§ 102-382 — In ground grease interceptor abandonment
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 102-382
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/f692f448-fc76-4283-acf8-f59391b0302b
Sec. 102-382. - In ground grease interceptor abandonment.
The property owner or authorized representative of a building utilizing an in ground gravity grease interceptor or hydro-mechanical grease interceptor (grease trap) shall notify the City of Dothan's FOG program within 30 days whenever a FSE meets the criteria for temporary or permanent abandonment of said interceptor as set forth in section 102-382(a)(1) or section 102-382(b)(1). (a) Temporary abandonment. (1) An in ground grease interceptor is considered to be temporarily abandoned if a FSE temporarily closes for business and the property owner intends to utilize the interceptor for another FSE in the same location. (2) At the property owner's expense, the interceptor shall be completely pumped and the grease waste properly disposed of by a City of Dothan certified grease waste hauler. (3) Once conditions of section 102-382(a)(1) through (2) have been met, the City of Dothan's FOG Program personnel shall be contacted to complete a pumping inspection for the temporary abandonment of an in ground interceptor. The completed grease waste hauler's manifest shall be available onsite for verification during the pumping inspection. (4) Any noted noncompliant functional or plumbing components shall be repaired or replaced, followed by re-inspection from the City of Dothan's FOG Program personnel. (5) Once the in ground grease interceptor has passed inspection, it shall be filled with water to prevent possible floatation. (b) Permanent abandonment. (1) An in ground grease interceptor is considered to be permanently abandoned when the building is remodeled such that the grease interceptor will not be used; or the building is replaced with a type of business that will not be required to utilize the grease interceptor; or when the property is condemned. An in ground grease interceptor considered to be permanently abandoned, shall be properly [removed] in accordance with section 102-382(b)(2) through (3), or demolished in place in accordance with section 102-382(b)(4). (2) The in ground grease interceptor may be removed. Prior to removal, the interceptor shall be completely pumped and the waste properly disposed of by a City of Dothan certified grease waste hauler. Once the interceptor has been completely pumped, the City of Dothan's FOG Program personnel shall be contacted to complete an in ground grease interceptor pumping verification inspection. The grease waste hauler's manifest shall be available onsite for verification during the in ground interceptor pumping verification inspection. Service components remaining in place are not exempt from meeting the plumbing codes. (3) After the interceptor has passed the pumping verification inspection by the city's FOG program personnel, if no replacement is intended, the interceptor may be removed and the hole left by the removal of the grease interceptor shall be back filled with suitable backfill material. Once back fill requirements have been met, the City of Dothan's FOG Program personnel shall be contacted to complete an in ground grease interceptor abandonment final inspection. (4) Alternatively, in lieu of removal, the interceptor can be demolished in place. The interceptor shall be completely pumped and the waste properly disposed of by a City of Dothan certified grease waste hauler. Once the interceptor has been completely pumped, the City of Dothan's FOG Program personnel shall be contacted for an in ground grease interceptor pumping verification inspection. The grease waste hauler's manifest shall be made available onsite during the in ground grease interceptor pumping verification inspection. Demolition of the interceptor shall not commence until the interceptor has passed the pumping verification inspection. The top cover over the interceptor shall then be crushed into the empty tank or removed. The bottom of the tank shall be ruptured. The sides of the interceptor shall then be crushed into the tank. The inlet and outlet plumbing shall be disconnected and the lines capped if not to be used. a. Upon completion of crushing the interceptor in place, the FOG program shall be contacted for an in ground grease interceptor abandonment semifinal inspection. b. After passing the in ground grease interceptor abandonment semifinal inspection, the interceptor shall be back filled with suitable fill material. c. Once backfill requirements of section 102-382(b)(4) have been met, the FOG program shall be contacted for an in ground grease interceptor abandonment final inspection.
(Ord. No. 2015-366, § 1, 12-15-15)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.
