§ 4 — Permitted use: application, and fees
Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code, App. IV, art. VII, § 4
Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/bfcf8ca8-34c0-4d73-86c3-593e8c10b771
Sec. 4. - Permitted use: application, and fees.
a. In General, Application and Permit Required. Any person desiring to obtain the ability to locate, place, attach, install, operate, maintain, control, remove, reattach, reinstall, relocate and replace Small Cell Facilities within the city right-of-way, on city-owned support structures or facilities, utility poles, or any private property within the corporate limits of the city, must file an application, pay the appropriate fees required, and obtain a permit, except as otherwise provided in this Article. The city Council may upon determination of a public purpose, waive, reduce, or otherwise modify the provisions of this Article and the permitted use as necessary to achieve the desired saturation of small cell in the city of Hoover. b. Application Required for Each Small Cell Facility and Equipment. A permit application must be submitted for each project on a form, paper or electronic, provided by the city. If any information is deemed proprietary or confidential, then the applicant must mark each page accordingly. An application packet will be maintained by the City Clerk. c. Consolidation Application Permitted. One permit application must be submitted per thirty (30) nodes or small cell facilities and must comply with the Design Standards as provided in Section(s) 7—9. Also, photographs and illustrations of examples of the types of acceptable colocation, stealth technology, and other design aesthetics that may be used when placing small cell facilities in the city and/or for buildings utilized as Support Structures and other applications of stealth technology that are currently contemplated shall be maintained by the City Clerk and in such a form that is satisfactory to the Director of Buildings and Inspections or as designated by the Mayor. The purpose is to expedite review of a Project for deployment. d. An initial administrative and permit issuance fee of five hundred dollars ($500.00) is assessed for each permit application submitted to place and operate facilities in the public right-of-way or on private property. This fee shall include application and placement for up to five (5) nodes, with an additional one hundred dollars ($100.00) fee for each small wireless facility beyond five (5). e. For placement of a new pole or support structure (i.e. not a collocation), a one-time fee of one thousand dollars ($1,000.00) is assessed, and each new pole or support structure must be designed to support more than one (1) node and its necessary equipment. f. An annual license fee of two hundred seventy ($270.00) is assessed per node in the public right-of-way. g. Removal fee may be applicable. A fee for removal of facilities and/or their respective equipment may be applicable and is hereby authorized as necessary. Such fee may be waived by the Mayor or his designee if the above fees in subsections (d)—(f) have already been tendered for the year of request and their removal does not hinder an ongoing city project or improvement and/or/ no additional city personnel is necessary to ensure safe removal. h. Additional fee for attachment to city-owned utility/traffic poles and structures. The city shall provide a good faith estimate for any make-ready work necessary to enable the city-owned pole or structure to support the requested small wireless facility, including pole replacement if necessary within sixty (60) days after receipt of a completed request. Make-ready work including any pole attachment shall be completed within forty-five (45) days of written acceptance of the good faith estimate by the wireless provider. Failure to pay make-ready cost by the Applicant within three (3) months shall constitute a violation of this Article. The Applicant and city shall collaborate on design and construction for the work necessary and Applicant may undertake the make-ready work necessary at their own expense upon written approval from the City Engineer in order to meet a more stringent timeframe. i. Repealed. j. No application fee required for Pre-Approved Eligible Facilities Request. A permit application fee shall not be required for routine maintenance and/or the replacement of a small wireless facility with another small wireless facility that is substantially similar or smaller in size, weight, and height, so long as, notification of working in right-of-way received. k. Reserved.
(Ord. No. 18-2378, 6-4-18; Ord. No. 2385, §§ 1—3, 6-18-18; Ord. No. 19-2417, §§ 1—4, 1-7-19)
Ask a question about Hoover law
Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.
