For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12-100 — BMP approval requirements—General requirements

Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code § 12-100

Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/07973abd-3542-4dad-8c38-498107fb22c2

Sec. 12-100. - BMP approval requirements—General requirements.

No land-disturbing activity shall be conducted within the city until a permit has been issued by the official allowing such activity pursuant to the provisions of this article. The following are BMP approval requirements: (1) Persons conducting land-disturbing activities shall take all reasonable measures referred to, or provided for, in this article to protect all public and private property from damage caused by such activities and to reduce stormwater pollution to the maximum extent practicable. (2) No land-disturbing activities subject to this article shall be undertaken except in accordance with the following requirements: a. The person(s) proposing to conduct any land-disturbing activity or an agent, contractor or other representative of such person must contact the official at least five (5) business days before commencement of the land-disturbing activity to advise the official of the commencement of such land-disturbing activity, unless, for good cause shown, the official permits such person, contractor, agent or other representative to contact him nearer to the date of the commencement of such land-disturbing activity. b. Other than land-clearing activities required to install the appropriate BMPS in accordance with CBMP plans, any downslope erosion and sediment control measures, on-site stream channel protection and up slope diversion of drainage required by the CBMP Plan shall be in place and functional before any clearing or earth-moving operations begin, and shall be constructed and maintained throughout the construction period. Temporary measures may be removed at the beginning of the workday, but shall be replaced at the end of the workday. c. The angle for graded slopes and fills shall be no greater than the angle, which can be retained by vegetative cover or other adequate erosion control devices or structures. Any slope or fill which has been graded shall, within fourteen (14) days of the completion of such grading or the completion of any phase of grading, be planted or otherwise provided with ground cover, materials, devices or structures sufficient to restrain erosion. The BMPs shall remain in place in accordance with the CBMP plan until the graded slope or fill is stabilized. d. Adequate protective measures shall be provided for the containment of hazardous substances and any other materials which may pollute the MS4, including petroleum products, lubricants and paint. e. All control measures shall be checked, and repaired as necessary, monthly in dry periods and within twenty-four (24) hours after any rainfall at the site of three-quarters (0.75) inch within a twenty-four-hour period. During prolonged rainfalls, daily checking and, if necessary, repairing shall be done. The permittee shall maintain written records of such checks and repairs, which records shall be subject to the inspection of the official at any reasonable time. f. The CBMP plan shall show the size of disturbed area and a schedule of the projected starting and completion dates of the land-disturbing activity. g. A site plan, accompanied by a written description of BMPs which are shown on the site plan, and a schedule of implementation during land-disturbing activities and construction shall be furnished to the official prior to the commencement of any land-disturbing activities. h. A description of, and procedures for, proper storage, handling and disposal of construction materials stored on-site which could contribute to the pollutant loading to the MS4, shall be furnished to the official prior to the commencement of any land-disturbing activities.

(Ord. No. 10-2186, § I(Exh. A), 1-4-10)

Ask a question about Hoover law

Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.