§ 1 — Construction plan submittal requirements within public rights-of-way and easements

Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code, App. B, § 1

Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/8682e97f-5914-4da4-872e-790b129eca28

Section 1. - Construction plan submittal requirements within public rights-of-way and easements.

1.1. Major projects. A) Major projects within roadway limits: 1) Construction plan submittal. Applicants for right-of-way permits shall submit three (3) sets of construction plans and specifications, including the following information, for review and approval: a) The location of all visible topographic features affected by the project within the right-of-way. b) Complete plan and profile sheets indicating the horizontal and vertical location of all components of the proposed project and other related information including, but not limited to, pipe and manhole flow line elevations, type and size pipe, and other related structures, profile and other elevations necessary for roadway and right-of-way restoration, and the design details of the proposed construction and pavement and right-of-way restoration will be required for gravity flow systems including sanitary sewer, storm drain and related projects. A plan indicating the location of the proposed project with respect to the centerline, edge of road, and right-of-way, tie-in to nearest street intersection, components and type material used, and dimensions and depth of the proposed installation, will be required for nongravity flow systems including water distribution systems, gas systems, communications, cable TV and electric power distribution systems, unless otherwise authorized by the city engineer. c) An erosion control plan and best management practices complying with provisions of the city's stormwater management ordinance. d) A safety plan to indicate methods to be used to protect the general public from injury, and including the proposed use of barricades, signs, lights, fencing and other barriers. e) A traffic control plan complying with all the provisions of the Federal Manual on Uniform Traffic Control Devices, current edition shall be submitted to the city traffic engineer. f) A landscape plan complying with the tree landscaping and protection ordinance; and g) Complete as-built construction plans of the construction project shall be submitted to the city engineer, after final inspection of the project. The as-built plans shall be submitted in hard copy medium or CAD files in DXF Format. B) Major projects outside roadway limits: 1) Construction plan submittal. Applicants for right-of-way permits shall submit three (3) sets of construction plans and specifications, including the following information for review and approval: a) The location of all visible topographic features within the right-of-way that will be impacted by the proposed project. b) Complete plan and profile sheets indicating the horizontal and vertical location of all components of the proposed project and other related information including, but not limited to, pipe and manhole flow line elevations, type and size pipe, and other related structures, profile and other elevations necessary for right-of-way restoration and the design details of the proposed construction, including the right-of-way restoration will be required for gravity flow systems including sanitary sewer, storm drain and related projects. A plan indicating the location of the proposed project with respect to the centerline, edge of road, and right-of-way, tie-in to nearest street intersection, components and type material used, and dimensions and depth of the proposed installation, will be required for nongravity flow systems including water distribution systems, gas systems, communications, cable TV and electric power distribution systems, unless otherwise authorized by the city engineer. [5] c) An erosion control plan with best management practices complying with provisions of the city's stormwater management ordinance. d) A safety plan to indicate methods to be used to protect the general public from injury, and including the proposed use of barricades, signs, lights, fencing and other barriers. e) A traffic control plan complying with all the provisions of the Manual on Uniform Traffic Control Devices, current edition shall be submitted to the city traffic engineer, if any roadway traffic is affected. f) A landscape plan complying with the tree landscaping and protection ordinance; and g) Complete as-built construction plans of the construction project shall be submitted to the city engineer, after final inspection of the project. The as-built plans shall be submitted in hard copy medium or CAD files in DXF Format. 1.2. Minor projects. A) Minor projects within roadway limits. 1) Construction plan submittal. Applicants for right-of-way permits shall submit a plat of the proposed project including the following information: a) A plat prepared at a scale acceptable to the city engineer to indicate the plan view of the proposed project, location with respect to centerline, edge of roadway, storm drain, and right-of-way, tie-in to nearest subdivision lot corner or street intersection, components and type material used for the project, and dimensions and depth of proposed installation. b) An erosion control plan with best management practices complying with provisions of the city's stormwater management ordinance. c) A safety plan to indicate methods to be used to protect the general public from injury, and including the proposed use of barricades, signs, lights, fencing and other barriers. d) A traffic control plan complying with all the provisions of the Manual on Uniform Traffic Control Devices, current edition, shall be submitted to the city traffic engineer, if any roadway traffic is affected; and e) Complete as-built construction plans of the construction project shall be submitted to the city engineer, after final inspection of the project. As built plans shall be submitted in hard copy medium or CAD files in DXF Format. B) Minor projects outside roadway limits. 1) Construction plan submittal. Applicants for right-of-way permits shall submit a plat of the proposed project including the following information: a) A plat prepared at a scale acceptable to the city engineer to indicate the plan view of the proposed project, location with respect to edge of roadway, centerline, storm drain, and right-of-way, tie-in to nearest subdivision lot corner or street intersection, components and type material used, dimensions and depth of proposed excavation. b) An erosion control plan with best management practices complying with provisions of the city's stormwater management ordinance. c) A safety plan to indicate methods to be used to protect the general public from injury, and including the proposed use of barricades, signs, lights, fencing and other barriers. d) A traffic control plan complying with all the provisions of the Manual on Uniform Traffic Control Devices, current edition shall be submitted to the city traffic engineer, if any impact on traffic movement is involved. e) A landscape plan complying with the tree landscaping and protection ordinance. f) Complete as-built construction plans of the construction project shall be submitted to the city engineer, after final inspection of the project. The as-built plans shall be submitted in hard copy medium or CAD files in DXF Format.

(Ord. No. 57-009-2021, art. 1, 3-2-21)