For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-36 — Schedule of mechanical permit fees

Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 11-36

Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/255721f7-e6df-4e4b-8664-bf81d922f64b

Sec. 11-36. - Schedule of mechanical permit fees.

On mechanical system alterations, repairs and installations, a permit fee for each permit shall be paid at the time of filing an application. The applicable permit fees required by the city shall be determined in accordance with the schedule of fees as listed and do not include fees required by other departments or agencies (see section 11-32, applicability) (1) Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Mechanical permits shall not be required for the following: a. Gas: 1. Portable heating appliance. 2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. 3. Any appliance, equipment, fuel system, fuel storage, methods or materials that have been deleted from the International Mechanical Code by means of local ordinance. b. Mechanical: 1. Portable heating appliance. 2. Portable ventilation equipment. 3. Portable cooling unit. 4. Steam, hot water or chilled water piping within any heating or cooling equipment regulated by this code. 5. Replacement of any part which does not alter its approval or make it unsafe. 6. Portable evaporative cooler. 7. Self-contained refrigeration system containing ten (10) pound (4.54 kg) or less of refrigerant and actuated by motors of one (1) horsepower (746 W) or less. 8. Portable fuel cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid. 9. Boilers and pressure vessels. (2) Mechanical fee schedule. On all mechanical installations requiring a mechanical permit, a fee for each permit shall be paid as required at the time of filing the application, in accordance with the schedule that follows. On construction or addition projects where work is performed by all building trades, the general contractor, homebuilder, or owner will be required to pay the permit fees for all building trades (building, electrical, gas, mechanical and plumbing). However, it shall be the responsibility of the subcontractors to permit all work in accordance with applicable state laws prior to starting work. On alterations, repairs, addition or construction projects where work is not being performed by all building trades, it shall be the responsibility of each general contractors, homebuilders, owners and subcontractors to pay for permit fees separately and in accordance with the respective fee schedule. All work shall be permitted in accordance with applicable state laws prior to starting work. a. New buildings or additions: Included in the building permit fee b. Minimum permit fee .....$30.00 c. Installation of air-conditioning and/or heating systems in single-family residences: .....60.00 d. Addition of air-conditioning and/or heating systems in single-family residences: .....60.00 e. Installation of air-conditioning and/or heating systems in apartments, per apartment: .....30.00 f. Installation of air-conditioning and/or heating systems in duplexes: .....60.00 g. Installation of air-conditioning and/or heating systems in commercial buildings up to 5 tons, per tenant space: .....40.00 Over 5 tons, per tenant space, per ton .....5.00 h. Replacements of any one heater, air handler, condensing unit and/or cooling tower only in commercial buildings, shall require a fee of one-half (½) of systems (see "5") with a minimum fee of $40.00. i. Replacement of heating and/or air conditioning equipment in single-family residence: .....$30.00 j. Replacement of heating and/or air conditioning equipment in multi-family dwellings, per apartment .....$30.00 k. Commercial exhaust hoods (canopy) .....$30.00 l. Relocation of equipment .....$30.00 (i.e., condenser from roof to ground, etc.) m. In multi-family or commercial buildings where self-contained units of less than two (2) tons are to be installed, the fee charged shall be based on the total tonnage of all units combined (see "5" installation of air conditioning and/or heating system in apartments). n. Adding or changing ductwork: Residential: .....$30.00 Commercial First system .....$50.00 Additional systems (each) .....$25.00 o. Plan review fees (include all building trades): See section 11-34 p. Duplicate permit fee. .....$10.00 q. Request for information: See section 11-34 r. Certificate of final inspection fee: See section 11-34 s. Certificate of final inspection fee: See section 11-34 t. Minimum housing inspection fee .....$20.00 u. Mobile home or modular building fee (mechanical only) .....$50.00 v. Re-inspection fees: See section 11-34 w. Weekend and emergency inspections: See section 11-34 x. Construction board of appeals: See section 11-34 y. Failure to obtain permit: See section 11-34 (Other penalties in accordance with chapter 1 of the Mobile City Code may also apply) z. Permit fee extension: See section 11-34. aa. Other permit fees: Where no permit fees are listed, the city shall determine the required permit fee. bb. Three (3) percent of all permit fees shall be designated for training, education and equipment for the department. cc. Permit issuance fee: $1.00 fee shall be assessed to all permits issued. dd. Refrigeration: Min. $10.00 plus $10.00 first $1,000.00 of value plus $4.00 each additional $1,000.00 of value. (3) Miscellaneous. a. A separate permit shall be required for each building or tenant unit for shell buildings. All roof drain and conductor pipes must be marked on permit. b. Whenever a sub-contractor is dismissed from a job, an administrative fee of $100.00 shall be required to issue a permit to the new sub-contractor. The new sub-contractor shall re-permit the mechanical portion of the project. c. On jobs where a general contractor or homebuilder is dismissed, a new set of plans may be required for review and the remaining portion of the work shall be permitted. d. It shall be the responsibility of the permit holder to provide the city with an adjusted valuation of all construction including, but not limited to, cost overrun(s) and change order(s) within forty-five (45) days of completion of said project. e. On new construction and additions, the general contractor, homebuilder or owner will be required to submit the name, address and phone numbers of all trade sub-contractors. (4) Permit fee refund. See section 11-38.

(Ord. No. 11-006-2006, § 9, 12-19-06; Ord. No. 28-052-2022, art. 9, 11-8-22)

Ask a question about Mobile law

Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.