11.40.07 - Make-ready work/installation.

A. Estimate for make-ready work. As per Section 11.40.06, if the utility determines that it can accommodate a wireless service provider's request for attachment(s), it will advise the wireless service provider of any estimated make-ready work charges necessary to accommodate the attachment. B. Who may perform make-ready. Make-ready work shall be performed only by the utility and/or a qualified contractor authorized by the utility to perform such work. 1. Unless otherwise agreed by the utility, only the utility or its contractor will set any new or replacement poles or perform make-ready in the electric supply space. C. Time frame for completion of make-ready. If the utility, or its contractor, is performing make-ready work it will use good faith efforts to complete routine make-ready work within ninety (90) days of receipt of the wireless service provider's approval of the make-ready estimate (and advance payment if required). If there are extenuating circumstances that make the necessary make-ready work more complicated or time-consuming, including, but not limited to, the relative novelty of the type of wireless communication facilities and associated equipment to be attached, the total number of poles upon which the utility is currently obligated to perform make-ready work, or seasonal weather conditions, the utility shall identify those factors in the make-ready description and cost estimate and the parties shall agree upon a reasonable timeframe for completion. If the utility does not complete agreed upon make-ready work within ninety (90) days, or the agreedupon timeframe, it may allow the wireless service provider to use a utility approved qualified contractor to complete such make-ready work and refund any amounts paid by the wireless service provider to the utility for performing such make-ready work that is not completed. 1. The utility may delay the time period for completion of make-ready work by written notice in order to respond to severe storms, natural disasters, or other emergency situations. D. Scheduling of make-ready work. In performing all make-ready work to accommodate wireless service provider's attachments, the utility will endeavor to include such work in its normal work schedule. If a wireless service provider requests, and the utility agrees, to perform make-ready work on a priority basis or outside of the utility's normal work hours, the wireless service provider will pay any resulting increased actual and documented costs. Nothing in this chapter shall be construed to require the utility to perform a wireless service provider's work before other scheduled work or utility service restoration. E. Payment for make-ready work. Upon completion of the make-ready work performed by the utility, the utility shall invoice the wireless Service Provider for the utility's actual and documented cost of such make-ready work. The costs of the work shall be itemized in accordance with Section 11.40.03, and if the utility received advance payment, the costs shall be trued up in accordance with Section 11.40.03. Each wireless service provider shall be responsible for entering into an agreement with other existing attaching entities to reimburse them for any costs that they incur in rearranging or transferring their facilities to accommodate the wireless service provider's attachments. F. Notification of make ready work. Before starting make-ready work, the utility shall notify all existing attaching entities of the date and location of the scheduled work and notify them of the need to rearrange and/or transfer their facilities at the wireless service provider's cost within the specified time period. To the extent that the utility has the legal authority, it shall rearrange and/or transfer existing facilities of such other attaching entities that have not been moved in a timely manner. The wireless service provider shall pay for any such rearrangement or transfer. 1. In instances where a wireless service provider is performing make-ready, where an existing attaching entity has not relocated or otherwise undertaken work required to complete make-ready (such as repairing existing attachments not in compliance with applicable standards) within ninety (90) days of notice by the utility or the wireless service provider to such other attaching entity, the wireless service provider is authorized, to the extent that the utility has such authority, and the legal ability to delegate such authority, to relocate or repair the other attaching entity's attachments on behalf of the utility. The wireless service provider shall pay the costs to relocate the other attaching entity's attachments as part of the wireless service provider's make ready. G. Operator's installation/removal/maintenance work. 1. All of the wireless service provider's installation, removal, and maintenance work, by either the wireless service provider's employees or authorized contractors, shall be performed at the wireless service provider's sole cost and expense, in a good and workmanlike manner, and must not adversely affect the structural integrity of the utility's poles or other facilities or other attaching entity's facilities or equipment. All such work is subject to the insurance requirements of Section 11.40.25. 2. All of a wireless service provider's installation, removal, and maintenance work, either by its employees or authorized contractors, shall comply with all applicable regulations specified in subsection 11.40.04.A. Wireless service providers shall assure that any person installing, maintaining, or removing its wireless communication facilities is fully qualified and familiar with all applicable standards, and the design specifications established by the utility. 3. Notwithstanding anything to the contrary in this chapter, subsequent to the original installation of the wireless service provider's wireless communications facilities, the wireless service provider may modify or replace the wireless communications facilities without obtaining prior written consent of the City or utility so long as such modification or replacement does not: a. Modify the external appearance of the wireless communication facility; b. Increase the electric consumption of the wireless communication facility; c. Increase the load on the applicable pole beyond the loading, if any, that was established in the approved application; or d. Involve placement of equipment outside the area designated in the approved application. Licensee may request, and the City and/or utility shall timely provide, a determination as to whether a modification or replacement made subsequent to original installation deviates from the original permit sufficiently to require the issuance of a permit.

(Ord. No. O-18-80, § 1; Ord. No. O-19-85, § 1, 8-27-2019)