§ 6 — Right-of-way restoration within roadways
Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code, App. B, § 6
Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/4a6162d0-afe5-4ea2-9eac-8c04492b757d
Section 6. - Right-of-way restoration within roadways.
All construction procedures and materials utilized will be in compliance with Alabama Department of Transportation Standard Specifications for Highway Construction current edition. A geotechnical engineering company will be retained by the utility company or permittee, to conduct field testing to document and certify that all materials and compaction efforts are in compliance with Alabama Department of Transportation Standard Specifications for Highway Construction, current Edition and procedures specified in the city engineering department's design details for right-of-way restoration. 6.1. Major projects. 6.1.1. Asphalt road surface. A) Base construction. 1) Granular soil, sand clay base. The base course of the affected lanes shall be reconstructed full width. 2) Bituminous base, stone base. The base course of the affected lanes may be patched with equivalent base material if the structural integrity of the roadway has not been affected by the project, as determined by the geotechnical company. Otherwise, the base of the affected lanes shall be reconstructed full width. B) Wearing surface. The full width of the roadway surface shall be resurfaced within the limits of the project. Existing traffic striping and markings will be replaced. 6.1.2. Asphalt roadway surface overlay on existing concrete pavement. A) Base construction. The existing concrete street may be patched with concrete, if the structural integrity of the roadway has not been affected by the project, as determined by the geotechnical engineering company. Otherwise, the affected panels of the existing concrete street shall be reconstructed. B) Wearing surface. The full width of the roadway surface shall be resurfaced within the limits of the project. Existing traffic striping and markings will be replaced. 6.1.3. Concrete roadway surface. A) Base construction. The base course of the affected lanes shall be reconstructed full width as determined by the geotechnical company. B) Concrete pavement. The entire roadway panel sections of the affected lanes shall be reconstructed. If the structural integrity of the roadway has been significantly affected by the project, the city engineer may require the entire concrete surface, within the project limits, be reconstructed full width. Existing traffic striping and markings will be replaced. 6.1.4. Unpaved roadway surface. The entire roadway shall be surfaced with six (6) inches of stone within project limits. 6.2. Minor projects. 6.2.1. Asphalt roadway surface (sixteen (16) square feet or greater). For transverse service lines and miscellaneous installation and repair projects within excavated areas sixteen (16) square feet or greater, the entire width of the lane disturbed will be resurfaced from a point measured five (5) feet from the edge of the excavation each way longitudinally along the centerline of the roadway. If more than one (1) lane is disturbed, the entire width of the disturbed lanes will be resurfaced. If the replacement pavement is more than seventy (70) feet long or more than ten (10) percent of the roadway area within a block is affected, the entire roadway will be resurfaced within the block. Existing traffic striping and markings will be replaced. 6.2.2. Asphalt roadway surface (less than sixteen (16) square feet). For miscellaneous construction involving excavated areas less than sixteen (16) square feet, the area from the edge of the excavation extending one (1) foot outside the perimeter of the cut area will be resurfaced. If more than one (1) lane is disturbed, the entire width of the disturbed lanes will be resurfaced. If the replacement pavement is more than seventy (70) feet long or more than ten (10) percent of the roadway area within a block is affected, the entire roadway will be resurfaced within the block. Existing traffic striping and markings will be replaced. 6.2.3. Concrete roadway surface. The entire affected roadway panel sections, including base course, will be reconstructed joint to joint. Existing traffic striping and markings will be replaced. 6.2.4. Unpaved roadway surface. The entire roadway width will be surfaced with six (6) inches of stone from a point five (5) feet measured longitudinally along the roadway from the center of the excavation each way. 6.3. Jacking, boring, pushing, tunneling, retrofitting and pipe lining projects. Any pavement damage caused by these types of projects will be restored in conformance with provisions of sections 5, 6 and 7. Any existing pavement damage relating to the replacement, retrofitting, or pipe lining of damaged utilities will be restored in conformance with sections 5, 6 and 7.
Ask a question about Mobile law
Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.
