Sec. 58-494. - Post-construction stormwater runoff requirements.
(a) Property owners or management companies shall ensure proper operation and maintenance of all post-construction stormwater facilities within their property boundaries. This includes, but is not limited to, retention basins, drywells, underground retention systems, scuppers, handrails, outfalls, pipes not in the right-of-way, and other measures implemented or installed at the site to control or direct stormwater runoff. Changes or alterations to stormwater features represented on the as-built plans shall be reviewed and approved by the city prior to implementation. The proposed alteration shall follow the guidance provided in the city's engineering development standards (EDS). (b) The property owner and/or management company shall be responsible for annual inspection and maintenance of all stormwater post-construction facilities on the property. The property owner and/or management company shall complete and retain an inspection form/log along with copies of any associated supporting documentation. These documents will be retained on site for review by city staff upon request. (c) City staff will conduct inspections of both public and private post-construction stormwater features throughout the city. If maintenance or other concerns are identified, the city will contact the property owner and/or management company and provide a list of deficiencies to be addressed. (d) If any additional BMP is required or ordered by city staff to prevent a pollutant from entering the public stormwater system, the person receiving the notice of such requirements may petition the director of water resource management, or their designee, to reconsider the implementation of such BMP to the premises. The petition must be received by the city in writing within 14 calendar days of such requirement or order, and it must set forth any reasons for not selecting and implementing such BMP, and must propose alternatives. The director of water resource management, or their designee, will make a determination within 30 calendar days of receipt of the petition. An appeal of this decision must be delivered to the city within five business days to the city manager, or their designee, to review and render a final decision. The city manager shall have the authority to permit exceptions to the requirements in this section in any case that they find an exception is necessary to maintain adequate health and sanitation standards.
(Ord. No. 2026-04, § 1(Exh. A), 1-20-26)