For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 51.078 — Wastewater Discharge Permit Issuance Process

Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 51.078

Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/84da2f59-22f6-49d6-8f7b-c9410ab9c1a5

51.078 - Wastewater Discharge Permit Issuance Process

(A) Wastewater Discharge Permit Duration. Wastewater discharge permits shall be issued for a specified time period, not to exceed five (5) years from the effective date of the permit. A wastewater discharge permit may be issued for a period less than five (5) years, at the discretion of the city. Each wastewater discharge permit will indicate a specific date upon which it will expire. (B) Wastewater Discharge Permit Contents. Wastewater discharge permits shall include such conditions as are deemed reasonably necessary by the City to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, protect the public, facilitate biosolids management and disposal, and protect against damage to the WRRF. (1) Wastewater discharge permits must contain: (a) A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years; (b) A statement that the wastewater discharge permit is nontransferable except in accordance with §51.078 (E). (c) Effluent limits, including best management practices, based on applicable pretreatment standards; (d) Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practices) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and (e) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (f) Requirements to control slug discharge, if determined by the city to be necessary. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions: (a) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (b) Requirements for the installation and maintenance of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (c) Requirements for the development and implementation of accidental discharge/slug control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges; (d) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the WRRF; (e) Requirements for installation and maintenance of inspection and sampling facilities and equipment; (f) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and (g) Other conditions as deemed appropriate by the city to ensure compliance with this article, and federal and state laws, rules, and regulations. (h) A licensed wastewater operator as deemed necessary on duty at all times of treatment and discharge of regulated wastewater discharge to the city's collection system (per §51.076(B)(5)). (C) Wastewater Discharge Permit Appeals. A permittee may petition the City to reconsider the terms of a wastewater discharge permit within thirty (30) days of notice of issuance of the discharge permit. (1) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal. (2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alterative condition, if any, it seeks to place in the wastewater discharge permit. (3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal. (4) If the city fails to act within thirty (30) days of receipt of the request, the request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit, shall be considered final administrative actions for purposes of judicial review. (D) Wastewater Discharge Permit Modification. The city may modify the wastewater discharge permit for good cause including, but not limited to, the following reasons: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) To address significant alterations or additions to the user's operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance; (3) A change in the WRRF that requires either a temporary or permanent reduction or elimination of the authorized discharge; (4) Information indicating the permitted discharge poses a threat to the WRRF, WRRF personnel, the receiving waters, or threats to the WRRF's beneficial biosolids use; (5) Violation of any terms or conditions of the wastewater discharge permit; (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting; (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13; (8) To correct typographical or other errors in the wastewater discharge permit; (9) To reflect a transfer of the facility ownership or operation to a new owner or operator where requested in accordance with 51.078(E). (E) Wastewater Discharge Permit Transfer. Wastewater discharge permits may be transferred to a new owner or operator if the permittee gives at least seven (7) days advance notice to the city, provides a copy of the existing permit to the new owner or operator, and the city approves the wastewater discharge permit transfer. The notice to the city must include a written certification by the new owner or operator which: (1) States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; (2) Identifies the specific date on which the transfer is to occur; and (3) Acknowledges full responsibility for complying with the existing wastewater discharge permit. Failure to provide notice of a transfer renders the wastewater discharge permit void as of the date of facility transfer. (F) Wastewater Discharge Permit Revocation. The city may revoke a wastewater discharge permit for good cause, including, but not limited to, the following reasons: (1) Failure to notify the city of significant changes to the wastewater prior to the changed discharge; (2) Failure to provide prior notification to the city of changed conditions pursuant to §51.079(E) of this article; (3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; (4) Falsifying self-monitoring or other reports; (5) Tampering with monitoring equipment; (6) Refusing to allow the city timely access to the facility premises and records; (7) Failure to meet effluent limitations; (8) Failure to pay fines; (9) Failure to pay sewer charges; (10) Failure to meet compliance schedules; (11) Failure to complete a wastewater survey or the wastewater discharge permit application; or (12) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article. Wastewater discharge permits shall be voidable upon cessation of operations. All wastewater discharge permits issued to a particular user are void upon the issuance of a new wastewater discharge permit to that user. (G) Wastewater Discharge Permit Re-Issuance. A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit re-issuance by submitting a complete permit application, in accordance with §51.077(E) of this article, a minimum of ninety (90) days prior to the expiration of the user's existing wastewater discharge permit. (H) Regulation of Waste Received from Other Jurisdictions. (1) If another jurisdiction, or user located within another jurisdiction, contributes wastewater to the WRRF, the city shall enter into an interjurisdictional agreement with the contributing jurisdiction; enter into an agreement with, or permit, users located in another jurisdiction; or both. Certain hauled wastewater may be exempted from the requirements of this paragraph with specific authorization by the city. (2) An interjurisdictional agreement, as required by paragraph (1), above, shall contain the following conditions: (a) A requirement for the contributing jurisdiction to adopt a sewer use ordinance which is at least as stringent as this article and local limits which are at least as stringent as those set out in §51.075(D) of this article. The requirement shall specify that such ordinance and limits must be revised as necessary to reflect changes made to the city's ordinance and/or local limits; (b) A requirement for the contributing jurisdiction to submit a revised user inventory on at least an annual basis; (c) A provision specifying which pretreatment implementation activities, including wastewater discharge permit issuance, inspection and sampling, and enforcement, will be conducted by the contributing jurisdiction; which of these activities will be conducted by the city; and which of these activities will be conducted jointly by the contributing jurisdiction and the city; (d) A requirement for the contributing jurisdiction to provide the City with access to all information the contributing jurisdiction obtains as part of its pretreatment activities; (e) A provision insuring the city access to the facilities of users located within the contributing jurisdiction's boundaries for the purpose of inspection, sampling, and any other duties deemed necessary by the city; and (f) A provision specifying remedies available for breach of the terms of the interjurisdictional agreement.

(Ord. No. 3965, §§2, 3 (Exh. A), 5-7-96; Ord. No. 4088, §§4, 5, 4-7-98; Code 1991, §51.078; Ord. No. 5739, 2-17-15)

Ask a question about Fayetteville law

Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.