Sec. 96-8. - Application requirements for a development plan approval.

(a) All applicants for a development plan approval for a wireless facility, including; i) for a new tower or other support structure; or ii) for a substantial co-location/modification or subsequent to the adoption of this chapter any modification that; iii) increases the height, width, profile, structural loading on the support structure; or iv) increases the size of the compound beyond the maximum allowed under this chapter; or iv) increases the cumulative RF emissions of an existing permitted facility, shall comply with the requirements set forth in this chapter. In addition to all other required information set forth in this chapter, all applications for the construction or installation of a new facility shall contain the information hereinafter set forth in this subsection prior to the issuance of a building permit. (1) Ownership and management. a. The name, address, phone number and e-mail address of the person preparing the application; b. The name, address, and phone number of the property owner and the applicant, including the legal name of the applicant. If the owner of the structure is different than the applicant, the name and all necessary contact information shall be provided; c. The postal address and tax map parcel number of the property; d. A copy of the FCC license applicable for the intended use(s) of the wireless telecommunications facilities, including all FCC licensed frequency bands for the location; e. The applicant shall disclose in writing any agreement in existence prior to submission of the application that would limit or preclude the ability of the applicant to share space on the new tower; (2) Zoning and planning. a. The zoning district or designation in which the property is situated; b. Certified development plan, one copy per application on 24-inch by 36-inch paper and PDF form on a CD shall be submitted, showing the following; c. A site plan, drawn to scale, showing property lines, lease lot lines, adjoining rights-of-way, easements, water and sewer lines, electrical lines, utility rights-of-way, utility substations, layout and location of all existing and proposed improvements, antenna support structures, telecommunication facilities, structures, mechanical and electrical equipment, setbacks, parking, access roads, security installations, signs, landscaping, buffers, fencing, illumination, camouflage and tower height; d. The size of the property footprint on which the structure to be built or attached to is located, stated both in square feet and lot line dimensions, and a survey showing the location of all lot lines; e. Elevation drawings showing the profile or the vertical rendition of the facility and identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting; f. The azimuth, size and center line height location of all proposed and existing antennas on the supporting structure; (3) Safety. a. The type and design of the facility, the number of antennas arrays proposed to be accommodated and the basis for the calculations of the facility's capacity to accommodate the required number of antenna arrays for which the structure must be designed; b. The age of the facility in years, including the date of the grant of the original permit; c. A description of the type of tower, e.g. guyed, self-supporting lattice or monopole; d. The make, model, type and manufacturer of the tower and the structural design analysis and report, including the calculations, certified by a professional engineer licensed in the state and proving the facility's capability to safely accommodate the facilities of the applicant without change or modification; e. If a modification of a facility is needed whereby the height, profile or size of the facility is increased, or construction is needed outside the compound or property, a detailed narrative explaining what changes are needed and why they are needed; f. A copy of the foundation design, including a geotechnical sub-surface soils investigation report and foundation design recommendation for the tower or other structure; g. If modifying an existing tower or other support structure, an ANSI TIA 222 report regarding the physical condition of the facility and its components done within the previous six months. If such report has not been done within the previous six months, one shall be done and submitted as part of the application. No building permit shall be issued for any wireless facility or related equipment where the structure being attached to is in need of remediation to comply with the requirements of this chapter and other adopted standards of the city, unless and until all remediation work that is deemed needed has been completed or a schedule for the remediation work has been approved by the city planning department; h. In certain instances the city may deem it appropriate to have an on-site RF survey of the facility done after the construction or modification and activation of the facility. Such survey shall be done under the observation and direction of the city or its designee, and an un-redacted copy of the survey results provided, along with all calculations, prior to issuance of a certificate of compliance; i. A signed statement that the applicant will expeditiously remedy any physical or RF interference with other wireless devices or services. j. A written copy of an analysis completed by a qualified individual or organization to determine if the proposed wireless telecommunications facility is in compliance with Federal Aviation Administration Regulation Part 77 and if it requires lighting. Unless already lighted, this requirement shall also be for any facility where the application proposes to increase the height of the facility. If this analysis determines that an FAA determination is required, then all filings with the FAA, all responses from the FAA and any related correspondence shall be provided with the application. (b) New tower or support structure versus co-location. (1) New towers or other support structures shall be prohibited in the following districts: R-1, R-2, R-3, R-4, R-A, MH-1, MH-2, O-2, O-3, historic districts and areas officially deemed to be visual or scenic sensitive areas unless the applicant provides clear and convincing evidence demonstrating that, i) a new tower as proposed is necessary to the exclusions of any alternative or reasonable combination of alternatives; ii) that the intended area cannot be served from outside the district without a new tower or other support structure; iii) that no existing or previously approved facility can reasonably be used for antenna placement; and iv) that not to permit a new tower or other support structure would result in a significant gap in service. (2) As a matter of concealment, all applications for a proposed facility applicable to this chapter shall contain clear and convincing evidence that the facility is sited and designed so as to create the least visual intrusiveness reasonably possible given the facts and circumstances involved, and thereby will have the least adverse visual effect on the environment and its character, on existing vegetation, and be substantially invisible to the community in the area of the facility. The city expressly reserves the right to require the use of stealth or camouflage techniques, including but not limited to DAS (distributive antenna system) and small cell nodes or the functional equivalent of such to achieve this goal and such shall be subject to approval by the board. (3) For a new tower or other support structure the applicant shall be required to submit clear and convincing evidence that a new tower or support structure is the only type of structure within one-half mile of the proposed tower or support structure that will enable the provision of wireless services primarily within the city. (4) In order to better inform the public, in the case of a new tower, the applicant shall hold a "balloon test" or erect a story pole prior to the initial public hearing on the application. The use of a balloon test or story pole, i.e. a temporary mast, shall be that of the city based upon the fact and circumstances involved. The applicant shall arrange to fly, or raise upon story pole, a minimum of a four-foot in diameter brightly colored balloon at the maximum height of the proposed new tower. (5) At least 14 days prior to the conduct of the balloon test, a sign shall be erected so as to be clearly visible from the road nearest the proposed site and shall be removed no later than 14 days after the conduct of the balloon test. The sign shall be at least four feet by eight feet in size and shall be readable from the road by a person with 20/20 vision. (6) Such sign shall be placed off, but as near to, the public right-of-way as is possible. (7) Such sign shall contain the times and date(s) of the balloon test and contact information. (8) The dates, (including a second date, in case of poor visibility or wind in excess of 15 mph on the initial date) times and location of this balloon test shall be advertised by the applicant seven and 14 days in advance of the first test date in a newspaper with a general circulation in the city and as agreed to by the city. The applicant shall inform the city in writing of the dates and times of the test, at least 14 days in advance. The balloon shall be flown for at least four consecutive hours between 10:00 am and 2:00 p.m. on the dates chosen. The primary date shall be on a week-end, but the second date, in case of poor visibility on the initial date, may be on a week day. A report with photos from various locations of the balloon and to-scale superimposed photo simulations of the facility when completed shall be provided with the application. (9) The applicant shall notify all property owners and residents located within 1,000 of the nearest property line of the subject property of the proposed construction of the tower and wireless facility and of the date(s) and time(s) of the balloon test. Such notice shall be provided at least 14 days prior to the conduct of the balloon test and shall be delivered by first-class mail. The applicant shall bear all costs associated with said notification. (10) Any comments or concerns as a result of the balloon test shall be recorded and made part of the application for the development plan approval. (11) The owner of a tower or other support structure, and his/her successors in interest, shall negotiate in good faith for the shared use of the facility by other wireless service providers, and shall: a. Respond within 60 days to a request for information from a potential shared-use applicant; b. Negotiate in good faith concerning future requests for shared use of the new wireless telecommunications facility by other telecommunications providers; c. Allow shared use of the new wireless telecommunications facility if another telecommunications provider agrees in writing to pay reasonable charges. d. Understand that failure to abide by the conditions outlined above may be grounds for revocation of the development plan approval. (c) The applicant shall provide certified documentation in the form of a structural analysis, including any assumptions and calculations and, proving that the facility will meet all local, state and federal structural requirements for loads, including wind and ice loads and including, but not limited to all applicable ANSI (American National Standards Institute) TIA 222 guidelines. In the event of a conflict the more stringent shall apply. (d) The applicant shall furnish a visual impact assessment, which shall include pictorial representations (photo simulations) of "before and after" views from key viewpoints inside of the city as may be appropriate and required, including but not limited to state highways and other major roads, state and local parks, other public lands, historic districts, preserves and historic sites normally open to the public, and from any other location where the site is visible to a large number of visitors, travelers or residents. Guidance will be provided concerning the appropriate key viewpoints at the pre-application meeting. In addition to photographic simulations to scale showing the visual impact, the applicant shall provide a map showing the locations of where the pictures were taken and the distance(s) of each location from the proposed structure; (e) The applicant shall provide a description in writing and a visual rendering demonstrating how it shall effectively screen from view the bottom 15 feet of the facility and all related equipment and structures associated with the facility. All compounds must be surrounded by a landscaped buffer which shall, to a height of eight feet, effectively screen the view of the compound from adjacent public ways and property. The buffer, which may be located within the required setback area, shall consist of a landscape strip, at least eight feet in depth, located outside the security fence. The landscape strip should be planted with a combination of trees, shrubs, vines and/or ground covers which are capable of attaining, at maturity, a height as high as the security fence and which will enhance and, at minimum, partially screen the outward appearance of the security fence. For towers located within 1,000 feet of a residential area, the city may require wider landscape buffers and other items such as decay resistant, solid wood fences, earth berms, and brick or masonry walls in addition to the security fence. (f) A building permit shall not be issued for construction of a new tower until there is an application filed for or by a specific carrier that document that the facility is necessary for that carrier to provide service in the community and that co-location on an existing structure is not feasible. (g) Co-location on an existing structure is not reasonably feasible if co-location is technically or commercially impracticable or the owner of the structure is unwilling to enter into a contract for such use. Sufficient documentation in the form of clear and convincing evidence to support such claims shall be submitted with an application for the first carrier attaching to a tower in order to determine whether co-location on existing structures is reasonably feasible and to document the need for a specific stated height, and that less height will serve to prohibit or have the effect of prohibiting the provision of service.