Sec. 112-105. - Stormwater pollution prevention plan (SWPPP).

(a) Preparation. (1) The SWPPP shall be prepared in accordance with the provisions set forth in these regulations. All SWPPPs shall be prepared and sealed by the engineer of record for the project except those for: a. One new or existing single-family structure that is part of a larger common development; b. One new or existing duplex family structure that is part of a larger common development; or c. One existing commercial or industrial structure where additional structural or site improvements are less than 2000 square feet and that is part of a larger common development. (2) SWPPPs for the exempt sites in subsections (a)(1)a through c in this section can be prepared by the developer, provided that the developer is knowledgeable with the applicable local, state, and federal requirements for SWPPP preparation. (b) Submission. The developer shall submit two signed copies of the SWPPP to the city planning office along with the review fee as established by the city council. Upon receipt, the planning office will forward the submittals to the city engineer for review. (c) Plan review. (1) The city engineer or his designated representative shall review the submittals for conformance to the city minimum design standards as established herein. (2) The city engineer will review and comment or approve the project submittals within 15 business days upon receipt. Failure of the city engineer to meet this timeline shall not be considered approval of the proposed work. (d) Rejection. (1) If it is determined that the proposed development will not control stormwater runoff in accordance with these regulations, a comment letter listing the deficiencies shall be issued to the developer for response. Re-submittals shall be made to the city planning office. (2) If needed, an informal meeting between the developer and the city engineer or his designee may be scheduled by either party to review the overall concepts included in the plan. The purpose of this meeting may vary, but generally shall be to jointly agree upon an overall stormwater management concept for the proposed development and to review criteria and design parameters which shall apply to the project. (e) Acceptance. If it is determined that the proposed development will control stormwater runoff in accordance with these regulations, a grading permit shall be issued to the developer.

(Ord. No. 08:099, § 2(3.3), 12-18-2008)