§ 11-39 — Schedule of gas permit fees
Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 11-39
Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/fc05434c-346c-4c52-ba59-f6c8ebe6a839
Sec. 11-39. - Schedule of gas permit fees.
On gas system alterations, repairs and installations, a permit fee for each permit shall be paid at the time of filing an application. The applicable permit fees required by the city shall be determined in accordance with the schedule of fees as listed and do not include fees required by other departments or agencies (see section 11-32, applicability). (1) Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Gas permits shall not be required for the following: a. Portable heating appliances. b. Replacement of any minor component of equipment that does not alter approval of such equipment or make such equipment unsafe. c. Any appliance, equipment, fuel system, fuel storage, methods or materials that have been deleted from the International Fuel Gas Code by means of Local Ordinance. (2) Gas fee schedule. On all gas installations requiring a gas permit, a fee for each gas permit shall be paid as required at the time of filing the application, in accordance with the schedule that follows. On construction or addition projects where work is performed by all building trades, the general contractor, homebuilder, or owner will be required to pay the permit fees for all building trades (building, electrical, gas, mechanical and plumbing). However, it shall be the responsibility of the subcontractors to permit all work in accordance with applicable state laws prior to starting work. On alterations, repairs, addition or construction projects where work is not being performed by all building trades, it shall be the responsibility of each general contractors, homebuilders, owners and subcontractors to pay for permit fees separately and in accordance with the respective fee schedule. All work shall be permitted in accordance with applicable state laws prior to starting work. a. New buildings or additions: Included in the building permit fee b. Permit (based on valuation of work): $1.00 to $1,000.00, minimum $30.00 c. $1,000.00 and over: $8.00 per each additional $1,000.00 or fraction thereof d. Each inspection will be .....$5.00 e. Each additional inspection (after permit issuance) .....7.00 (Minimum permit is $30.00) f. Mobile home or modular building fee (gas only and does not include premise or structure gas piping) .....50.00 g. Plan review: See section 11-34 h. Duplicate permit fee: See section 11-34 i. Request for information: See section 11-34 j. Certificate of final inspection fee - Residential: See section 11-34 k. Certificate of final inspection fee - Commercial: See section 11-34 l. Re-inspection fees: See section 11-34 m. Weekend and after hour inspections: See section 11-34 n. Construction board of appeals (each request): See section 11-34 o. Failure to obtain permit: See section 11-34 (Other penalties in accordance with chapter 1 of the Mobile City Code may also apply) p. Permit fee extension: See section 11-34. q. Other permit fees: Where no permit fees are listed, the city shall determine the required permit fee. r. A separate permit shall be required for each building or tenant unit for shell buildings. All roof drain and conductor pipes must be marked on permit. All additional fixtures and inspections must be paid before release to water board or letter of inspection is issued. s. Three (3) percent of all permit fees shall be designated for training, education and equipment for the department. t. Permit issuance fee: $1.00 fee shall be assessed to all permits issued. (c) Miscellaneous. (1) A separate permit shall be required for each building or tenant unit for shell buildings. All additional fixtures and inspections must be paid before release to water board or letter of inspection is issued. (2) Whenever a sub-contractor is dismissed from a job, an administrative fee of one hundred dollars ($100.00) shall be required to issue a permit to the new sub-contractor. The new sub-contractor shall re-permit the gas portion of the project. (3) On jobs where a general contractor or homebuilder is dismissed, a new set of plans may be required for review and the remaining portion of the work shall be permitted. (4) It shall be the responsibility of the permit holder to provide the city with an adjusted valuation of all construction including, but not limited to, cost overrun(s) and change order(s) within forty-five (45) days of completion of said project. (5) On new construction and additions, the general contractor, homebuilder or owner will be required to submit the name, address and phone numbers of all trade sub-contractors. (d) Permit fee refund. See section 11-38.
(Ord. No. 28-052-2022, art. 11, 11-8-22)
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.
