Section 2. - Bond requirements.
2.1. Construction bond. The applicant shall be required to provide an irrevocable, unconditional letter of credit or bond to guarantee the proper construction and completion of right-of-way restoration. The amount of the bond shall be based on the estimated cost of the required right-of-way restoration provided by the permittee and approved by the city engineer. A construction bond will not be required for small projects if no paved area or right-of-way is disturbed by the project. The city engineer may waive the requirement for the construction bond for permittees who evidence financial ability to pay the cost of the repairs to the city's rights-of-way resulting from their permitted activity. 2.2. City departments performing installation of facilities, routine maintenance and repair, and other agencies working in the right-of-way that are not involved in the installation, repair and maintenance of utilities, are exempt from the requirements of section 2.
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.