Sec. 98-404. - Sample table of contents for TIS.
The following table of contents can be used as a template for most traffic impact studies. The table of contents may be modified to better fit the needs of the particular study, but the TIS should at least address the points presented in the auxiliary lanes section. (1) Introduction and summary. a. Purpose of report and study objectives b. Executive summary • Site location and study area • Development description • Principal findings • Conclusions/recommendations (2) Proposed development (site and nearby). a. Site location. b. Land use and intensity. c. Site plan (must be legible). • Access geometrics d. Development phasing and timing. (3) Study area conditions. a. Study area. • Area of significant traffic impact • Influence area b. Land use. • Existing land use • Anticipated future development c. Site accessibility. • Existing and future area roadway system • Site circulation (4) Analysis of existing conditions. a. Physical characteristics. • Roadway characteristics • Traffic control devices • Transit service • Pedestrian/bicycle facilities • Existing transportation demand management b. Traffic volumes. • Daily, morning and afternoon peak period, and others as required c. Level of service. • Morning peak hour, afternoon peak hour, and others as required d. Safety related deficiencies. e. Data sources. (5) Projected traffic. a. Site traffic forecasting (each horizon year). • Trip generation • Mode split (if applicable) • Pass-by traffic (if applicable) • Trip distribution • Trip assignment b. Non-site traffic forecasting (each horizon year). • Projections of non-site traffic c. Total traffic (each horizon year). (6) Traffic and improvement analysis. a. Site access. b. Level of service analysis. • Without project including programmed improvements (each horizon year) • With project including programmed improvements (each horizon year) c. Roadway improvements. • Improvements by ALDOT or others to accommodate non-site traffic • Additional alternative improvements to accommodate site traffic d. Traffic safety. • Sight distance • Acceleration/deceleration lanes, auxiliary lanes • Adequacy of location and design of driveway access e. Alternative modes considerations. • Vehicle/pedestrian conflict points • Vehicle/bicycle conflict points • Vehicle/golf cart f. Traffic control needs. g. Traffic signal needs (base plus five-year horizon). h. Transportation demand management. (7) Conclusions. (8) Recommendations. a. Roadway improvements. • Phasing b. Site access. c. Internal site circulation. d. Transportation demand management actions (if appropriate). e. Other. (9) Appendices. a. Traffic counts. b. Capacity analyses worksheets. c. Traffic signal needs studies. d. Queuing analysis. e. Accident data summaries. (10) Figures and tables. a. Site location. b. Site plan. c. Existing transportation system. d. Existing daily volumes. e. Existing peak hour turning volumes. f. Future transportation system. g. Estimated site traffic generation (daily and peak period). h. Directional distribution of site traffic (daily and peak period). i. Site traffic (peak period). j. Non-site traffic (peak period). k. Total future traffic (daily and peak period). l. Projected levels of service. m. Recommended improvements.
(Ord. No. 2007-49, § 1, 2-6-07)
Ask a question about Dothan law
Corpus searches the Dothan sections it holds and shows the ones that match, with their citations. Free, no sign-in.