§ 7.7.03: Major street development requirements.

Every owner/developer and every project receiving a development entitlement shall be required, as a condition thereof, to pay the appropriate major street fees, to construct major street improvements, to relocate existing facilities, and to perform other related matters as follows: (a) Adjacent improvements. (1) Frontage improvements. Every owner/developer and/or every project involving every parcel frontage on a major street is required to construct full improvements and provide for City acquisition of the required right-of-way adjacent to the parcel. Credit for actual cost incurred for the portion of the right-of-way within ten feet (10') of the face of curb and the frontage improvements (excluding landscaping) shall be granted against the outside travel lane fee, to the extent the actual costs do not exceed the outside travel lane fee. The developer shall be entitled to reimbursement from the relevant outside travel lane fund for the remaining balance of such costs as provided in this chapter. (2) Outside travel lane improvements. The owner/developer and/or project is required to construct the outside travel lane improvements and provide for City acquisition of the required right-of-way and shall pay an “outside travel lane fee” calculated as described in Section 7.7.07. Credit for actual cost incurred for right-of-way and improvements shall be granted against the outside travel lane fee, to the extent the actual costs do not exceed the outside travel lane fee. The developer shall be entitled to reimbursement from the relevant outside travel lane fund for the remaining balance of such costs as provided in this chapter. (3) Center travel lane improvements. For all developments within all service areas, excluding Service Area 3, the owner/developer is required to construct the center travel lane improvements, provide for City acquisition of the required right-of-way and shall pay a “center travel lane fee” calculated as described in Section 7.7.07. Credit for actual cost incurred for right-of-way and improvements shall be granted against the center travel lane fee to the extent the actual costs do not exceed the center travel lane fee. The developer shall be entitled to reimbursement from the relevant center travel lane fund for the remaining balance of such costs as provided in this chapter. For all developments within Service Area 3, the owner/developer is not required to construct center travel lane improvements unless the planned major street does not exist, in which case the owner/developer shall construct the center travel lane (one) adjacent to outside travel lane as described in subsection (a)(2) of this section. The developer shall enter into a reimbursable agreement with the City for improvement and right-of-way provided, at the discretion of the City Council. (4) Bridge improvements. For all developments within all service areas, the owner/developer may be required to construct the bridge improvements and shall pay a “bridge fee” calculated as described in Section 7.7.07. Credit for actual cost incurred for improvements to construct the bridge improvements shall be granted against the bridge fee to the extent the actual costs do not exceed the bridge fee. The developer shall be entitled to reimbursement from the relevant bridge fund for the remaining balance of such costs as provided in this chapter. (5) Traffic signal improvements. For all developments within all service areas, the owner/developer may be required to construct the traffic signal improvements and shall pay a “traffic signal fee” calculated as described in Section 7.7.07. Credit for actual cost incurred for improvements to construct the traffic signal improvements shall be granted against the traffic signal fee to the extent the actual costs do not exceed the traffic signal fee. The developer shall be entitled to reimbursement from the relevant traffic signal fund for the remaining balance of such costs as provided in this chapter. (b) Nonadjacent improvements. (1) Nonadjacent center travel lanes. The owner/developer and/or project shall be required to provide right-of-way acquisition and full improvement of the nonadjacent center travel lane(s) to the nearest improved major cross street serving said development, as planned and determined by the City Engineer, in which case, the owner/developer and/or project shall be eligible for reimbursement for actual costs of same as provided in this chapter. For all developments within Service Area 3, the right-of-way acquisition and construction of the nonadjacent center travel lanes beyond the owner/developer’s property shall not be required, unless for traffic safety reasons, as determined by the City Engineer, in which case the owner/developer shall be required to provide right-of-way acquisition and full improvement of the nonadjacent center travel lane(s) as determined by the City Engineer for traffic safety reasons. The developer may enter into a reimbursable agreement with the City for improvements and right-of-way provided, at the discretion of the City Council. (2) Nonadjacent outside travel lane(s). The owner/developer and/or project may be required to provide right-of-way acquisition and full improvement of the nonadjacent outside travel lane(s) where the City Engineer determines by traffic analysis that projected traffic generated by the project causes the major street to reach a point at which traffic demand will exceed sixty percent (60%) of planned capacity; in which case, the owner/developer and/or project shall be eligible for reimbursement for actual costs of same as provided in this chapter. (3) Nonadjacent bridges. The owner/developer and/or project shall be required to construct nonadjacent bridge improvements as needed to accommodate the construction of the required nonadjacent center travel lane(s) and/or the required nonadjacent outside travel lane(s). (4) Nonadjacent traffic signals. The owner/developer and/or project may be required to construct non-adjacent traffic signal improvements as needed to accommodate the construction of the required non-adjacent center travel lane(s) and/or the required nonadjacent outside travel lane(s). (c) Special facility improvements. The owner/developer and/or project may be required to contribute a proportionate share in the cost of constructing “special facilities” as described in Sections 7.7.02 and 7.7.07 and/or may be required to provide for City acquisition of the required right-of-way and construction of special facilities; in which case, credit against the special facilities contribution shall be given for the actual costs of such right-of-way acquisition and construction. To the extent such costs exceed such contribution, the owner/developer and/or project shall be entitled to reimbursement from the relevant special facility contributions for the remaining balance of such costs as provided in this chapter. (d) Right-of-way dedication. The owner/developer and/or project shall dedicate all right-of-way as required for local streets and easements inside project boundaries. Such owner/developer and/or project is to be eligible for reimbursement for actual purchase costs from the appropriate street fee funds. (e) Right-of-way acquisition. The owner/developer and/or project shall advance the funds necessary to acquire all right-of-way for required nonadjacent improvements and/or special facility improvements and/or relocation of existing facilities to their ultimate location. Such acquisition to be by purchase or by City initiated eminent domain, if required, in accordance with the City’s procedures. Such owner/developer and/or project is to be eligible for reimbursement for actual costs of the acquisition from the appropriate street fee funds. (f) Relocation of existing facilities. The owner/developer and/or project is required to relocate existing facilities in conjunction with the construction of nonadjacent improvements, and/or special facilities, and shall be eligible for reimbursement of actual costs if said facilities are relocated to their ultimate location. Reimbursement shall be provided by a special facility contribution assessed from the property of which the improvements were relocated within the frontage.

(§ 1, Ord. 89-32 , eff. September 6, 1989 ; as amended by §§ 1, 2, Ord. 90-17 , eff. May 6, 1990 ; § 11, Ord. 93-19 , eff. August 18, 1993 ; § 3, Ord. 95-14 , eff. June 30, 1995 ; §§ 10, 11, Ord. 96-10 , eff. July 1, 1996 ; § 30, Ord. 04-14 , eff. May 5, 2004 ; § 11, Ord. 13-13 , eff. July 12, 2013 )