§ 12-59 — Permit procedures
Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code § 12-59
Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/8a5099ad-8933-4fe2-8710-3eb89b6a31ce
Sec. 12-59. - Permit procedures.
An application for a floodplain development permit shall be made to the floodplain administrator on forms furnished by the city prior to any development (any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment or materials) in the SFHAs of the city, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the elevations of the area of development and the nature, location, dimensions, of existing or proposed development. Specifically, the following procedures and information are required for all projects in the SFHA or other designated floodplains within the jurisdiction of the city: (1) Application stage. Plot plans are to include: a. The BFEs where provided as set forth in section 12-72 and section 12-76. b. Boundary of the SFHA and floodway(s) as delineated on the FIRM or other flood map as determined in section 12-41. c. Flood zone designation of the proposed development area as determined on the FIRM or other flood map as set forth in section 12-41. d. Elevation in relation to mean sea level (or highest adjacent grade) of the regulatory lowest floor level, including basement, of all proposed structures. e. Elevation in relation to mean sea level to which any non-residential structure will be flood-proofed. f. Design certification from a registered professional engineer or licensed architect, who are licensed to practice in the state, that any proposed non-residential flood-proofed structure will meet the flood-proofing criteria of section 12-72(2) and 12-75(2). g. A foundation plan, drawn to scale, that shall include details of the proposed foundation system to ensure all provisions of this article are met. These details include, but are not limited to, the proposed method of elevation (i.e., fill, solid foundation perimeter wall, solid backfilled foundation, open foundation on columns/posts/piers/piles/shear walls) and description of any flood openings required in accordance with section 12-72(1) and 12-72(3) when solid foundation perimeter walls are used. h. Description of usage of any enclosed areas below the lowest floor. i. Plans and/or details for the protection of public utilities and facilities such as sewer, gas, electrical, and. water systems to be located and constructed to minimize flood damage. j. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development including current and proposed locations of the watercourse. An engineering report shall be prepared by a registered professional engineer, who is licensed to practice in the state, on the effects of the proposed project on the flood-carrying capacity of the watercourse and the effects to properties located both upstream and downstream. The affected properties shall be depicted on a map or on the plot plan. k. Certification of the plot plan by a registered professional engineer or surveyor licensed in the state is required. l. In any lot or lots/areas that will be or have been removed from the SFHA utilizing a letter of map revision based on fill (LOMR-F), the top of fill elevation must meet the city's freeboard elevation at that location. If the top of fill elevation is below the freeboard elevation, all new structures, additions to existing buildings or substantial improvements must meet the required city freeboard elevation. (2) Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the floodplain administrator an as-built certification of the regulatory floor elevation or flood-proofing level using appropriate FEMA elevation or floodproofing certificate immediately after the lowest floor or flood proofing is completed. When flood proofing is utilized for non-residential structures, said certification shall be prepared by a registered professional engineer or architect, who is licensed in the state, and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The floodplain administrator shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make said required corrections, shall be cause to issue a notice of violation and/or stop-work order for the project. The floodplain administrator shall make periodic inspections of projects during construction throughout the SFHAs within the city's jurisdiction to attempt to ensure that the work is being done according to the provisions of this article and the terms of the permit. Members of the city's building inspections and engineering departments shall have a right, upon presentation of proper credentials, to enter on any premises within the territorial jurisdiction of the city at any reasonable hour for the purposes of inspection or other enforcement action. The floodplain administrator may revoke and require the return of the floodplain development permit by notifying the permit holder in writing stating the reason(s) for the revocation. Permits shall be revoked for any departure from the approved application, plans, and specifications; for refusal or failure to comply with the requirements of state or local laws; or for false statements or misrepresentations made in securing the permit. Any floodplain development permit mistakenly issued in violation of an applicable state or local law may also be revoked. (3) Finished construction. Upon completion of construction, a FEMA elevation certificate (FEMA Form 81-31 or equivalent), which depicts all finished construction elevations, is required to be submitted to the floodplain administrator prior to issuance of a certificate of occupancy. If the project includes a floodproofing measure, a FEMA floodproofing certificate is required to be submitted by the permit holder to the floodplain administrator. The floodplain administrator shall review the certificate(s) and the data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to certificate of compliance/occupancy issuance. In some instances, another certification may be required to certify corrected as-built construction. Failure to submit the certification or failure to make required corrections shall be cause to withhold the issuance of a certificate of compliance/occupancy. Documentation regarding completion and compliance with the requirements stated in the permit application and with section 12-59(1) of this article shall be provided to the city's floodplain administrator at the completion of construction or records shall be maintained throughout the construction stage by inspectors for the floodplain administrator. Failure to provide the required documentation shall be cause to withhold the issuance of a certificate of compliance/occupancy. All records that pertain to the administration of this article shall be maintained in perpetuity and made available for public inspection, recognizing that such information may be subject to the Privacy Act of 1974, as amended.
(Ord. No. 24-2636, § 1, 3-18-24)
Ask a question about Hoover law
Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.
