§ 58-319 — Industrial user pretreatment requirements
Municipal Code of Surprise, Arizona (Supp. No. 68: codified through Ordinance No. 2026-07, adopted January 20, 2026) · Surprise Municipal Code § 58-319
Corpus is an independent public-information project, not the official City of Surprise website. Stable reference: corpuslaw.us/code/ed64ac6d-ccd5-4640-b1d0-607394062987
Sec. 58-319. - Industrial user pretreatment requirements.
All industrial users shall: (1) Comply with the categorical standards, pretreatment requirements, and all other requirements imposed by this article. (2) Comply with any administrative orders of the city designed to implement the categorical standards, pretreatment requirements and all other requirements imposed by this article. (3) Within 90 days prior to discharging to the POTW, any new industrial user shall submit a written notice to the city which identifies the: a. Name and address of the industrial user. b. Business location. c. North America Industrial Classification System Code d. Nature, concentration, and amount of any pollutant present at or intended to be present at, the business location, which if discharged to the POTW would constitute an-industrial discharge. e. Nature and concentration of all pollutants currently discharged to the POTW. (4) Notify the city immediately by telephone of any accident, negligent act, slug discharge, or other accidental occurrence that results in a discharge that exceeds the effluent limitations established by the city or may cause any damage to the POTW. Any user causing such a discharge shall initiate all appropriate corrective actions required by the city. This verbal notification shall be followed within five days of the date of occurrence by a detailed written statement. Such notification will not relieve the industrial user of liability for any expense, loss or damage to the POTW, or for any fines imposed on the city because of or for any enforcement action pursuant to this occurrence. Such written statement shall also describe the following: a. Location of discharge. b. Known or estimated nature, concentration and volume of the discharge. c. Type of assistance desired from the city. d. The causes of the accidental discharge, the corrective measures being taken to prevent a future occurrence, and the time required to implement the corrective measures. (5) Carry out self-inspection and self-monitoring activities necessary for the industrial user to know at all times whether or not such user is in compliance with this article. (6) Maintain records of self-monitoring and self-inspection activities. (7) Assist the city in determining the exact nature, concentration, and volume of any pollutant intended for discharge. Upon request by the city, any industrial user shall promptly: a. Allow the examination and copying of all relevant records or documents available to the industrial user. b. Allow the inspection of all business locations served by the POTW, including all pretreatment equipment, methods and activities utilized by the industrial user at such location. c. Allow the collection of samples from any discharge or intended discharge. d. Provide the city with any other information, including, but not limited to, chemical analyses of wastewater, architectural or engineering design data, drawings, etc., which are reasonably needed by the city for the purpose of determining compliance with this article. (8) Immediately halt any actual or threatened discharge to the POTW when the city has reason to believe that such actual or threatened discharge: a. Presents or may present an imminent or substantial endangerment to the health or welfare of any person or to the environment or to the POTW; or b. Will cause interference with POTW operations. (9) Be financially responsible for all injury, damage, or loss suffered to any person as a result of any discharge, by such user. In particular, each user shall be liable for: a. Personal injury suffered by any person as a result of such discharge; b. Costs reasonably incurred by any person in correcting, or otherwise mitigating, any adverse environmental impact which resulted from such discharge; and c. Economic loss and property damage suffered by any person as a result of such discharge. (10) Reimburse the city for all expenses reasonably incurred by the city in ensuring compliance with this article. (11) Notify the city by phone within 24 hours of any self-monitoring lab results that indicate a violation of this article and resample within 24 hours at the same sample location of the violation. Submit results of the resample to the city within 24 hours and continue to resample if violation persists. Written copies of all results which indicate a violation must be submitted to the city within 30 days of sampling. The city may require additional sampling as needed. All samples must be analyzed according to approved laboratory procedures, as established in current Federal Regulations. (12) Ensure that all applications, correspondence, reports, and self-monitoring reports are signed by an appropriate signatory or authorized representative. Any change in signatures or positions that impact the pretreatment program shall be submitted to the city in writing within 30 days after the change. (13) Notify the city not less than 90 days prior to increasing their discharge, expanding their facility or making any new discharges that would change the nature of their discharge. (14) Notify the city, in writing of any discharge into the POTW of a substance, which, if otherwise disposed of, would be a hazardous waste. Such notification must include the name of the hazardous waste, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other) and be in accordance with current federal regulations. The report shall contain information as required by the Arizona Administrative Code. a. If the industrial user discharges more than 100 kilograms of such hazardous waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the industrial user: 1. An identification of the hazardous constituents contained in the discharge; 2. An estimation of the mass and concentration of such constituents expected to be discharged during the following 12 months. [b. Reserved.] c. Industrial users shall provide the notification no later than 180 days after the discharge of the listed or characteristic waste. d. Any notification made under this subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges must be submitted under federal law. e. The notification requirement in this subsection does not apply to pollutants already reported under the self-monitoring requirements of federal law. f. Dischargers are exempt from this requirement during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in federal law. g. Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in federal law, requires a one-time notification. Subsequent months where the industrial user discharges more than these quantities of any hazardous waste do not require additional notification. h. In the case of any notification made under this subsection, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practicable and that it has selected the month of treatment, storage, or disposal currently available which minimizes the present and future threat to human health and the environment.
(Ord. No. 2012-06, § 1, 5-8-2012)
Ask a question about Surprise law
Corpus searches the Surprise sections it holds and shows the ones that match, with their citations. Free, no sign-in.
