§ 51.079 — Reporting Requirements
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 51.079
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/20241643-c2e2-4874-9ace-e612d50bdfe1
51.079 - Reporting Requirements
(A) Baseline Monitoring Reports. (1) Within either one hundred eighty (180) days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the WRRF shall submit to the city a report which contains the information listed in paragraph (B), below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the city a report which contains the information listed in paragraph (2), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (2) Users described above shall submit the information set forth below. (a) Identifying Information. The name and address of the facility, including the name of the operator and owner. (b) Environmental Permits. A list of any environmental control permits held by or for the facility. (c) Description of Operations. A comprehensive narrative description of the nature, average rate of production, all applicable NAICS and standard industrial classifications of the operation(s) carried out by such user. This description should include a comprehensive schematic process diagram which indicates points of discharge to the WRRF from the regulated processes. A qualified professional must certify to the accuracy of this process narrative and wastewater flow schematics. (d) Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the WRRF from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). The city may allow for verifiable estimates of these flows where justified by cost or feasibility considerations. (e) Measurement of Pollutants. (i) The categorical pretreatment standards applicable to each regulated process. (ii) The results of sampling and analysis identifying the nature and concentration (and/or mass, where required by the standard or by the city) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long term average concentrations or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in §51.079(J) of this article. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the city or the applicable standards to determine compliance with the standard. (iii) Sampling must be performed in accordance with procedures set out in §51.079(K) of this article. (f) Certification. A statement, reviewed by the user's authorized signatory and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment, is required to meet the pretreatment standards and requirements. (g) Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in §51.079(B) of this article. (h) Signature and Certification. All baseline monitoring reports must be signed and certified in accordance with §51.077(F) of this article. (B) Compliance Schedule Progress Report. The following conditions shall apply to the compliance schedule required by §51.079(A)(2)(g) of this article: (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, beginning and conducting routine operation); (2) No increment referred to above shall exceed nine (9) months; (3) The user shall submit a progress report to the city not later than fourteen (14) days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and (4) In no event shall more than nine (9) months elapse between such progress reports to the city. (C) Report on Compliance with Categorical Pretreatment Standard Deadline. Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the WRRF, any user subject to such pretreatment standards and requirements shall submit to the city a report containing the information described in §51.079(A)(2)(d) through (f) of this article. For users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with §51.077(F) of this article. (D) Periodic Compliance Reports. (1) All significant industrial users shall, at a frequency determined by the city but in no case less than every six (6) months, submit a report indicating the nature and concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows for the reporting period. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the city or the pretreatment standard necessary to determine the compliance status of the user. All periodic compliance reports must be signed and certified in accordance with §51.077(F) of this article. (2) All wastewater samples must be representative of the user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of a user to keep its monitoring facility in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. (3) If a user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the city, using the procedures prescribed in §51.079(J) and §51.079(K) of this article, the results of this monitoring shall be included in the report. (E) Report of Changed Conditions. Each user must notify the city of any planned significant changes to the user's operations or system which might alter the nature, quality or volume of its wastewater at least thirty (30) days before the change. (1) The city may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under §51.077(E) of this article. (2) The city may issue a wastewater discharge permit under §51.077(G) of this article or modify an existing wastewater discharge permit under §51.078(D) of this article in response to changed conditions or anticipated changed conditions. (3) For purposes of this requirement, significant changes include, but are not limited to, flow changes of 20% or greater, and the discharge of any previously unreported pollutants. (F) Reports of Potential Problems. (1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load, that may cause potential problems for the WRRF (including a violation of the prohibited discharge standards in §51.075(B) of this article), the user shall immediately telephone and notify the city of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (2) Within five (5) business days following such discharge, the user shall, unless waived by the city, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the WRRF, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, civil penalties, or other liability which may be imposed pursuant to this article. (3) If required by the city, a notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in paragraph (A), above. Employers shall ensure that all employees are advised of the emergency notification procedure. (4) Significant industrial users are required to notify the city immediately of any changes at its facility affecting the potential for a slug discharge. (G) Reports from Unpermitted Users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports as may be required by the city. (H) Notification of Violation/Repeat Sampling and Reporting. (1) If sampling performed by a user indicates a violation, the user must notify the city as soon as possible but no later than twenty-four (24) hours after becoming aware of the violation. The user shall also immediately repeat the sampling and analysis and submit the results of the repeat analysis to the city within the time period specified by the city but at no time later than thirty (30) days after becoming aware of the violation. The user may not be required to resample if the city samples between the user's initial sampling and when the user receives the results of this sampling. (2) If the city performed the sampling and analysis in lieu of the industrial user, the city will perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat sampling and analysis. (I) Notification of the Discharge of Hazardous Waste. (1) Any person who commences the discharge of hazardous waste shall notify the City, the EPA Regional Waste Management Division Director, and state hazardous waste authorities (in writing) of any discharge into the WRRF of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the WRRF, the notification shall also contain the following information to the extent such information is known and readily available to the user: An identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following twelve (12) months. All notifications to the city must be made prior to the commencement of the discharge. Notifications of changed conditions must be submitted under section §51.079(E) of this ordinance. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under the self-monitoring requirements of sections §51.079(A), (C), and (D) of this ordinance. (2) In the case of any new regulations under §3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the city, the EPA Regional Waste Management Waste Division Director, and state hazardous waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. (3) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (4) This reporting provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued thereunder, or any applicable federal or state law. (J) Certification of Permit Applications and User Reports. The following certification statement is required to be signed and submitted by users submitting permit applications in accordance with section §51.077; users submitting baseline monitoring reports under section §51.079(A); users submitting reports on compliance with the categorical pretreatment standard deadlines under section §51.079(C); users submitting periodic compliance reports required by section §51.079(D) (1)—(3). The following certification statement must be signed by an authorized representative as defined in section §51.074: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. (K) Analytical Requirements. (1) All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by the EPA. (2) All independent laboratories performing analyses for users, including, but not limited to, self-monitoring, periodic reports on continuing compliance, baseline monitoring reports and/or split sample verification, shall be certified by the ADEQ Laboratory Certification Program for the specific analysis being performed. The city reserves the right to reject any analysis performed by an independent laboratory that is not duly certified for a particular analysis. (L) Sample Collection. (1) Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. (2) Except as indicated in subsection three (3) and four (4), below, the user must collect wastewater samples using twenty-four (24) hour flow-proportional composite collection techniques. In the event flow proportional sampling is infeasible, the city may authorize the use of time proportional sampling or a minimum of four (4) grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. (3) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic chemicals must be obtained using grab collection techniques. (4) For sampling required in support of baseline monitoring and ninety (90) day compliance reports required in §§51.079(A) and (C), a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the City may authorize a lower minimum. For the reports required by §51.079(D), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. (M) Date of Receipt of Reports. Written reports will be deemed to have been submitted on the date post-marked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (N) Record Keeping. Users subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this article and any additional records of information obtained pursuant to monitoring activities undertaken by the user independent of such requirements, and documentation associated with best management practices established under 51.075(D). Records shall include the date, exact place, method, and time of sampling and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user or the City, or where the user has been specifically notified of a longer retention period by the U.S. EPA, state, or city.
(Code 1991, §51.079; Ord. No. 3965, §§2, 3 (Exh. A), 5-7-96; Ord. No. 4088, §6, 4-7-98; Ord. No. 5739, 2-17-15)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
