairs made to a repetitive loss structure, and substantial improvement of any non-residential structure located in AE or AH zones, may be floodproofed (dry) in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to at least one (1) foot above the base flood elevation (herein after referred to as the design flood elevation), with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. a. A professional engineer, who is licensed to practice in the State of Alabama, or licensed architect, who is registered to practice in the State of Alabama, shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with the standards in ASCE-24 (for dry floodproofing) or other compatible standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in section 25-31(c)(6). b. A record of such certificates, which includes the specific elevation (in relation to mean sea level) to which such structures are floodproofed, shall be maintained with the official permitting records for the structure and kept in-perpetuity. c. Any non-residential functionally dependent structure (as defined in section 25-34) that cannot meet the standards stated in subsection (b)2.a. shall require a variance to be issued in accordance with section 25-33(c)3. and (d)1. d. Any non-residential structure, or part thereof, made watertight below the DFE shall be floodproofed in accordance with the applicable standards in ASCE 24. All plans and specifications for such floodproofing shall be accompanied by a statement certified by a professional engineer, who is licensed to practice in the State of Alabama, or licensed architect, who is registered to practice in the State of Alabama, which states that the proposed design and methods of construction are in conformance with the above referenced standards. There should be a statement submitted with the permit application and a statement submitted with the as-built floodproofing certificate prior to the issuance of the certificate of occupancy. e. Prior to the issuance of the certificate of occupancy, the following must be submitted for any non-residential structure that will be floodproofed. (i) An inspection and maintenance plan detailing the annual maintenance of floodproofed components ensuring that all components will operate properly under flood conditions. Components that must be inspected include at a minimum: A. Mechanical equipment such as sump pumps and generators, B. Flood shields and closures, C. Walls and wall penetrations, and D. Levees and berms (as applicable). (ii) A flood emergency operation plan detailing the procedures to be followed during a flooding event and must include information pertaining to how all components will operate properly under all conditions, including power failures. The design professional must prepare the plan which shall include the following: A. An established chain of command and responsibility with leadership responsibilities clearly defined for all aspects of the plan. B. A procedure for notification of necessary parties when flooding threatens and flood warnings are issued. Personnel required to be at the building should have a planned and safe means of ingress/egress and should have no other emergency response duties during a flood event. Alternates should be assigned in the event that the primary persons responsible are unable to complete their assigned duties under the plan. C. A list of specific duties assigned to ensure that all responsibilities are addressed expeditiously. The locations of materials necessary to properly install all floodproofing components must be included in the list. D. An evacuation plan for all personnel or occupants; those without duties for the flood emergency as well as those with duties for implementing the plan. All possible ingress and egress routes must be identified. E. A periodic training and exercise program to keep personnel and occupants aware of their duties and responsibilities. Training drills should be held at least once a year and should be coordinated with community officials. 3. Enclosures for elevated buildings. All new construction, reconstruction or repairs made to a repetitive loss structure, and substantial improvements of existing structures (residential and non-residential) that include ANY fully enclosed area below the BFE, located below the lowest floor formed by the foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of flood waters. a. Designs for complying with this requirement must either be certified by a professional engineer, who is licensed to practice in the State of Alabama, or a licensed architect, registered to practice in the State of Alabama, or meet the following minimum criteria: (i) Provide a minimum of two (2) openings for each enclosed area having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding (if a structure has more than one (1) enclosed area below the BFE, each shall have openings on exterior walls); (ii) Openings shall be in at least two (2) walls of each enclosed area (includes areas separated by interior walls); (iii) The bottom of all openings shall be no higher than one (1) foot above grade; (iv) Openings may be equipped with screens, louvers, valves and other coverings or devices provided that they permit the automatic entry and exit of floodwaters in both directions without impeding or blocking flow and shall be accounted for in determination of the net open area; and (v) Openings meeting the requirements of subsection (3)(a)(i)—(iv) that are installed in doors are permitted. b. So as not to violate the "lowest floor" criteria of this ordinance, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage, or access to the elevated area. c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms. d. All interior walls, ceilings and floors below the BFE shall be unfinished and/or constructed of flood damage-resistant materials. This practice is also referred to as "wet floodproofing". The definitions for "flood damage-resistant materials" and "wet floodproofing" are included in section 25-34. e. Mechanical, electrical, or plumbing devices shall be installed not less than one (1) foot above the BFE. The interior portion of such enclosed area(s) shall be void of utilities except for essential lighting and power, as required, which are watertight or have otherwise been floodproofed. 4. Standards for manufactured homes and recreational vehicles where base flood elevation data is available. a. Require that all manufactured homes placed or substantially improved: (i) Outside of a manufactured home park or subdivision, (ii) In a new or substantially improved manufactured home park or subdivision, (iii) In an expansion to an existing manufactured home park or subdivision, or (iv) In an existing manufactured home park or subdivision on which a manufactured home has incurred "substantial damage" as the result of a flood, be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated one (1) foot or more above the BFE and be securely anchored to an adequately anchored foundation system to resist floatation, collapse, and lateral movement. b. Require that all manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision that are not subject to the provisions of subsection (4)(a) be elevated so that either: (i) The lowest floor of the manufactured home is one (1) foot or more above the BFE; OR (ii) The manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than thirty-six (36) inches in height above the highest adjacent grade and be securely anchored to an adequately anchored foundation system to resist floatation, collapse, and lateral movement. (iii) Concrete block piers (and other foundation systems) are to be designed in accordance with the Code of Federal Regulations Title 24, Part 3285 and with the specifications in FEMA P-85: Protecting Manufactured Homes from Floods and Other Hazards—A Multi-Hazard Foundation and Installation Guide. The § 3285.306 Design procedures for concrete block piers and FEMA P-85 (Table SP-1.1), specify that the maximum allowable pier height (measured from top of grade) for concrete piers to be five (5) feet. (iv) The chassis and its supporting equipment are to be above the pier or other foundation. The areas below the chassis must be constructed with flood-resistant materials. All utilities and mechanical equipment must be elevated to a minimum of three (3) feet above the highest adjacent grade. Any utility and mechanical components that must be below the BFE must be made watertight to that same elevation to meet the standards in section 25-32(a)5. c. Require that all recreational vehicles placed on sites must either: (i) Be on the site for fewer than one hundred eighty (180) consecutive days, (ii) Be fully licensed and ready for highway use on its wheels or jacking system, (iii) Be attached to the site only by quick disconnect type utilities and security devices, and have no permanently attached structures or additions; or (iv) Must meet all the requirements for "new construction", including the anchoring and elevation requirements of section 25-32(b)4.a. and (b)4.b. 5. Standards for manufactured homes where no base flood elevation exists. a. Require that all manufactured homes to be placed within a zone A area on the FIRM shall be installed using methods and practices which minimize flood damage. b. Manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement. Methods of anchoring may include, but are not to be limited to, use of over-the-top or frame ties to ground anchors. c. The manufactured home chassis must be supported by reinforced piers or other foundation elements of at least equivalent strength such that the bottom of the chassis and its supporting equipment be no less than thirty-six (36) inches and up to a maximum sixty (60) inches (five (5) feet) above the highest adjacent grade and be securely anchored to an adequately anchored foundation system. d. The areas below the chassis must be constructed with flood-resistant materials. All utilities and mechanical equipment must be elevated to a minimum of three (3) feet above the highest adjacent grade. Any utility and mechanical components that must be below the BFE must be made watertight to that same elevation to meet the standards in section 25-32(a)5. 6. Require, until a regulatory floodway is designated, that no new construction, substantial improvements, or other development (including fill) shall be permitted within zones A and AE on the City of Decatur FIRM, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. 7. Accessory and agricultural structures. When an accessory structure meets the requirements outlined below, these structures may be wet-floodproofed and do not have to be elevated to one foot above the BFE as required in section 25-32(b)1. A permit shall be required prior to construction or installation of any accessory structures and any agricultural structures built below the DFE and the following provisions apply: a. Must be adequately anchored to prevent flotation, collapse, or lateral movement; b. Must be designed with an unfinished interior and constructed with flood damage-resistant materials below the DFE as described in section 25-32(b)3.; c. Must have adequate flood openings as described in section 25-32(b)3.; d. Must be constructed and placed on the building site so as to offer the minimum resistance to the flow of floodwaters; e. Must comply with the requirements for development in floodways in accordance with section 25-32(c); f. Must elevate any mechanical and other utility equipment in or servicing the structure to or above the DFE or must be floodproofed in accordance with section 25-32(a); g. Prohibit storage of any hazardous or toxic materials below the DFE. h. Permits for small accessory structures may be issued to provide wet floodproofing measures in accordance with the standards described in subsections (i) through (iv) below without requiring a variance. Before issuing permits for small accessory structures, the floodplain administrator must verify: (i) Use is limited to parking of vehicles or storage; (ii) Size is less than or equal to a one-story, two-car garage for all A zones; (iii) Structures are a minimal investment and have a low damage potential with respect to the structure and contents; (iv) Structures will not be used for human habitation; (v) Structures comply with the wet floodproofing requirements in section 25-32(b)3. i. Permits for accessory structures larger than the size allowed for in subsection 7.(h) above, shall require a variance to be granted on a case-by-case basis in accordance with section 25-33(d)3. Variances shall not be granted for entire subdivisions for accessory structures. j. Permits for new construction of all agricultural structures shall require a variance to be granted on a case-by-case basis in accordance with section 25-33(d)4. k. Typically, when structures are substantially damaged by any cause or will be substantially improved, communities must require that the structures be brought into compliance with all requirements for new construction. In accordance with guidance in FEMA Publication 2140, agricultural structures that are substantially damaged by flooding and agricultural structures that are repetitive loss structures are permitted to be repaired or restored to pre-damage condition, provided the following are satisfied: (i) If substantially damaged, the substantial damage determination is based only on the cost to repair damage caused by flooding to pre-damage conditions. (ii) The proposed repair or restoration does not change the size of the structure and does not significantly alter the nature of the building. With the exception of costs associated with wet floodproofing in accordance with section 25-32(b)3., proposals that include work beyond or in addition to that necessary to repair or restore the structure to pre-damage conditions must be regulated as substantial improvements as provided for in this ordinance. (iii) The repaired or restored structure will continue to be an agricultural structure, as defined in this ordinance. (iv) Owners are notified, in writing, that agricultural structures approved under this subsection: A. Will not be eligible for disaster relief under any program administered by FEMA or any other federal agency. B. Will have NFIP flood insurance policies rated based on the structure's risk. C. May be denied NFIP flood insurance policies if repairs do not include the wet floodproofing requirements of section 25-32(b)3. (v) When owners elect to wet floodproof flood-damaged agricultural structures as part of repair or restoration to pre-damage condition, the structure shall comply with the requirements of section 25-32(b)3. (vi) A variance shall be required to allow wet floodproofing in-lieu of elevation or dry-floodproofing in accordance with the definitions in section 25-34. l. Prohibit the storage of hazardous substances (as defined in section 25-34) in any residential accessory structure located in a SFHA. Limit the storage in non-residential accessory structures to only fertilizers, petroleum products, and pesticides essential for landscaping purposes. Limit storage in agricultural structures to only fertilizers, petroleum products, and pesticides necessary for agricultural purposes. In both cases, storage shall be in strict compliance with the requirements of section 25-32(b)9. 8. Underground and aboveground storage (liquid and gas) tanks. Tanks and tank inlets, fill openings, outlets, and vents that are located below the DFE shall be designed, constructed, installed, and anchored to resist all flood-related loads (flotation, collapse, or lateral movement resulting from hydrostatic and hydrodynamic forces) and any other loads, including the effects of buoyancy, during flooding up to and including the 100-year flood and without release of contents into floodwaters or infiltration of floodwaters into the tanks. a. A permit that includes floodplain development shall be required prior to construction or installation of any underground and aboveground tanks (including their foundation and support systems) located within a special flood hazard area. b. Loads on underground tanks and aboveground tanks exposed to flooding shall be determined assuming at least 1.3 times the potential buoyant and other flood forces acting on the empty tank. c. Tanks and associated piping shall be installed to resist local scour and erosion during the 100-year flood. d. Aboveground tanks located in zone A/AE flood hazard areas shall be either: (i) Elevated to or above the DFE on platforms or structural fill, (ii) Elevated to or above the DFE where attached to structures and the foundation system supporting the structures shall be designed to accommodate any increased loads resulting from the attached tanks, (iii) Permitted below the DFE where the tank and its foundation are designed to resist all flood-related loads including floating debris, or (iv) Permitted below the DFE where the tank and its foundation are designed to resist flood loads and are located inside a barrier designed to protect the tank from floating debris. e. Aboveground tanks located in areas designated as zone V/VE, Coastal A-zones, and other high risk flood hazard areas (see ASCE 24-14) shall be elevated to or above the DFE on platforms that conform to the foundation requirements of ASCE 24-14, Section 4.5. Aboveground tanks shall not be permitted to be located under elevated structures or attached to structures at elevations below one foot above the DFE in these areas. f. Underground tanks located in areas designated as zone V/VE, Coastal A-zones, and other high risk flood hazard areas (see ASCE 24-14) shall have the determination of flood-related loads take into consideration the eroded ground elevation. g. Tank inlets, fill openings, outlets, and vents shall be: (i) At or above the DFE or fitted with covers designed to prevent the inflow of floodwater or outflow of the contents of the tanks during conditions of the 100-year flood. (ii) Anchored to prevent lateral movement resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy, during conditions of the 100-year flood. 9. Structures and sites for the storage or production of hazardous substances. Require that all outdoor storage sites, new construction, reconstruction or repairs made to a repetitive loss structure, and substantial improvements to be used for the production or storage of hazard substances (as defined in section 25-34) which are located in the special flood hazard area shall be built in accordance with all applicable standards in this ordinance in addition to the following requirements: a. No structures containing hazardous substances shall be permitted for construction in a floodway; b. Residential structures shall have the area in which the hazard substances are to be stored elevated or dry floodproofed a minimum of two (2) feet above the BFE; c. Non-residential structures shall be permitted to be built below the BFE in accordance with section 25-32(b)2. such that the area where the hazard substance production or storage is located will be: (i) elevated or designed and constructed to remain completely dry to at least two (2) feet above the BFE, and (ii) designed to prevent pollution from the storage containers, structure, or activity during the course of the base flood. d. Any solid, liquid, or gas storage containers of hazardous substances and any associated mechanical, electrical, and conveyance equipment shall be watertight and shall be properly anchored and protected from the hydrostatic and hydrodynamic forces of flood waters and debris carried by the base flood. 10. Construction of fences. New and replacement fences may be allowed in flood hazard areas if they do not act as a flow boundary and redirect the direction of flow, collect flood debris and cause blockages, cause localized increases in flood levels, or if damaged, become debris that may cause damage to other structures. 11. Structures elevated on fill. Fill for structures shall be designed to be stable under conditions of flooding, including rapid rise and rapid drawdown of floodwaters, prolonged inundation, and flood-related erosion and scour. The standards from ASCE 24 should be followed for any fill placed in flood hazard areas. All new construction for residential or non-residential structures may be constructed on permanent structural fill in accordance with the following: a. The lowest floor (including basement) of the structure or addition along with any appurtenant utilities shall be no lower than one foot above the BFE. b. The nearest wall foundation of the structure shall have a minimum setback distance of twenty-five (25) feet from the edge of the floodplain boundary. c. Fill used for structural support or protection shall consist of granular and earthen material that is free of vegetation and foreign or organic materials and suitable for its intended use. d. The fill shall be placed in layers no greater than one (1) foot deep before compacting and should extend at least ten (10) feet beyond the foundation of the structure before sloping below the BFE, said slope being no greater than a 1:1.5 (vertical / horizontal) ratio unless a stability analysis is provided by a registered professional engineer. However, the ten-foot minimum may be waived if a structural engineer certifies an alternative method to protect the structure from damage due to erosion, scour, and other hydrodynamic forces. e. All new structures built on fill must be constructed on properly designed and compacted fill (ASTM D-698 or equivalent) that extends beyond the building walls before dropping below the BFE. f. The top of the fill shall be no lower than one (1) foot above the BFE. g. The fill shall not adversely affect the flow or surface drainage from or onto any neighboring properties. h. Structural fill, including side slopes, shall be protected from scour and erosion under flood conditions up to and including the base flood discharge. When expected velocities during the occurrence of the base flood are greater than five (5) feet per second, armoring with stone or rock protection shall be provided. When expected velocities during the base flood are five (5) feet per second or less, protection shall be provided by covering them with vegetative ground cover. i. The design of the fill or the fill standard must be approved by a licensed professional engineer. j. The applicant shall submit a letter of map revision based on fill (LOMR-F) utilizing FEMA's MT-1 application forms to FEMA requesting a revision to the FIRM for the placement of fill. k. This standard is not applicable for placement of fill in a floodway; fill in a floodway is prohibited. 12. Incompatible uses prohibited in SFHAs: a. Lands lying within the 100-year floodplain shall not be used for: (i) dumping of any material or substance including solid waste disposal sites (including manure), (ii) construction of any wells used to obtain water for ultimate human consumption. (c) Floodways. Located within special flood hazard areas established in section 25-30(b), are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply: 1. The community shall select and adopt a regulatory floodway based on the principle that the area chosen for the regulatory floodway must be designed to carry the waters of the base flood, without increasing the water surface elevation of that flood more than one foot at any point; 2. Encroachments, including fill, new construction, substantial improvements or other development are prohibited within the adopted regulatory floodway unless it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in BFEs during the occurrence of the base flood discharge. A registered professional engineer must provide supporting technical data and certification (no-rise certificate) to FEMA for the proposed floodway encroachment. The no-rise certificate must be submitted to the floodplain administrator with the development permit (including a site plan showing the current and proposed floodway alignment) for approval. 3. Only if section 25-32(c)1. and 2. are satisfied, then any new construction or substantial improvement in a floodway shall comply with all other applicable flood hazard reduction provisions of section 25-32. After satisfying the required provisions stated in this section, encroachments in floodways should be limited to the following types of projects: a. flood control and stormwater management structures; b. road improvements and repairs; c. utility easements/rights-of-way; and d. public improvements or public structures for bridging over the floodway. 4. Fencing shall be prohibited in floodways unless it is demonstrated that such development will not cause any increase in the BFE. Appropriate analysis and documentation shall be submitted along with the development permit for review and approval. Fences that have the potential to block or restrict the passage of floodwaters (by trapping debris or with openings too small to allow unhindered passage of water), such as stockade and wire mesh fences, shall meet the requirements of section 25-32(c)2. (d) Building standards for streams without established base flood elevations (approximate A-zones). Located within the SFHAs established in section 25-30(b), where streams exist but no base flood data have been provided (approximate A-zones), the following provisions apply: 1. BFE data shall be provided for new subdivision proposals and other proposed development (including manufactured home parks and subdivisions) greater than fifty (50) lots or five (5) acres, whichever is the lesser. 2. When BFE data or floodway data have not been provided in accordance with section 25-30(b) then the floodplain administrator shall obtain, review, and reasonably utilize any scientific or historic BFE and floodway data available from a federal, state, or other source, in order to administer the provisions of section 25-32. Only if data are not available from these sources, then section 25-32(d)4. and (d)5. shall apply. 3. All development in zone A must meet the requirements of section 25-32(a) and (b)1.—12. 4. In SFHAs without BFE data, new construction and substantial improvements of existing structures shall have the lowest floor (for the lowest enclosed area; including basement) elevated no less than three (3) feet above the highest adjacent grade. As the requirements set forth in section 25-32(b)1. and (b)2. stipulate the lowest floor to be elevated no less than one foot about the BFE, then the structure for this condition shall be elevated no less than four (4) feet about the highest adjacent grade. 5. In the absence of a BFE, a manufactured home must also meet the elevation requirements of section 25-32(b)4.b.(ii)—(iv) in that the structure cannot be elevated above a maximum of sixty (60) inches (five (5) feet) and all utilities and mechanical equipment must be elevated a minimum of three (3) feet above the highest adjacent grade. 6. Enclosures for elevated buildings in zone A areas shall comply with the standards of section 25-32(b)3.a. The floodplain administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file. (e) Standards for areas of shallow flooding (AO zones). Special flood hazard areas established in section 25-30(b) may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet (1'—3') above ground, with no clearly defined channel. The following provisions apply: 1. All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified on the flood insurance rate map (FIRM) plus one foot of freeboard. If no depth number is specified, the lowest floor (including basement) shall be elevated at least three (3) feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of section 25-32(b)3. The floodplain administrator shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file. 2. New construction and the substantial improvement of a non-residential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified flood level in section 25-32(e)(1) or three (3) feet (if no depth number is specified), above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. As the requirements set forth in section 25-32(b)1. and (b)2. stipulate the lowest floor to be elevated no less than one (1) foot about the BFE, then the structure for this condition shall be elevated no less than four (4) feet about the highest adjacent grade. A professional engineer, who is licensed to practice in the State of Alabama, or licensed architect, who is registered in the State of Alabama, shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above and shall provide such certification to the official as set forth above and as required in section 25-31(b)1. and 2. 3. Drainage paths shall be provided to guide floodwater around and away from any proposed structure. (f) Standards for subdivisions and other development. All subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions) greater than fifty (50) lots or five (5) acres, whichever is the lesser, shall include within the drawings, plans, and permits for such proposals the following: 1. BFE data; 2. Provisions to minimize flood damage; 3. Public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage; 4. Adequate drainage provided to reduce exposure to flood hazards without negatively impacting adjacent properties; 5. Preliminary plans for review and approval of the platted subdivision which identifies the special flood hazard area, floodway boundaries, the BFE, and other areas regulated by the community; 6. Final subdivision plats that identify the boundary of the special flood hazard area, the floodway boundary, the BFEs, and any drainage easements to reduce the risk for flash flooding. (g) Critical facilities. Construction of new and substantially improved critical facilities, which are those for which the effects of even a slight chance of flooding would be too great, shall be located outside the limits of the SFHA or other flood hazard area regulated by the community. These types of facilities (hospitals, fire stations, police stations, storage of critical records, etc.) are given special consideration when formulating regulatory alternatives and floodplain management plans. Construction of new critical facilities (including the modification of an existing structure not previously classified as a critical facility) shall be permissible within the SFHA or other area regulated by the community only if no feasible alternative site is available and access to the facilities remains available during a 0.2 percent chance flood (a.k.a., 100-year flood). 1. Critical facilities constructed within the SFHAs shall have the lowest floor elevated two (2) feet above the BFE at the site. 2. Floodproofing and sealing measures must be implemented to ensure that any and all on-site toxic substances will not be displaced by or released into floodwaters.

(Ord. No. 24-4577, § 1, 2-5-24)

Ask a question about Decatur law

Corpus searches the Decatur sections it holds and shows the ones that match, with their citations. Free, no sign-in.