§ 57-241 — Permittee tag identification requirements
Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 57-241
Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/021ee844-55d9-41a2-bb9b-ea4f7962811a
Sec. 57-241. - Permittee tag identification requirements.
(a) Permittees are required to install an identification tag on all asphalt roadway surface overlays or patches required by the construction standards and on all temporary asphalt overlays or patches of any concrete roadway surface or concrete sidewalk surface. (b) Identification tags are not intended to identify underground utility infrastructure. They are intended to identify the permittee who is responsible for an asphalt overlay or patch and for maintaining the asphalt overlay or patch as required by this chapter and the construction standards. (c) Identification tags must be used on any temporary or permanent asphalt overlay or patch. Identification tag requirements will be established by the city engineer, but permittees are responsible for installing identification tags in accordance with the following guidelines: (1) Identification tags must be installed during the final layer of paving. The tags must be pressed into the asphalt before compaction of the final layer commences. All identification tags must be embedded at zero grade tolerance. (2) The use of nails, screws, staples, or other metal fasteners to secure tags is prohibited. (3) Identification tags should not be placed within twelve (12) inches of any casting unless space does not allow otherwise. Tags should be placed away from direct wheel traffic when possible. (4) The permittee is responsible for replacing damaged, faded, or missing identification tags during the life of any temporary overlay or patch and for a period of three (3) years after a permanent overlay or patch has been laid. (5) Identification tags must be placed in accordance with the guidelines in table 1. All laterals extending from the main patch must have their own tag placed in the center of the lateral. Table 1 Patch Length | Tag Placement Less than 50 feet | 1 tag placed in the center of the overlay or patch. 50 feet to 100 feet | 1 tag placed at each end of the overlay or patch a minimum of 12 inches from the end and edge and not in the wheel path, or as otherwise directed by the engineer. 100 feet to 400 feet | 1 tag placed at each end of the overlay or patch a minimum of 12 inches from the end and edge and not in the wheel path, and 1 tag placed in the center of the overlay or patch, or as otherwise directed by the engineer. An additional tag must be placed in the center of the overlay or patch at every intersecting street. Greater than 400 feet | 1 tag placed at each end of the overlay or patch a minimum of 12 inches from the end and edge and not in the wheel path, and at 200 linear foot intervals with each tag located a minimum of 12 inches from the edge and not in the wheel path, or as otherwise directed by the engineer. An additional tag must be placed in the center of the overlay or patch at every intersecting street.
(Ord. No. 57-005-2017, § 1, 3-16-17; Ord. No. 57-026-2017, § 6, 12-12-17)
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.