Sec. 12-57. - Duties and responsibilities of the floodplain administrator.

The floodplain administrator is hereby authorized and directed to enforce the provisions of this article. The floodplain administrator is further authorized to render interpretations of this article, which are consistent with its spirit and purpose. The duties of the floodplain administrator shall include, but shall not be limited to: (1) Require permits for all proposed construction or other development in the city, including the placement of manufactured homes, so that it may be determined whether such construction or other development is proposed within flood-prone areas. Provide public awareness that floodplain development permits are required for development in SFHAs. (2) Conduct inspections of the city's SFHAs for any unpermitted development and issue stop work orders and notice of violations for any such development. Any unpermitted structure or non-structural development in the SFHA will be considered a violation until such time that the violation has been remedied. (3) Review all permit applications of proposed development, to determine whether the proposed construction or other development will be reasonably safe from flooding and to assure compliance with this article. a. If the provisions of this article have been met, approve the permit. b. If the provisions of this article have not been met, request that either corrections and accurate completion of the application be made or disapprove the permit. (4) Review proposed development to determine that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently with floodplain development permit file. (5) Obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state, or other sources in order to administer the provisions of division 3 hereof when base flood elevation data or floodway data have not been provided in accordance with section 12-41. (6) Verify and record the actual elevation of the lowest floor in relation to mean sea level (or highest adjacent grade), including basement, of all new construction or substantially improved structures in accordance with section 12-59(2). a. Review elevation certificates and require incomplete or incorrect certificates to be corrected and resubmitted for approval. b. A post-construction elevation certificate is required to be kept with the permit and certificate of occupancy in perpetuity; a pre-construction elevation certificate can be used to ensure the correct elevation for the lowest floor and machinery along with the correct number of vents that will be used. (7) Verify and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been elevated or flood-proofed, in accordance with sections 12-59 or 12-72(2) and 12-75(2). (8) Obtain certification of design criteria from a registered professional engineer or architect licensed to practice in the state in accordance with section 12-59(1) and section 12-72(2) or 12-75(2) when flood proofing is utilized for a non-residential structure. (9) Notify adjacent communities and the Alabama Department of Environmental Management, and the appropriate district office of the U.S. Army Corps of Engineers prior to any alteration or relocation of a watercourse and submit evidence of such notification to FEMA and the NFIP State Coordinator's Office (Alabama Department of Economic and Community Affairs/Office of Water Resources). (10) For any altered or relocated watercourse, submit engineering data/analysis within six months after completion of the project to FEMA and the state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained following completion of the project. (11) Make the necessary interpretation where interpretation is needed as to the exact location of boundaries of the SFHA (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (12) Maintain in perpetuity all records pertaining to the provisions of this article in the office of the floodplain administrator and keep such records open for public inspection to the extent required by law, recognizing that such information may be subject to the Privacy Act of 1974, as amended. (13) For any improvements made to existing construction located in the SFHA (as established in section 12-41) ensure to the best of his/her ability that a permit is obtained. Also, conduct substantial improvement (SI) (as defined in section 12-36 of this article) reviews and analysis of all structural development permit applications. Maintain a record of the SI calculations and comments within the permit files in accordance with section 12-57(12) of this article. (14) For any residential and nonresidential structures located in the SFHAs that are damaged from any source, natural hazard or man-made, conduct substantial damage (SD) (as defined in section 12-36 of this article) assessments. a. The floodplain administrator shall ensure to the best of his/her ability that permits are obtained, in accordance with this article, prior to any repairs commencing. b. The floodplain administrator should follow the procedures in its community substantial damage management plan to help enable the city to adequately manage the SI/SD determination process and the permitting and inspections for repairs during a post-disaster recovery. c. Make SD determinations whenever structures within the SFHA area are damaged by any cause or origin. SD determinations shall not be waived to expedite the rebuilding process during a post-disaster recovery or for any other reason. d. If the community has a large number of buildings in their SFHA that have been damaged, they should decide in advance how best to handle permitting and inspecting damaged buildings for substantial damage determinations. e. If required, a moratorium may be placed on all non-disaster related construction permits until the community has sufficiently completed its SD determinations. f. The SD determinations should be performed immediately after the damage-causing event or other cause of damage. g. The city shall utilize methods and tools for collecting building data and performing analyses that will provide reasonable and defensible SD determinations. Those tools shall be capable of generating reports for record-keeping purposes and to provide to the applicable property owners if requested. h. Maintain a record of the SD calculations within permit files in accordance with section 12-57(12) of this article. i. If the SD determination finds that the extent that the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred, the floodplain administrator shall: 1. Coordinate with the property owner and issue a letter to convey the SD determination. 2. Determine if the damage was caused by flooding and include the cause in the letter to the property owner. Also, include whether the structure qualifies as a repetitive loss structure per the definitions in section 12-36 of this article. The information can be used to determine if the claim is eligible for an increased cost of compliance claim. 3. Coordinate with property owners and insurance companies for any NFIP claims. 4. If the repairs are to proceed, coordinate with the permit applicant to attempt to ensure a permit is obtained and inspections are conducted to attempt to ensure that all applicable provisions of this article are adhered to without exception or waiver. j. A structure qualifies as a repetitively damaged structure (synonymous to repetitive loss property) if it is determined to have been damaged by flooding two or more times within a 10-year period where the cost of repairing the flood damage, on average, equaled or exceeded 25 percent of its fair market value at the time of each flood event. All of the provisions of section 12-57(14) for substantial damages shall apply to any repetitively damaged structure, whether or not it is covered by NFIP flood insurance. If the structure is located within a SFHA and NFIP flood insurance claims were paid for each of the two flood losses, then the structure is eligible for an increased cost of compliance (ICC) claim. The following procedures shall be performed by the city to track repetitive losses and provide documentation necessary for an ICC claim: 1. Maintain permit records of all reconstruction and repairs for flood damages; 2. Record the date of repairs for a particular building so that the repair history can be checked before the next permit is issued; 3. Record the flood-related cost to repair the building and the fair market value of the building before the damage occurred for each flood event; and 4. Issue a letter of notice of determination to the owner of the structure. k. Ensure to the maximum extent practicable that phased improvements and incremental repairs do not circumvent the SI/SD requirements. l. Ensure to the maximum extent practicable that any combinations of elective improvements being made in addition to the necessary repairs to damages are included in making the SI/SD determination. m. An applicant for a permit may appeal a decision, order, or determination that was made by the floodplain administrator for the following: 1. The floodplain administrator's finding or determination that the proposed work constituting a SVSD were based on insufficient information, errors, or repair/improvement costs that should be included and/or excluded; and/or 2. The floodplain administrator's finding or determination that the proposed work constituting a SI/SD were based on inappropriate valuations of costs for the proposed work, or an inappropriate method to determine the market value of the building. n. It is not appropriate for a permit applicant, who wishes to build in a manner that is contrary to the regulations and codes included in this article, to seek an appeal. In those cases, the applicant should seek a variance. o. Ensure that any building located in a floodway that constitutes a SI/SD has an engineering analysis performed in accordance with section 12-76(2). If that analysis indicates any increase in the BFE, the floodplain administrator must not allow the proposed work unless the structure is brought into full compliance with this article. (15) Coordinate with insurance adjusters prior to permitting any proposed work to bring any flood-damaged structure covered by a standard flood insurance policy into compliance (either substantially damaged structures or repetitive loss structures) to ensure eligibility for ICC funds. (16) Enforce the provisions of this article. The floodplain administrator may also utilize the following in the enforcement of this article. a. Right of entry. 1. After the certificate of occupancy has been issued for a building and the floodplain administrator observes or whenever the floodplain administrator has reasonable cause to believe that renovations and retrofits have been made to the building, structure, or premises located in a SFHA that appear to be in violation of any provision of this article, he/she shall have the right to seek entry into that building as described in (2) to (5) below. 2. Whenever it becomes necessary to make an inspection to enforce any of the provisions of this article, the floodplain administrator may enter such building, structure or premises at all reasonable times (normal business hours for the community) to inspect the same or perform any duty imposed upon the floodplain administrator by this article. 3. If such building or premises is occupied, the floodplain administrator shall first present proper credentials and request entry. If such building, structure, or premises is/are unoccupied, he/she shall first make a reasonable effort to locate the owner or other persons having charge or control of such building or premises prior to entry. 4. If entry is refused or the owner cannot be located, the floodplain administrator shall have recourse to every remedy provided by law to secure the right of entry to the building, structure, or premises. 5. When the floodplain administrator shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the floodplain administrator for the purpose of inspection and examination pursuant to this article.

(Ord. No. 24-2636, § 1, 3-18-24)