For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6 — Placement and maintenance of facilities in public rights-of-way

Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code, App. IV, art. VII, § 6

Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/4f9a0a62-c54c-4d36-bb73-6b93a04841a3

Sec. 6. - Placement and maintenance of facilities in public rights-of-way.

a. The City shall allow placement of Small Cell Facilities (including Accessory Equipment) including any Support Structure on the public right-of-way for any Applicant who adheres to the provisions of this Article through an administrative application review process as described herein. b. To ensure the public health and safety, the written recommendations for the addition of Facilities and their Equipment will be required after submission of the permit application from the following departments: 1) Engineering. 2) Building and Inspections. c. The Mayor or his designee will review and administratively process any request for a permit to determine, whether in the exercise of the Mayor or his designee's reasonable discretion and with review of the recommendations as provided in subsection b, that the Facilities should be issued for the location and the manner requested by the Applicant. d. Burden is on the Applicant to demonstrate that the placement of the proposed Facilities and their associated Accessory Equipment or Support Structure on the right-of-way is the minimal physical installation which will achieve the goal of enhancing the provision of personal wireless services when considering all pertinent factors contained in Section 8. e. Prohibitions. 1) No wireless facilities other than small cell technology or its related accessory equipment shall be installed in the city's right-of-way without a permit. 2) Wireless facilities, other than small wireless facilities and micro wireless facilities are strictly prohibited within the city right-of-way unless a waiver is granted by the city. 3) No facility or equipment shall materially interfere with the safe operation of traffic control equipment. 4) No facility or equipment shall materially interfere with sight lines or clear zones for transportation, pedestrians, or public safety purposes. 5) No facility or equipment shall materially interfere with compliance with the Americans with Disabilities Act or similar federal or state standards regarding pedestrian access or movement. 6) No facility or equipment shall materially interfere or comply with the Alabama Department of Transportation Utility Manual, as it may be applicable and amended. 7) No facility or equipment shall fail to comply with the Applicable Codes. 8) No facility or equipment shall be closer than five (5) feet from the street curb or edge of pavement if no curb is present, unless otherwise approved by the City Engineer. 9) No attachment to a utility pole owned by any utility not owned or operated by the City of Hoover unless an express waiver is provided from said owner. 10) No facility or equipment shall be placed on any arms or any horizontal structure used to support or mount traffic control signals or other traffic control devices. 11) No facility or equipment shall materially interfere with electrical lines, cable lines, or their associated equipment, in that wireless facilities must be placed at least 20 feet away from energized electrical distribution lines, unless otherwise approved by the utility company. 12) No wireless facility may be hung from energized lines or mounted on poles suspending energized lines or on poles to be removed in conjunction with the city's desire to utilize undergrounding of electrical utilities in a particular area. f. The Applicant or its successor(s) must remove the small cell facilities at any time if warranted by public health or safety as determined by the city. g. Limitations. 1) Wireless facilities collocated, if allowed, on the same utility pole as a street light shall be on the same disconnect as the street light, where practicable. 2) Facilities shall be grounded and otherwise comply fully with all applicable electrical codes. 3) Whenever a conduit of wireless facilities crosses telephone or electric power wires, wires shall cross and be maintained in accordance with the National Electrical Code, the National Electrical Safety Code, and as promulgated by the City of Hoover Building & Inspections and other related city departments. 4) Facilities must comply with the applicable structural requirements with respect to wind speed. h. Applicant shall at all times comply with and abide by all applicable provisions of the state and federal law and city ordinances, codes and regulations in placing and maintaining facilities in the city right-of-way. i. The burden of proof shall at all times be on the Applicant to establish compliance with requirements under this article and state and federal law. j. No placement or maintenance of small cell facilities or their operation thereof shall commence until all applicable permits are obtained, and no operation shall occur unless the city has conducted a final inspection and issued a Certificate of Completion and license to continue, except in case of emergency. The term "emergency" shall mean a condition that affects the public's health, safety or welfare, which includes an unplanned out-of-service condition of a pre-existing service. A permit shall still be required after-the-fact within thirty (30) days if a permit would have originally been required to perform the work undertaken in the city right-of-way in connection with the emergency. Once the emergency is abated, the small cell facilities in question must be removed unless permitted without the emergency as a basis. k. Factors Considered in Awarding Permit. When determining whether to issue a permit for placement of Small Cell Facilities and associated structures on the right-of-way, the Mayor or his designee and/or subsequently upon appeal or request, the Planning & Zoning Commission, may consider as follows: 1) The demonstrated need for placing the structures at the requested location and geographic area in order to deliver or enhance personal wireless service; 2) The visual impact of placing the Support Structures or Facilities in the subject area; 3) The character of the area in which the structures are requested, including surrounding buildings, properties and uses; 4) Whether the appearance and placement of the requested structures is aesthetically consistent with the immediate area; 5) Whether the structures are consistent with the historic nature and characteristics of the requested location; 6) The Applicant's network coverage objective and whether the Applicant should use available or previously unconsidered alternative locations to place the Support Structures or Facilities; 7) Colocation. To the extent practical, all Facilities and associated Accessory Equipment that are placed in the city shall be attached to a pre-existing Support Structure that is owned, controlled or leased by a utility, franchisee, the city or other entity. If the Applicant demonstrates that no colocation opportunities exist in the area where a technologically documented need for a facility exists, the Applicant may request that a new pole or other Support Structure be installed in that area for purposes of constructing the Facilities. Before any new Support Structure is permitted, each of the following must occur: a. The Applicant must have provided the city written evidence that no practical colocation opportunity exists. This evidence shall include, but not be limited to, affidavits, correspondence, or other written information that demonstrates that the Applicant has taken all commercially reasonable actions to achieve colocation in the requested location or area, that the Applicant has pursued but been denied access to all potential colocation sites in the subject area (and the reasons any such denial(s)), and otherwise show that the Applicant is unable to co-locate on an existing Support Structure; b. The City Engineer must recommend the placement of a new Support Structure in the right-of-way; and c. The Director of Building & Inspections or Mayor's designee will approve recommendation of the City Engineer to allow the issuance of a permit that includes placement of a new support structure in the right-of-way as soon as practical after the recommendation is made. 8) If a facility is attached to a utility pole or other Support Structure in the right-of-way, no antenna or other part of the facility shall extend more than ten (10) feet above the height of that structure; provided that, in the event that the Applicant demonstrates that National Electric Safety Code, National Electric Council, or International Code regulations (as maintained and adopted by the city) or other factors create an undue hardship in complying with this height requirement, the Building Official may permit a facility to extend up to fifteen (15) feet above the height of such Support Structure unless it creates a life safety issue; 9) The Accessory Equipment shall, if reasonably possible, be placed at least eight (8) feet above the ground; 10) The color of antenna and Accessory Equipment shall be compatible with that of the Support Structure; 11) The Facility (including the Accessory Equipment) shall not be illuminated unless required by federal regulations; 12) Whether the proposed installation could cause harm to the public or poses any undue risk to public safety; 13) Whether the proposed installation may interfere with vehicular traffic, passage of pedestrians, or other use of the right-of-way by the public; and 14) If the proposed installation will disturb conditions on the right-of-way, whether the Applicant can demonstrate its ability and financial resources to restore the subject area to its pre-existing condition following installation. 15) If the proposed new pole will be compatible with the design and character of the surrounding neighborhood. l. As the city recognizes that a lack of competitive land-based internet access options may exist for certain residential areas (which means an area with fewer than two options via coaxial cable, copper lines, fiber, or other land-based internet), the Director of Building & Inspections may approve an applicant for permit and placement of small cell facilities in the city right-of-way solely to provide increased internet coverage. This provision shall not be a cause for denial of a permit or placement by a wireless service provider or wireless infrastructure provider.

(Ord. No. 18-2378, 6-4-18)

Ask a question about Hoover law

Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.