§ 173.01 — General Provisions
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 173.01
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/64d3f3b2-edb3-42ef-bc62-66205446de86
173.01 - General Provisions
In addition to the specific provisions provided hereinafter, the following general provisions shall apply to the Building Code, Electric Code, Gas Code, Mechanical Code and the Plumbing Code. (A) Permits. (1) Fees Paid. A permit shall not be issued until the fees prescribed have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical, or gas systems has been paid. (2) Expiration. Every permit issued hereunder shall expire by limitation and become null and void if construction/installation authorized by permit is not commenced within six (6) months from the date of such permit, or if the construction/installation authorized by such permit is abandoned for a period of six (6) months at any time after the construction/installation is commenced. Before such installation can begin or be recommended, a permit extension fee shall be paid or a new permit shall be secured for the unfinished portion of the installation as required by the building official. (B) Liability Insurance. (1) The following shall be required to carry liability insurance. (a) Every licensed master electrician applying for an electrical permit; (b) Every licensed supervising gas filter actively engaged in gas installations; (c) Every licensed mechanical/HVACR licensee engaged in mechanical installations. (d) Every licensed master plumber actively engaged in plumbing installations. (2) Liability insurance shall be carried as set out below: • General aggregate $100,000.00 • Personal and advertising $100,000.00 • Each occurrence $100,000.00 Each certificate shall indicate name of insurance company issuing policy, name of insured, policy number, effective and expiration date, and signature of authorized representative of insurance company. (C) Responsibilities of Permit Applicant. (1) Notice to City. It shall be the duty of the permit applicant or his authorized representative to give notice to the city Building Safety Division when an installation is ready for an inspection. (2) Installation Ready for Inspection. It shall be the duty of the permit applicant to make sure that the installation is ready for inspection before the inspection is requested. (3) Provide Ready Access. It shall be the duty of the permit applicant to provide ready access to the premises where the requested inspection is to be made. (D) Exemptions. The assembly and erection of approved equipment by the manufacturer of such equipment, except electrical, gas, mechanical, and plumbing connections to said equipment, shall be exempt from permitting and inspection provisions. (E) Uncovering Work. Any installation or part thereof which is installed, altered, or repaired and covered before being inspected shall be uncovered for inspection as required by the Building Official. (F) Certificate of Occupancy. (1) Required. In addition to the building permit fee, buildings and parts of buildings shall not be occupied before a certificate of occupancy is executed and issued by the Building Official. (2) Copy upon Request. The owner of a single-family and multi-family residential dwelling will receive a copy of the certificate of occupancy if requested. (3) Temporary Certificate of Occupancy. A temporary certificate of occupancy may be executed and issued by the Building Official to allow buildings or parts of buildings to be occupied before completion of the entire scope of work. (a) Duration. Temporary Certificates of Occupancy are valid for a maximum of thirty (30) days. Temporary certificates must be renewed at expiration until the final Certificate of Occupancy is issued. (b) Request. A written request must be submitted by the building owner or permit applicant prior to issuance of a Temporary Certificate of Occupancy. (c) The Building Official shall have the discretion to issue a Temporary Certificate of Occupancy based upon the circumstances of hardship beyond the permit holder's control, the past performance of an applicant to successfully comply with the terms of Temporary Certificate of Occupancy issuance, or an applicant's failure to maintain a previously issued Temporary Certificate of Occupancy. In most circumstances, no new Temporary Certificate of Occupancy will be issued to a developer or builder (regardless if the builder or developer uses different corporate or LLC names) who has one (1) or more overdue Temporary Certificates of Occupancy or has otherwise not complied with previous commitments, requirements or terms of a previous Temporary Certificate of Occupancy until the entire backlog of Temporary Certificates of Occupancy with any problems has been remedied to the satisfaction of the Building Official.
(Ord. No. 4100, §2 (Ex. A), 6-16-98; Ord. No. 6206, §§1, 2, 7-16-19)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
