For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 94-122 — Prior approval

Municipal Code of the City of North Little Rock, Arkansas (Codified through Ord. No. 7866, enacted Oct. 9, 2006. (Supplement No. 20)) · North Little Rock Municipal Code § 94-122

Corpus is an independent public-information project, not the official City of North Little Rock website. Stable reference: corpuslaw.us/code/7e3dbf96-c422-46e4-8164-aad0e6d7f179

Sec. 94-122. - Prior approval.

The public works director shall approve prior to the start of any street cut, the type, design, manner of cut repair, barricading of the cut and cut repair and shall also require the following, but not limited to the following: (1) At least one two-sided sign that bears the name of the utility company responsible for the cut shall be kept at each cut location. This shall apply for not only maintenance cuts that require permits, but also any other cuts related to relocations, new installations, etc. of the utility company. The sign shall also bear the telephone number of the party within the utility company that shall be responsible for managing the maintenance and making of the cut. The sign shall also be legible for at least 100 feet and shall be at least three feet by three feet in size. The sign shall be placed in a conspicuous spot that is easily visible from either direction of traffic. The sign or signs shall be posted at the time a cut is made and shall remain in place until the permanent cut repair is complete. During the time that the sign or signs are required to be in place, it shall be the responsibility of the utility company to maintain the sign. It will be acceptable to allow the signs on the rolling equipment of the utility company to serve as temporary signage while they are at the cut site, however, they must be legible at 100 feet, have the required utility telephone number, and be replaced by proper signage when the rolling equipment is not at the site. This signage is required for all cuts, whether they are in the pavement or behind the curb, as long as the cut is in the city right-of-way or city easement. (2) Contact persons and phone numbers shall be a part of any permit request. As many as three names (or titles) and numbers can be listed and at least one of them shall be reachable during normal working hours. If one of these persons (or titles) cannot be reached at one of these numbers, then the permit will be in violation. (3) After a cut repair is completed, the cut repair (if in the pavement) shall be marked with a six-inch diameter circular templated spot the color designated for that utility by Arkansas One Call. (4) The city wastewater and electric department are exempt from permit charges in the article as long as they notify the public works department of a cut within one day after the cut is made and again within one day after the cut repair is complete. If not, then they will be required to pay the fee structure listed in the article. (5) If in the pavement area, a temporary street cut repair shall be maintained by the permitted utility owner and if it fails shall be in violation of this article. (6) This article does not apply to a utility company relocation, or new facility work but only to routine maintenance of existing facilities. The distinction between "routine" and relocation or new facility is if the plans are required to be signed by a professional engineer. Work not requiring a professional engineer's stamp will be considered to be routine. (7) Any utility company doing work in the city will be required to attend a meeting once a month at the direction of the director of public works building. (8) The drilling of holes for the purpose of installing utility poles will not be covered in the article as long as clean up and completion of work is carried out in a timely manner. If not, then the regulation and fee structure of the article will apply. (9) If a directional boring machine is used to make the utility repair, then no fee shall be charged except if the excavation becomes in violation of this article in which case, all fees shall become applicable. (10) The utility shall warranty their street right-of-way repair for one year after completion. If during that time the cut repair fails, the utility at the request of the city shall correct the repair within one working day or shall be in violation of this article.

(Ord. No. 7449, § 3, 5-13-02; Ord. No. 7456, § 1, 5-28-02; Ord. No. 7520, § 1, 3-1-03)

Ask a question about North Little Rock law

Corpus searches the North Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.