Sec. 30-175. - Catch basins, drop inlets, and junction boxes.

(a) Concrete floors for catch basins, drop inlets, and junction boxes shall be poured at least twenty-four (24) hours prior to beginning construction on the walls. Floors shall be constructed to the full outside dimensions indicated in the plans. Walls shall be so constructed as to form a tight joint with the floor and around all inlet and the outlet pipes. Walls may be constructed of plain concrete or reinforced concrete meeting requirements outlined in section 30-102, or brick masonry, as required by the owner's engineer. Forms for concrete walls shall be smooth on the inside face and shall be securely staked to conform with the lines and grades established by the owner's engineer. (b) They shall be set in such a way to prevent springing when concrete is placed against them. All forms shall be cleaned and oiled before concrete is placed against them. No concrete shall be poured until the owner's engineer has inspected the forms, the placing of reinforcing steel and castings, and has given his approval to proceed with the work. All castings shall be set accurately to the finished elevations. They shall be set in full mortar belts with firm bearing on the walls or securely fastened to the forms so that no movement will occur when concrete is poured around them. (c) In construction of brick masonry walls, the brick shall be thoroughly wetted immediately before being laid, and they shall be laid in full courses in full and close mortar joints. At least one (1) course in every seven (7) courses shall be composed of headers. No spalls or bats shall be used except for shaping around irregular openings. All joints shall be completely filled with mortar. Portland cement mortar shall be proportioned one (1) part of cement to two (2) parts of sand. Retempering of mortar will not be permitted.

(Code 1961, § 36-16(B)(3))