For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-3 — Permits

Code of Ordinances of the City of Hoover, Alabama (Supplement 23, published 2025-05-19 (Municode online 2026-03-30).) · Hoover Municipal Code § 6-3

Corpus is an independent public-information project, not the official City of Hoover website. Stable reference: corpuslaw.us/code/82d2374e-7b4c-4f45-87dc-f70cd04fcd94

Sec. 6-3. - Permits.

(a) Each person engaged in excavation work, street paving, street repairing, building or constructing any individual building or remodeling, adding to, air conditioning, commercial roofing, commercial reroofing, storage tanks, fire sprinkler systems or repairing any existing building, shall submit plans of each building, construction, addition, remodeling, air conditioning, commercial roofing, commercial reroofing or repair, and copies of bona fide signed contracts or other evidence of cost of the above referred to work to the building inspector and shall, before beginning such work, take out and secure a building permit for each building, construction, extension, remodeling, air conditioning, commercial roofing, commercial reroofing, or repairing from the city. For the purpose of determining the fee for the issuance of a building permit, the evaluations of the requested work shall be determined by bona fide signed contracts or other evidence of cost as submitted by the persons, firms or corporations requesting a building permit; however, in no event shall the evaluation of new structures or additions be less than the average cost of construction as set out in the International Code Council Building Evaluation Data published, as revised, published bi-monthly beginning in February 2017. The following charges shall be made for the issuance of building permits based on the contract or estimated cost as referred to herein: (1) Construction or repair of building or structure: a. One dollar ($1.00) to one thousand dollars ($1,000.00): Sixty dollars ($60.00). b. One thousand one dollars ($1,001.00) and above: Nine dollars and zero cents ($9.00) per thousand or a fraction thereof together with a base rate of one thousand five hundred dollars ($1,500.00) for each new residential dwelling unit (townhouse, dwelling house, condominium and each apartment unit). For each commercial building, the rate shall be nine dollars and zero cents ($9.00) per thousand or a fraction thereof. (2) Plumbing permits: Plumbing permits shall be furnished upon the payment of fees based upon the following schedule: Up to and including six (6) fixtures (min.) .....$10.00 Each additional fixture .....2.50 Sewer connection .....5.00 Water service .....5.00 Reinspection .....5.00 (3) Gas permits: Gas permits shall be furnished upon the payment of fees based upon the following schedule: Floor furnaces, central heating furnaces, central heating boilers, unit heaters, recessed heaters, room heaters-vented, infra-red radiant heaters, conversion burners, incinerators, ovens, clothes dryer, and other: BTU input | Fee 50,000 or less | $ 5.00 each 50,001—65,000 | 7.50 each 65,001—150,000 | 10.00 each 150,001—300,000 | 20.00 each Over 300,000 | 25.00 each General repairs .....$10.00 each Water heater—Gas or electric .....3.00 each Range (commercial) .....5.00 each Appliance vents when separate .....3.00 each Induced draft fans .....5.50 each Draft control switch .....5.50 each Barometric dampers .....5.50 each Reinspection fees Each inspection .....5.00 each Consumer piping outlets: a. For issuing permit, a fee of $5.00 will be charged. b. In addition, a charge of $5.00 for one (1) to four (4) outlets and $1.00 for each additional outlet (over four (4) outlets). (4) Blasting permits: A fee of five dollars ($5.00) shall be charged for each blasting permit. Each person, firm or corporation filing application for a blasting permit shall, before such permit is issued, furnish the city clerk a certificate of current insurance coverage which must be in the following minimum amounts: Bodily injury—$100,000.00 for each accident. Property damage (aggregate)—$300,000.00 applicable to the proposed work in Hoover. (5) Street cutting permits: A fee of fifty-four ($54.00) shall be charged for each street cutting permit. Each person, firm or corporation filing application for a permit to cut a street in the city shall, before such permit is issued, furnish the city clerk a minimum cash deposit of one hundred twenty-five (125) percent of the total repair cost applicable to the proposed work in Hoover with a minimum fee of two hundred dollars ($200.00). Said deposit shall be returned to party purchasing permit after the building inspector for the city has ascertained that the street on which the work was completed has been satisfactorily repaired. If the person, firm or corporation to whom the street cutting permit was issued fails to satisfactorily repair the street within one (1) week from the date of completion of the work for which such street was cut, then the city shall apply any or all of said cash deposit toward having such street satisfactorily repaired and the balance, if any, shall be refunded to the purchaser of the permit. (6) Electrical permits: Electrical permits shall be furnished upon the payment of fees based upon the following schedule: Wiring to Outlets | Installation of Fixtures 1 to 5 $ 5.00 | 1 to 20 $ 5.00 6 to 15 7.00 | 21 to 50 7.00 16 to 25 8.50 | 51 to 100 14.00 26 to 40 10.00 | 101 to 500 21.00 41 to 60 12.50 | 501 to over 42.00 61 to 80 14.00 81 to 100 15.50 101 to 200 18.00 201 to 500 36.00 501 to 1000 70.00 1001 to over 87.00 Wiring for Motors, Generators and Transformers 1 H.P. or less; 750 watts of less .....$2.50 Over 1 H.P. and less than 5 H.P.; under 750 watts .....4.00 Over 750 watts and less than 1,750 watts .....4.50 5 H.P. and over; 3,750 watts and over .....6.50 Meter loop (per 100 AMP) .....2.00 New service .....2.50 Reinspection fees: Each inspection .....5.00 (7) Moving of any building or structure: Fifty-four dollars ($54.00). (8) Demolition of any building or structure: Fifty-four dollars ($54.00) (b) Where work for which a permit is required by this chapter is started or proceeded with prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this chapter in the execution of the work nor from any other penalties prescribed herein. (c) Commercial plan review fees. This fee shall be paid at time of submittal. Plan review fee for commercial projects shall be as follows: COMMERCIAL PLAN REVIEW SCHEDULE PROJECT VALUATION | FEE New Building | 25% Existing Buildino - Under $25,000.00 | $50.00 Existing Building - Over $25,000.00 | $150.00 Plan Revision Fee | $100.00 (d) Residential plan review fees. The plan review fee for residential dwellings shall be, as follows: RESIDENTIAL PLAN REVIEW FEE PROJECT VALUATION | FEE Under $25,000.00 | $25.00 Over $25,000.00 | $50.00 Plan Revision Fee - One Page | $25.00 Plan Revision Fee - Two or More Pages | $50.00 (e) Working without a permit. The working without a permit fee shall be, as follows: WORKING WITHOUT A PERMIT STOP WORK ORDER | FEE 1st Stop Work Order | Double Permit Fee 2nd Stop Work Order | Triple Permit Fee Additional Stop Work Orders | Triple Permit Fee

(Ord. No. 212, § 1, 11-8-76; Ord. No. 320, § 1, 3-16-81; Ord. No. 86-485, § 1, 6-2-86; Ord. No. 86-569, § 1, 12-15-86; Ord. No. 90-932, 10-1-90; Ord. No. 94-1256, 6-6-94; Ord. No. 09-2181, § 10.A—10.C, 11-16-09; Ord. No. 17-2358, § 1.A, 12-18-17; Ord. No. 24-2641, § 1.A—1.E, 5-6-24)

Ask a question about Hoover law

Corpus searches the Hoover sections it holds and shows the ones that match, with their citations. Free, no sign-in.