For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.40.06 — Permit application procedures

Code of Ordinances of the City of Conway, Arkansas (Codified through Ordinance No. O-25-35, enacted April 22, 2025. (Supp. No. 10)) · Conway Code of Ordinances § 11.40.06

Corpus is an independent public-information project, not the official City of Conway website. Stable reference: corpuslaw.us/code/1145ccab-a671-4b2d-bf08-b34060fae95a

11.40.06 - Permit application procedures.

A. Permit required. 1. Before installing any wireless communication facility or wireless support structure in a right-of-way, a wireless service provider, or an affiliate duly authorized to act on behalf of a wireless service provider, shall submit an application to the designated office and receive a permit therefor, with respect to each such wireless communication facility or wireless support structure. 2. Subject to Section 7.7.3, before making any original attachment to any City or utility facility, a wireless service provider or an affiliate duly authorized to act on behalf of a properly licensed and authorized wireless service provider, shall submit an application and receive a permit therefor from the City or utility, with respect to each such utility pole or utility facility. B. Professional engineer. Unless otherwise waived in writing by the utility, as part of the utility's pole attachment permit application process, and at the wireless service provider's sole expense, a qualified and experienced professional engineer, or an employee or contractor of the wireless service provider who has been approved by the utility, must undertake and complete the engineering design and pole loading analyses calculations required in completing a permit application, participate in the pre-construction survey, conduct the post-construction inspection, and certify that the wireless service provider's wireless communication facilities can be and were installed on the identified poles in compliance with the applicable standards and in accordance with the permit. The professional engineer's qualifications must include experience performing such work, or substantially similar work, on electric transmission or distribution systems, and unless otherwise waived by the utility, such engineer must be licensed in the state. The utility may require the wireless service provider's professional engineer, employee or contractor to conduct a post-construction inspection that the utility will verify by means that it deems to be reasonable. 1. Pre-existing attachments. Unless updates or upgrades are required by applicable standards, or unless the utility provides notice to the contrary, wireless service providers shall not be required to obtain permits for authorized attachment(s) existing as of the effective date of this chapter. Such grandfathered attachments shall, however, be subject to the attachment fees specified in Section 11.40.34. Wireless service providers shall provide the City and utility a list of all such pre-existing attachments within six (6) months of the effective date of the ordinance from which this chapter derived but shall be subject to notification requirements. C. Submission of application for attachment permit. Wireless service providers shall submit a properly executed application, which, unless otherwise agreed by the utility, shall include a survey and detailed plans for the proposed attachments, including a description of any necessary make-ready work to accommodate the attachments, certified by a licensed professional engineer or City or utility approved employee or contractor of the wireless service provider. Wireless service providers shall use the application form provided. The City or utility may amend the application form from time to time, provided that any such changes are not inconsistent with the terms of this chapter, and are applied to all attaching entities on a non-discriminatory basis and reasonable advance written notice is provided to the wireless service provider of such changes. The City's or utility's acceptance of the submitted design documents does not relieve any wireless service provider of full responsibility for any errors and/or omissions in the engineering analysis. 1. Each application for wireless communication facilities may contain applications for up to a maximum of twenty-five (25) locations, provided that the proposed wireless communication facilities to be installed at each such location are of the same size, type and configuration. 2. Each application shall contain a detailed description of the wireless communication facilities proposed to be installed, including type of equipment, certification as to approval of FCC equipment compliance, the installation design, pole loading calculations, RF interference studies and documentation (datasheets and technical specifications of the antenna system) that confirms all RF emissions comply with applicable laws governing RF exposure levels, including FCC OET Bulletin 65. 3. Each application shall include a proposed attachment submittal of each device or design that has not been previously approved, which shall be considered a non-standard application. 4. Wireless service providers shall utilize generally accepted industry standard software for the pole loading analysis, including SPIDA Calc. 5. Reserved. 6. Each permit application shall contain a safety briefing for the type of wireless installation proposed, if not previously approved. 7. No wireless service provider, nor any person acting on behalf of a wireless service provider shall simultaneously submit more than one (1) permit application. No wireless service provider, nor any person acting on behalf of a wireless service provider, shall submit a permit application while such wireless service provider has a permit application under review. D. Review of application for attachment permit. Permit applications shall be reviewed in the order received. Unless otherwise agreed, under normal circumstances, the permit application review process shall be as follows: 1. Application for attachment with survey. If a wireless service provider's application includes a survey and detailed plans for the proposed attachments, including a description of any necessary make-ready to accommodate the attachments, the City or utility shall review and respond to such properly executed and complete permit application for routine installations as promptly as is reasonable, providing a response during normal circumstances within ninety (90) days of receipt. a. The City's or utility's response will either: (1) Concur with the proposed make-ready as described in the wireless service provider's application and engineering survey and provide a cost estimate for the utility's portion of that make-ready; (2) Provide the wireless service provider a revised make-ready analysis based on what make-ready work the utility reasonably determines is required as well as providing the wireless service provider a cost estimate for the utility's portion of that make-ready work; or (3) Provide a written explanation as to why the application is being denied, in whole or in part, for reasons of safety, reliability or insufficient capacity that cannot be resolved consistent with applicable standards, including City and county zoning and construction ordinances. 2. Application for attachment without a survey. The utility in its sole discretion may authorize a wireless service provider to submit an application without a pre-construction survey (including a description of necessary make-ready). In such case, the utility or its contractor engineer shall review the application and perform a pre-construction survey, and, if the attachment can be accommodated consistent with applicable standards, prepare a description of any necessary make-ready to accommodate the proposed attachment. Under normal circumstances, the utility will respond to such properly executed and complete permit application for routine installations as promptly as is reasonable, with a goal of providing a response within ninety (90) days of receipt. a. A field survey will be required for each attachment requested to determine the adequacy of the pole to accommodate the proposed wireless communication facilities. The utility shall assess the wireless service provider the actual and documented costs of the survey(s). b. The utility's response will either: (1) Provide a description of make-ready identified by the utility and a cost estimate for the utility's portion of that make-ready; or (2) Provide a written explanation as to why the application is being denied, in whole or in part. c. If the utility does not meet the timeframe described in this subsection D.2. to complete the pre-construction survey, the wireless service provider may, at its option, hire a utility approved professional engineer or an approved wireless service provider employee or contractor to conduct the survey. Any such pre-construction survey shall by subject to review and approval by the utility. 3. Response to estimate. Upon receipt of the utility's response, a wireless service provider shall have sixty (60) days to approve the estimate of any proposed make-ready work and, if advance payment is required, provide payment in accordance with this chapter and the specifications of the estimate. E. Permit for installation in public right-of-way. Wireless service providers shall submit a properly executed permit application to the City which accurately describes the location, dimensions, and appearance of any wireless communication facilities or wireless support structures to be installed in the public right-of-way, along with other information required by this chapter. Designated City and utility employees may administratively approve applications to install attachments of wireless communication facilities to City poles and utility poles, respectively, and installation of wireless support structures upon payment of proper fees by the applicant, provided that the application fully complies with all requirements of this chapter and meets the design standards of Appendix B, attached to the ordinance from which this chapter derived. Noncompliant applications may only be approved by designated City and utility employees when fully compliant with City ordinances and aesthetic standards. The denial of a permit may be appealed in accordance with subsection 11.40.04.C. F. Permit as authorization to attach. Upon completion and inspection of any necessary make-ready work and receipt of payment for such work, the City and/or utility will sign and return the permit application, which shall serve as authorization for the wireless service provider to make its attachment(s). G. Notification to utility. Within thirty (30) days of completing the installation of an attachment, each wireless service provider shall provide written notice and as-builts, as required to the utility.

(Ord. No. O-18-80, § 1; Ord. No. O-19-85, § 1, 8-27-2019)

Ask a question about Conway law

Corpus searches the Conway sections it holds and shows the ones that match, with their citations. Free, no sign-in.