§ 12-99 — Land-disturbing activities
Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code § 12-99
Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/80d9b7c4-1654-4ab8-a931-65b288c95bb9
Sec. 12-99. - Land-disturbing activities.
Land-disturbing activities shall include any land change which may result in soil erosion from water or wind and the movement of sediment to the MS4, including, but not limited to, the clearing, dredging, excavating, transporting and filling of land, except that the term shall not include the following: (1) Agriculture; (2) Silviculture; (3) Such minor land-disturbing activities as home gardens, landscaping on individual residential lots (excluding landscaping performed by, or on behalf of, a developer or builder, who builds a house on any such lot), home repairs, home maintenance work, minor additions to houses, the construction, maintenance or repair of accessory structures and other related activities which result in minor soil erosion. Minor land-disturbing activities include only excavations of less than three thousand five hundred (3,500) square feet which are less than two (2) feet in depth, or which does not create a cut slope greater than five (5) feet in height nor steeper than two (2) horizontal to one (1) vertical. Notwithstanding, if warranted by the circumstances, the official has the discretion to impose an erosion and sedimentation plan and require a permit even though an excavation is less than three thousand five hundred (3,500) square feet; (4) Minor land-disturbing activities such as individual connections for utility services and sewer services for single or two-family residences, minor grading for driveways, yard areas and sidewalks, excluding any grading done by, or on behalf of, a developer or builder in connection with the construction of a house; (5) Minor maintenance, minor repair, and the minor extension of any existing underground public utility lines, except sewer lines; provided, that the utility company which owns such lines has received approval of a general CBMP Plan from the official for such maintenance, repair, and extension; and provided further, that any utility company making a minor extension in connection with which the land disturbed consists of more than one thousand (1,000) linear feet must give the official written notice of such extension prior to the commencement of such minor extension; (6) The construction, repair or rebuilding of railroad tracks; (7) Minor subsurface exploratory excavations under the direction of soils engineers or engineering geologists; (8) The opening of individual burial sites in property which has been approved for such use by all necessary governmental authorities; (9) Digging of water wells or environmental monitoring wells; or (10) A fill which is less than one (1) foot in depth and placed on a natural ground surface with a slope flatter than five (5) horizontal to one (1) vertical or does not exceed fifty (50) cubic yards on any one (1) lot, is less than three (3) feet in depth, is not intended to support structures, and does not obstruct a drainage course. The activities referred to in items (2) through (9) above may be undertaken without a permit; however, the persons conducting these excluded activities shall remain responsible for otherwise conducting such activities in accordance with the provisions of this article and any other applicable law, including the proper control of sedimentation and runoff to the MS4. This article shall apply to such land-disturbing activities that drain to the MS4 if a stormwater pollution problem is shown to be caused by such activity following monitoring procedures and complaints.
(Ord. No. 10-2186, § I(Exh. A), 1-4-10)
Ask a question about Hoover law
Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.
