9.32.01 - General requirements.
The capacity of all storm sewers, drains and drainage ways shall be determined by using a rational approach giving due consideration to rainfall intensity, soil characteristics, proper runoff coefficients, slope, and the hydraulic properties of the pipes and conduits used. Interceptors should be placed at intervals not to exceed six hundred (600) linear ft., except under special conditions as approved by the city engineer. The designed rainfall intensity shall be based on four (4) inches per hour except in new subdivisions, where the rainfall intensity shall be based on a time of concentration of at least once in a ten-year expectancy as determined from local rainfall records. The minimum design velocity shall not be less than two and one-half (2½) ft. per thousand, and the maximum design velocity shall not exceed ten (10) ft. per second.
(Ord. No. A-584, Sec. 1)
Ask a question about Conway law
Corpus searches the Conway sections it holds and shows the ones that match, with their citations. Free, no sign-in.