Sec. 94-121. - Definitions.
Street cut means an excavation in city right-of-way within or out of the pavement area. (Sometimes called a utility cut.) Street cut repair means the repair to the location of the disturbed right-of-way caused by a street cut. Street cut barricade means the barricade plan used during the time a street cut is being made and while the utility repair or work is being made. Street cut repair barricade means the barricade plan in use after the completion of the utility repair work but prior to the final repair to the street. Temporary street cut repair means that repair in place between the time the street cut is completed but prior to the completion of the final repair. If in the pavement area, this repair consists of a cap of cold mix asphalt flush with the existing pavement surface. Permanent street cut repair means the completed street cut repair and marked with the appropriate utility color if the cut is in the pavement area.
(Ord. No. 7449, § 4, 5-13-02)
Ask a question about North Little Rock law
Corpus searches the North Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.