For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.34.080 — Height overlay zones within height overlay district

Municipal Code of the City of Bullhead City, Arizona (Codified through Ordinance No. 2026-14, enacted August 17, 2026. (Supp. No. 75)) · Bullhead City Municipal Code § 17.34.080

Corpus is an independent public-information project, not the official City of Bullhead City website. Stable reference: corpuslaw.us/code/9129e980-8d59-4879-8523-7b1ce33d2f7f

17.34.080 - Height overlay zones within height overlay district.

A. The construction or establishment of any building structure or use shall comply with the height limits as determined by the zoning district identified by the official zoning map of the city of Bullhead City, or with the height limits specified in this chapter and also identified on the airport runway approach clearance map, "Part 77 Airspace Plan," Map 2*, whichever places the greater restriction and as adopted as part and parcel to this chapter and any amendments thereto. B. For purposes of administering these height regulations, there shall be nine height overlay zones, as identified below, within the airport height overlay district for the Laughlin/Bullhead International Airport. 1. "Utility runway visual approach zone" means the inner edge of this approach zone coincides with the width of the primary surface and is two hundred fifty feet wide at the end of the primary surface. The approach zone expands outward uniformly to a width of one thousand two hundred fifty feet at a horizontal distance of five thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 2. Utility Runway Nonprecision Instrument Zone. The inner edge of this approach zone coincides with the width of the primary surface and is five hundred feet wide. The approach zone expands outward uniformly to a width of two thousand feet at a horizontal distance five thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 3. Runway Larger than Utility Visual Approach Zone. The inner edge of this approach zone coincides with the width of the primary surface and is five hundred feet wide. The approach zone expands outward uniformly to a width of one thousand five hundred feet at a horizontal distance of five thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 4. Runway Larger than Utility with a Visibility Minimum Greater than Three-Fourths Mile Nonprecision Instrument Approach Zone. The inner edge of this approach zone coincides with the width of the primary surface and is five hundred feet wide. The approach zone expands outward uniformly to a width of three thousand five hundred feet at a horizontal distance of ten thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 5. Runway Larger than Utility with a Visibility Minimum as Low as Three-Fourths Mile Nonprecision Instrument Approach Zone. The inner edge of this approach zone coincides with the width of the primary surface and is one thousand feet wide. The approach zone expands outward uniformly to a width of four thousand feet at a horizontal distance of ten thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 6. Precision Instrument Runway Approach Zone. The inner edge of this approach zone coincides with the width of the primary surface and is one thousand feet wide. The approach zone expands outward uniformly to a width of sixteen thousand feet at a horizontal distance of fifty thousand feet from the primary surface. Its centerline is the continuation of the centerline of the runway. 7. Transitional Zone. The transitional zones are the areas beneath the transitional surfaces. 8. Horizontal Zone. The horizontal zone is established by swinging arcs of five thousand feet radii for all runways designated utility or visual and ten thousand feet for all others from the center of each end of the primary surface of each runway and connecting the adjacent arcs by drawing lines tangent to those arcs. The horizontal zones does not include the approach and transitional zones. 9. Conical Zone. The conical zone is established as the area that commences at the periphery of the horizontal zone and extends outward therefrom a horizontal distance of four thousand feet. B. The development services director shall determine whether the construction and/or existence of any structure, pole, tower, tank or plant material constitutes a hazard to an aircraft operation in the vicinity of the airport. C. When such a determination is made, the owner of the structure, pole, tower, tank or plant material shall, at his own expense, reduce in height or install, operate and maintain such markers and lights as may be necessary to indicate to aircraft operators the presence of an airport hazard. D. Any activity within this district which may create an electrical interference with communications between the airport facility and aircraft is prohibited.

(Res. No. 2010R-12, § 16, 2-16-2010; Ord. No. 2010-2, § 1, 2-16-2010; Ord. 2006-16 §§ 1 (part), 5; Ord. 97-905 § 1 (part); Ord. 91-499 § 2 (part), 1991)

Ask a question about Bullhead City law

Corpus searches the Bullhead City sections it holds and shows the ones that match, with their citations. Free, no sign-in.