§ 90-142 — Stormwater plan
Code of Ordinances of the City of Dothan, Alabama (Codified through Ordinance No. 2026-96, enacted April 21, 2026. (Supp. No. 67)) · Dothan Code of Ordinances § 90-142
Corpus is an independent public-information project, not the official City of Dothan website. Stable reference: corpuslaw.us/code/c7d8af9a-a81f-4ccb-bbe0-221cc587eefe
Sec. 90-142. - Stormwater plan.
Storm sewers and drainage. Subdivision drainage design shall include a hydrological analysis sealed by a professional engineer registered in the State of Alabama and include all land upstream from and through the proposed subdivision. This analysis shall include, but not be limited to, a map of the upstream basin showing the contributing drainage area, runoff coefficients or curve selection criteria, the time of concentration and how it was calculated and a map showing the route. Drainage computations should be calculated by using the rational method for subdivisions of 40 acres or less and by using the soil conservation service (SCS) method for subdivisions of greater than 40 acres. (a) Storm drainage calculations to support a storm drainage plan are required for review and approval with the complete set of construction plans. The post-development peak flow, at a minimum, shall not exceed the pre-development peak flow for the two, ten, and 25-year frequency storm events. In addition, at the determination of the public works director the post-development peak flow shall not exceed the pre-development peak flow for the two percent annual chance 50-year and the one percent annual chance 100-year frequency storm events. Any deviation of this limitation of peak flow shall be determined and/or approved by the public works director. This can be accomplished by the construction and maintenance of detention ponds or other approved remedies. A freeboard of one vertical foot for the greatest design storm shall be provided in detention ponds. The minimum slope of the bottom of the detention pond shall be two percent unless otherwise approved by the public works director. The analysis shall be submitted to the public works director when the construction plans are submitted. (1) Detention ponds in residential subdivisions shall be labeled as a public drainage easement and shall also be common area. The City of Dothan will maintain public drainage easements associated with the detention pond for structural maintenance of the pond and structures only. All aesthetic maintenance shall be by a homeowners association or the property owner. All other public drainage easements shall also be aesthetically maintained by a homeowners association or the property owner. The City of Dothan will not maintain drainage easements or detention ponds within any private or commercial subdivision. These shall be labeled as private drainage easements. Retention ponds in any development or subdivision, whether commercial, public, or private, shall be in a private drainage easement to be maintained by a Homeowner's Association or the property owner. (2) Storm sewers, drains and catch basins (inlets) shall be provided in each subdivision as follows: Branch catch basins shall be designed to intercept the runoff from a ten-year frequency storm, with the exception of sump inlets on roadways. Sump inlets shall be designed to intercept the runoff from a 25-year frequency storm. Inlets shall be adequately spaced to limit spread to one-half a lane width on local and collector streets based on the design storm for the subject inlet. Spread for arterial and high speed collector streets shall be as determined by the public works director. The minimum inlet size shall be a Type II, single inlet with one wing (seven-foot opening). Stormwater conduits (pipes, flumes, etc.) shall be designed to convey the runoff from the frequency storm (ten-year or 25-year associated with the controlling inlet upstream. The submitted storm drainage analysis shall show the effects of the one percent annual chance 100-year frequency storm event for the subject site and the impacted areas downstream. The acceptable runoff factor is 95 percent for pavements and buildings and additional runoff factors can be submitted for approval by the public works director depending upon topography and type and cover of soil for other areas. These storm drains shall be connected to or spilled into existing drains or ditches as approved by the public works director. Storm drainage pipes shall be sized in accordance with a method approved by the public works director. (3) Where existing area drainage ditches, creeks, branches, swales, etc., occur through or alongside the proposed subdivision, the subdivider shall furnish pipe or paved bottoms with either sloped masonry or concrete sides for any opening of 24 square feet, as measured by circular concrete pipe equivalent or smaller, as determined by the public works director. Drainage channels carrying drainage requiring a pipe larger than 24 square feet shall be improved and maintained in a manner to be determined by the public works director on an individual basis. All drainage improvements shall be installed prior to the approval of the final plat. Routing or rerouting these ditches shall be a consideration in the layout of all lots, and only in exceptional cases due to natural topography shall a ditch bisect any lot in the subdivision. Culverts and bridges designed to the one percent annual chance storm event (100-year) shall be constructed by the developer over all watercourses at street crossings and shall extend the full width of the street, and be approved by the office of the public works director. Any existing ditch or water course not required to be improved as directed above shall be part of a common area and included in a private drainage easement not to be disturbed. (b) All subdivisions are required to provide a detailed flood study and hydraulic analysis for any areas which are currently FEMA designated as being in flood zone "A". If the property being developed does not currently have an established floodway, the same applies for providing a detailed flood study and hydraulic analysis to determine the floodway. (c) Any subdivision immediately adjacent to or within 1,000 feet of a FEMA designated special flood hazard area that has not been studied by FEMA shall have a detailed flood study and hydraulic analysis performed for the development. (d) If the proposed subdivision is located in an area which is subject to inundation by water, the planning commission shall require a thorough review by the public works director. This review may require additional information to be provided by the subdivider in regards to valley cross sections, topography information, flood occurrence records or whatever is available to determine the potential of flooding on the proposed site or adjacent property. Any report issued to the planning commission concerning the flood hazard of an area must be prepared by a professional engineer. (e) Drainage structures shall be designed as required in subsection (b) above. (1) Size. The minimum size of roadway structures shall be18 inches or equivalent. A special design drawing will be required for any drainage structure having a required end area of 20 square feet or more. (2) Material. Roadway pipe material shall meet the requirements as set forth in Section 850 of the current edition of the Alabama Department of Transportation Standard Specifications for Highway Construction. Material shall be class 3 reinforced concrete. Material must meet Alabama Department of Transportation Standard Specifications. A vendor's certificate or test report must be furnished to the public works director. Reinforced concrete drainage structures shall be constructed in accordance with standard drawings and specifications approved by the public works director. (3) Placement. Pipe shall be laid and backfilled in accordance with Alabama Department of Transportation specifications and procedures. (4) Boxes, Headwalls, etc. Headwalls or boxes shall be installed on pipe culverts. Headwalls for precast concrete or brick masonry construction shall require preapproval by the public works director. Headwalls for pipe sizes larger than 48 inches shall be shown on the approved plans with a special detail. Boxes, headwalls, etc. will be constructed of 3,000 PSI concrete. Slope paved headwalls may be used when approved by the public works director.
(Res. of 7-19-17; Res. of 6-20-18)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.