Sec. 58-492. - Construction site stormwater runoff control requirements.

(a) All persons engaged in significant construction activities within the city who are required by federal or state law to submit to the EPA and/or the ADEQ an NOI in order to comply with a NPDES or AZPDES construction general permit, shall provide to the city copies of any authorization certificate or permit issued by such entities. Additionally, all persons shall submit a copy of any notices of termination received from such entities. (b) All persons engaged in significant construction activities within the city shall provide to the city for its review and approval a copy of all SWPPP's for the area of disturbance and any applicable off-site areas proposed to be disturbed. Such plans will be reviewed and approved by the city prior to the issuance of any permit associated with any grading, demolition, construction, grubbing, or other activity that may disturb the existing soil and/or drainage. (c) If the city determines that pollutants may enter the public stormwater system from construction activities at a site less than one-acre in size, the city shall require site-specific BMPs be submitted by the owner or assigned party through a SWPPP which the city will review prior to issuance of a construction permit. The permittee shall implement the SWPPP during construction activity. (d) Any person operating under a construction stormwater permit issued by the EPA or ADEQ shall not cause or contribute to any condition that may result in a violation of any stormwater permit issued by the city. Such person shall undertake any and all BMPs necessary to: minimize to the MEP the potential of any pollutant being discharged from the construction site; provide protection from accidental discharge of pollutants to the public stormwater system; ensure sufficient erosion and sediment controls are in place and adequately maintained; ensure construction materials are handled and stored in a manner such as to reduce to the MEP the discharge of pollutants associated with such materials; and control and properly dispose of any waste that may cause adverse impacts to water quality (i.e. discarded building materials, concrete truck washout, chemicals, litter, sanitary waste, etc.). (e) If any additional BMP is required or ordered by the city engineer or during any stages of construction, and is so ordered to prevent a pollutant from entering the public stormwater system, that person receiving the notice of such requirement may petition the director of water resource management, or their designee, to reconsider the application of such BMP to the premises or activity. The city must receive the written petition within 14 calendar days following such requirement or order, and the written petition must set forth any reasons for not selecting and implementing such BMP, and must propose alternatives. The director of water resource management, or their designee, will make a determination within 30 calendar days of receipt of the petition. An appeal of this decision must be delivered to the city manager within five business days to review and render a final decision. The city manager shall have the authority to permit exceptions to the requirements in this section in any case that they find an exception is necessary to maintain adequate health and sanitation standards.

(Ord. No. 2026-04, § 1(Exh. A), 1-20-26)