For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 64-3-10 — Natural resource protection

Code of the City of Mobile, Alabama (Supp. No. 67: codified through Ordinance No. 36-017-2026, adopted March 1, 2026) · Mobile City Code § 64-3-10

Corpus is an independent public-information project, not the official City of Mobile website. Stable reference: corpuslaw.us/code/369a3743-693d-436d-990f-1f2e0912d080

Sec. 64-3-10. - Natural resource protection.

A. Applicability. This section applies to applications for development or redevelopment activities. B. Generally. 1. Site plans for development and redevelopment projects should incorporate measures to the greatest extent practicable that: (a) Preserve or minimize the disturbance of natural scenic features, such as streams, creeks, rivers, Mobile Bay, wetlands and undeveloped floodplains; (b) Protect natural scenic features and resources or use them as amenities; and (c) Utilize appropriate measures to protect water quality within on-site or adjacent waterways. 2. The applicant is responsible for assuring compliance with all local, state and federal regulations regarding endangered, threatened or otherwise protected species. 3. All development projects shall use water quality protection measures which comply with chapter 17 of the city Code, as well as all applicable federal, state and local regulations. C. Riparian buffer (RB). 1. Applicability. (a) Findings. The city finds that riparian buffers (RBs) benefit water quality because they: (1) Protect, restore and maintain the chemical, physical and biological integrity of creeks, streams, and water bodies and their associated functions and resources; (2) Improve water quality by filtering pollutants, nutrients, sediment and other contaminants out of the water; (3) Reduce erosion and sedimentation; (4) Protect and stabilize creek, stream and river banks and drainage channels; (5) Maintain base flow of streams, creeks and drainage channels by aiding in groundwater recharge, and thereby protect dry weather low flows in streams; (6) Contribute organic matter that is a source of food, energy and habitat for the aquatic ecosystem; and (7) Provide tree canopy to shade streams and promote desirable aquatic habitat including but not limited to the moderation of water temperature in streams. (b) Jurisdiction. This section applies to new commercial or residential development or redevelopment on parcels of two (2) acres or greater containing or abutting water bodies. (c) Exemptions. The following items are exempt from the RB standards; however, protection of the RB to the maximum extent practicable is encouraged: (1) Existing public streets, utilities and related appurtenances; (2) Stream crossings for public or private utility lines; (3) Streets and stormwater infrastructure and related appurtenances required to be dedicated to the city; (4) Public drinking water, public wastewater, water treatment facilities, public stormwater infrastructure and related appurtenances; (5) Multi-use trails, boardwalks and facilities for access (such as boat and kayak launches and docks) to designated water bodies, pedestrian bridges and associated appurtenances; (6) A standard width driveway necessary to provide vehicular access to an existing lot of record; (7) Construction of one residential dwelling and customary accessory structure(s) and appurtenances on an existing lot of record, within R-1, Single-Family and R-2, Two-Family Residential Zoning Districts to prevent the potential loss of all reasonable and beneficial use of property due to RB standards. (8) Development within the following districts are subject only to the stream crossing requirements see article 3, subsection 64-3-10.C.6: a. R-B, Residential Business; b. H-B, Historic Business; c. T-B, Transitional Business; d. B-4, General Business; e. And the urban districts of: 1. B-1, Buffer-Business; 2. LB-2, Limited Neighborhood Business; 3. B-2, Neighborhood Business; and 4. B-3, Community Business. (9) Environmental monitoring and remediation activities such as water quality monitoring, stream gauging activities and soil and groundwater monitoring or remediation; (10) Removal of dead, dying, diseased or hazardous trees, as authorized by the urban forester; provided, however, no grubbing, grading or stump removal shall be allowed; (11) Removal of existing impervious cover from the RB when adequate measures are in place to prevent erosion and sedimentation; (12) Activities on owner-occupied, single-family, residential lots to protect, restore or enhance stream bank stability, vegetation, water quality or aquatic habitat. No clearing, grubbing or grading shall be conducted without prior issuance of a land disturbance permit; (13) Routine access to, maintenance, repair, improvements or cleaning of publicly maintained creek segments, drainage channels, conveyances or other water body, by the city or its designee; and (14) Permitted activities associated with restoring or enhancing the water body, banks of the water body, or adjacent riparian areas, by creating, enhancing or restoring the RB, or when removing/eradicating invasive vegetation or replanting with native vegetation. 2. Determining the origin of the riparian buffer. (a) The point of origin of the RB occurs at the top of bank, or mean or ordinary high water line. Measurement for the RB begins at the point of origin and extends landward parallel to the point of origin for the length of the water body within or abutting the development site. The observed location of the point of origin may typically be characterized by: (1) A change in bank slope from steep to gentle slope; or (2) If a change in slope is not discernable, the point of wrested vegetation—this refers to the point at the edge of a water body where vegetation has moved or removed as a result of normal stream flow, wave or tidal action; or (3) The waterward face of any vertical bulkhead, gabion or retaining wall along a hardened shoreline occurring at the location of the mean or ordinary high water line. (b) If the point of origin cannot be determined from the above indicators or if there is a dispute in the determination, the location may be determined by submitting approved engineering data/analysis that determine the width of the water body resulting from the two-year frequency storm (as defined in city Code chapter 17). (c) The point of origin may also be located and described on a boundary and topographic survey or special purpose survey, prepared by a professional land surveyor or professional engineer licensed by the State of Alabama. (d) It shall be the responsibility of an applicant to submit all documentation, exhibits, data, analysis, studies, surveys, etc., for the purpose of establishing or verifying the point of origin and the extent of the RB on their site. 3. Riparian buffer zones (RBZ). (a) The RBZ may consist of up to three (3) zones, as described below. The RBZ may or may not include all zones, depending on water body characteristics and adjacent physical and vegetative conditions. The width of RBZ zones vary, depending on all of the criteria found in table 64-3-10.1, riparian buffer zones and widths. (b) Where interpretation is needed as to the exact location of the areas of special flood hazard, or location of the regulatory floodway (for example, where there appears to be a conflict between a mapped boundary and field conditions), the city engineer shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation, as defined in city Code chapter 17. (c) The RB width may be established on an average width basis, with a minimum width of at least eighty (80) percent of the maximum applicable width of all zones, at any measured location. Table 64-3-10.1 Riparian Buffer Zones and Widths. Water Body Characteristics or Location | RB Zone and Width Zone 1 | Zone 2 | Zone 3 | Maximum Applicable Width* The area closest to the water body, which begins at the point of origin consisting of a mix of wetland herbaceous and woody vegetation that has floodplain and/or wetland characteristics. | The area between Zone 1 and Zone 3, typically composed of native vegetation; this zone also acts to slow and absorb contaminants that Zone 3 has missed. | This zone is important as the first line of defense against contaminants. It serves primarily to slow water runoff and begin to absorb contaminants before they reach the other zones. | * Does not supersede requirements of the FEMA National Flood Insurance Program, or regulations administered by city engineering. Within a FEMA regulatory floodway, as shown on the adopted flood insurance rate map (FIRM) | Variable width | Variable width | Variable width | 105' width Water body occurring within a designated special flood hazard area (V, A or AE) | Variable width | Variable width | Variable width | 85' width Tributary upstream of, but not within, a special flood hazard area | Variable width | Variable width | N.A. | 50' width Figure 64-3-10.1 Riparian Buffer [image omitted; see the official code] 4. Uses and activities within riparian buffer zones. Permitted and prohibited uses within RBZs are established below, subject to compliance with the FEMA National Flood Insurance Program. Uses not expressly listed in table 64-3-10.2, uses and activities in riparian buffers, are not permitted in RBZs, unless exempted by article 3, subsection 64-3-10.C.1(c). Table 64-3-10.2 Uses and Activities in Riparian Buffers Use or Activity | Riparian Buffer Zone 1 | Zone 2 | Zone 3 Building or structure | — | — | 10%* Yards | — | 20% | R Picnic areas | — | R | R Walking trails | — | R | R Greenways | R | R | R Landscaped areas | — | R | R Wildlife habitat | R | R | R Roadway and sidewalk stream crossings | R | R | R Riprap/hard armor | S | — | — Parking spaces (encouraged to be LID or permeable pavement) | — | — | 10% R = allowed by right, S = Special Exception approval required, "—" = prohibited, % = encroachment allowed within the applicable RB zone, * = encroachment shall not block access to the waterbody as necessary for routine maintenance. 5. Standards for riparian buffer application. (a) Residential developments. Within new residential developments or subdivisions containing two or more dwelling units, the riparian buffer shall be located entirely within common open space areas on the site, and defined as such within a recorded subdivision plat. The general notes section of the plat, or approved site plan when platting is not required, shall include a note providing that the riparian buffer area shall remain intact and undisturbed during and following site development, or disturbed only as may be consistent with the uses, activities or encroachments provided by this section. (b) Conservation developments. In order to encourage the location of development within the R-1, Single-Family Residential - Conservation Zoning District landward of the boundaries of the RB in new low density residential Developments or subdivisions, the transfer of allocated residential density from land areas within the RB to adjacent areas beyond the extent of the RB is permitted. All areas of a site from which density has been transferred shall be prohibited from future development through restrictive covenants recorded in the office of the probate judge of Mobile County Alabama, with a copy of the recorded covenants provided to the director. When implemented, such on-site density transfer shall: (1) Occur within contiguous property under the same ownership or control; (2) Be located within a designated R-1, Single-Family Residential - Conservation Zoning District; (3) Provide for development consistent with the R-1, Single-Family Residential - Conservation Zoning District as described in article 2; and (4) Not result in development which is inconsistent with other applicable city, state and federal regulations. (c) Commercial developments. To offset the implementation of RB standards within new commercial development occurring adjacent to applicable stream segments or water bodies, the maximum building site coverage allowances of the zoning district designation for the development site may be increased by up to ten (10) percent in the following zoning districts: B-1 Suburban; LB-2 Suburban; B-2 Suburban; B-3 Suburban; B-5; CW and MM. (d) Water dependent maritime uses. The development or redevelopment of sites for water dependent, maritime, shipping or port-related activities are not subject to application of the RB standards described herein, but must provide an acceptable stormwater management plan for review and approval by city engineering. 6. Stream crossings. Construction or repair of structures that cross streams are subject to the following: (a) A hydraulic analysis, along with a structural analysis and design of any structure, designed, signed and sealed by a professional engineer licensed to practice in the State of Alabama is required to be submitted for any proposed stream crossing. The submittal will be reviewed by city engineering for compliance with AASHTO, ADEM, FEMA and applicable federal, state and local design standards along with city Code chapter 17. The analyses shall demonstrate that the proposed crossing will not adversely impact upstream and downstream properties during a one hundred-year flood, as defined by city Code section 17-2; and (b) Free-span techniques shall be employed, to the extent practicable, to prevent blockage or constriction of natural drainage ways; and (c) Approximately perpendicular crossing angles shall be employed, where hydraulically appropriate, and crossings shall be aligned to minimize RB disturbance to the maximum extent practicable; and (d) Best management practices shall be utilized for minimization of erosion and sedimentation, in accordance with the Alabama Handbook for Erosion and Sediment Control and Stormwater Management on Construction Sites and Urban Areas; and (e) Stream banks shall be properly stabilized, and the impacted RB shall be revegetated following any stream crossing; and (f) Slopes adjacent to waters shall be left in a stabilized condition upon completion of the project. 7. Mitigation. Uses or development activities not otherwise permitted within a RB, which are deemed unavoidable because the impacts within the RB cannot be eliminated through revised site design, clustering, setbacks, structural alternatives or reliance on other land development practices; require a mitigation plan prepared by a professional engineer licensed in the State of Alabama and approved by the city engineer and may be allowed by special exception. (a) A mitigation plan approved by the city engineering is required as a condition for a special exception to RB standards to ensure that post-development conditions are at least as protective of water quality as pre-development conditions. The mitigation plan shall include, at a minimum, one or more of the following options: (1) Implementation of stormwater quality improvement measures or stormwater quantity reduction measures as specified by the Alabama Handbook for Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas; (2) Stream or wetland restoration which shall be designed and accomplished under the guidance and supervision of a credentialed environmental professional with adequate training and experience, and subsequently maintained by the applicant; (3) Buffer revegetation, which shall be designed and accomplished under the guidance and supervision of a credentialed environmental professional with adequate training and experience, and subsequently maintained by the applicant; (4) Reduction of post-development run-off volume to less than the pre-development volume levels as defined by city Code chapter 17; (5) Removal of existing impervious surfaces within the site which, combined with the entire site proposed impervious surfaces, results in a reduction of total impervious area; or (6) Green infrastructure or low impact development practices designed in accordance with the Low Impact Development Handbook for the State of Alabama. (b) Development or redevelopment of a site having a I-2, Heavy Industry or MH, Maritime Heavy Zoning District designation and containing an existing riprapped or hardened shoreline on the effective date of this section may deviate from the RBZ standards required by this section without a need to request a variance, subject to provision of an acceptable mitigation plan prepared by a professional engineer licensed in the State of Alabama. The mitigation plan shall be subject to review and approval by the city engineer, and shall include, at a minimum: (1) Reduction in stormwater runoff volume, velocity and pollutants resulting from a revegetated and regulated RBZ established as described in article 3, subsection 64-3-10.C.1(c)(3) above, consistent with the methodology required for a land disturbance permit in chapter 17 of the city Code; or (2) Equivalent mitigation, consistent with subsection (a) above, that achieves at least the same level of stormwater volume, velocity and pollutant control as the RBZ; or (3) A management system for non-point sources of stormwater runoff from existing developed sites which have not historically provided for treatment of stormwater runoff, consistent with the provisions chapter 17 of the city Code.

(Ord. No. 64-017-2022, 7-12-22)

Ask a question about Mobile law

Corpus searches the Mobile sections it holds and shows the ones that match, with their citations. Free, no sign-in.