Sec. 98-403. - Scope.
The level of detail needed for a TIS depends on the size of the development and its phasing. However, every TIS must address elements such as the study area, the study horizon, data collection requirements, capacity analysis, among others. Those elements are discussed here. (1) Study area. The minimum study area shall be determined by project type and size in accordance with the criteria in Table 2. The study area for the proposed development shall include traffic signal controlled intersections, site access drives and major unsignalized intersections to ensure their operation and level of service are adequately assessed. Unsignalized intersections where at least one of the intersecting streets is a collector or arterial are considered major unsignalized intersections. The extent of the study area may be either enlarged or decreased depending on special conditions as determined by the city traffic engineer. (2) Study horizon. The study horizon years shall be determined by project type and size in accordance with the criteria in Table 2. Table 2. Summary of design attributes by functional class Study Category | Development/Subdivision Characteristics | Study Horizons (a) | Minimum Study Area (b) I | Small development 100-499 peak hour trips | 1. Opening year | 1. Site access drives 2. All signalized intersections and/or major unsignalized intersections within ¼ mile II | Moderate development 500-999 peak hour trips | 1. Opening year 2. 5 years after opening | 1. Site access drives 2. All signalized intersections and/or major unsignalized intersections within ½ mile III | Large single-phase development≥1000 peak hour trips | 1. Opening year 2. 5 years after opening 3. 20 years after opening | 1. Site access drives 2. All signalized intersections and/or major unsignalized intersections within 1 mile IV | Large multi-phase development≥1000 peak hour trips | 1. Opening year of each phase 2. 5 years after built-out 3. 20 years after build-out | 1. Site access drives 2. All signalized intersections and/or major unsignalized intersections within 1 mile a. Assume full occupancy and built-out for single phase developments. b. An enlarged study area may be required. (3) Analysis time period. Both the morning and afternoon weekday peak hours need to be analyzed. If the proposed project is expected to generate no trips or a very low number of trips during either the morning or evening peak period the requirement to analyze such period may be waived by the city traffic engineer. If the peak traffic hour in the study area occurs during a time period other than the normal peak travel periods, these peak hours must also be analyzed. (4) Data collection requirements. All data is to be collected in accordance with the latest edition of the ITE Manual of Transportation Engineering Studies or as directed by the city traffic engineer, if not specifically covered in the ITE manual. Turning movement counts shall be obtained for all existing cross-street intersections to be analyzed during the morning and afternoon peak periods. Available turning movement counts may be extrapolated at a maximum of three years with concurrence of the city traffic engineer. The current and projected daily traffic volumes shall be presented in the report. Available daily count data may be obtained from the city traffic engineering division and extrapolated a maximum of three years with the concurrence of the city traffic engineer. Where daily count data are not available, mechanical counts may be required at the city traffic engineer's discretion. Roadway geometric information shall be obtained for all streets in the study area. This includes: roadway width, number of lanes, turning lanes, vertical grade, location of nearby driveways, and lane configuration at intersections. The location and type of traffic controls shall also be identified. If appropriate, traffic volumes should be adjusted to account for seasonal variations. The use of seasonal adjustment factors should be approved by the city traffic engineer. (5) Trip generation. The latest edition of ITE's Trip Generation shall be used for selecting trip generation rates. The guidelines contained in Trip Generation shall be used to determine whether the average trip generation rate or equation should be used. Other rates may be used with the approval of the city traffic engineer in cases where Trip Generation does not include trip rates for a specific land use category, or includes only limited data, or where local trip rates have been shown to differ from the ITE rates. (6) Trip distribution and assignment. Projected trips shall be distributed and added to the projected non-site traffic on the roadway network. The projected traffic volume must be shown for all roadways internal to the subdivision and for all other roadways within the study area. The specific assumptions and data sources used in deriving trip distribution and assignment shall be documented in the study. (7) Capacity analysis. Level of service (LOS) shall be computed for signalized and major unsignalized intersections as identified in Table 1, in accordance with the latest edition of the Highway Capacity Manual. For rural highways where the signalized intersections are more than one mile apart, the level of service on the highway shall be estimatedin accordance with the latest edition of the Highway Capacity Manual. While the use of the operational methodologies presented in the Highway Capacity Manual is always desirable, analyses using the planning method are acceptable for dimensioning of new facilities. (8) Traffic signal needs. An analysis of traffic signal needs shall be conducted for all arterial/arterial, arterial/major collector and major collector/major collector intersections within the study area for the opening year. Signal need evaluations must determine if an intersection meets the signal warrants included in the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). If the warrants are not met for the opening year, they should be evaluated five years after opening for categories II, III and IV traffic impact studies. (9) Accident analysis. An analysis of three-year accident data within the study area shall be conducted to determine if the level of safety (in terms of accident rates and severity index) needs improvement due to the addition of site traffic. (10) Queuing analysis. A queuing analysis shall be conducted for all turn lanes under stop or signal control within the study area to ensure that the expected queues can be accommodated in the storage length provided. Although there are several methods for estimating queue length, the following equations may be used.: For signalized intersections (for every cycle): Queue length (ft) = 2 • (25 ft/veh) • (Volume [veh/hr]/Cycles per hour) For unsignalized intersections (for a 2 minute period): Queue length (ft) = (25 ft/veh) • (Volume [veh/hr]/30) (11) Important analysis. The roadways and intersections within the study area shall be analyzed with and without the proposed development to identify only projected impacts in regard to level of service and safety. The minimum design requirements for all intersections and roadway segments shall be LOS D with no intersection through lane movement falling below LOS D and no intersection turning movement falling below LOS E. If the TIS shows that the impact of a development will bring the LOS below these thresholds during the study horizon, mitigation alternatives to improve the LOS to at least those thresholds must be analyzed as part of the study. Common mitigation alternatives include capacity improvements, travel demand management and provision of alternative modes. If the performance of the existing intersection or roadway is already below those thresholds (e.g. below LOS D for through movements) the study must find alternatives to at least maintain the existing performance. The TIS must also evaluate the need for turning lanes on all major unsignalized intersections using the criteria presented in the auxiliary lanes section. (12) Alternative modes. In cases where pedestrian, transit, bicycle, or golf cart activity should be expected, the TIS must identify any conflict points between vehicles and any other mode. In those cases the study must also make recommendations to facilitate the operation of alternative modes and ensure the safety of their users, especially at the interface with the vehicular network. Recommendations related to alternate modes should be in harmony with the goals of the plans, especially in relation to the planning, design, construction and maintenance of bicycle and pedestrian facilities. Particular attention should be paid to: • Ensuring connectivity of pedestrian and bicycle systems. • Providing safe non-motorized access to school for school children. (13) Responsibility. The traffic impact study shall describe the location, nature and extent of all transportation improvements required to achieve the required post development levels of service within the study area. The responsibility for implementation of the post development mitigation measures shall rest entirely with the applicant.
(Ord. No. 2007-49, § 1, 2-6-07)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.