§ 7.7.07: Major street development fees.
(a) Fee basis and application. Except as noted below, all fees will be calculated on the basis of estimated total construction and right-of-way acquisition costs of the relevant improvements within the service area divided by the total of the service area’s factored acreage. The major street development fee rates shall be established by resolution adopted by the City Council, based upon the justification reports, as those reports may be subsequently amended or supplemented, and upon a determination that there is a reasonable relationship between the amount of the fee and the cost of the public improvement, or portion thereof, attributable to development of which the major street development fees are imposed. The major street development fees shall be included in the Master Development Fee Schedule and shall include an administrative charge, not to exceed the percentage shown in the Master Development Fee Schedule, to cover the cost of the City’s record keeping and handling, except that if sufficient fees are held in the particular fund and general interest sufficient to cover such costs, the administrative charge will be taken from such interest. The major street development fees shall be based on the following: (1) Residential projects shall pay major street development fees per dwelling unit. A dwelling unit shall be defined as a room or suite of rooms which is occupied exclusively by one family (adjoining suites shall be considered separate units) for living and sleeping purposes, including a single-family residence, mobile home unit, apartment, townhouse, flat or condominium. Equivalent dwelling unit (EDU) shall mean, in general, a unit of development that is approximately equivalent in impact to the base unit as established in the justification reports on file with the City. (2) Retail, office, and industrial projects, assisted living facilities, and churches shall pay major street development fees per one thousand (1,000) square feet of building area. (3) Mini-storage facilities shall pay major street development fees per gross acre and shall be assessed based on the VMT factor associated with industrial land use. (4) The rates charged for all projects except assisted living facilities, mini-storage facilities, and churches shall be based on the zoning of the property. Retail rates will apply on properties that are zoned C-1, C-2, C-3, and PCC. Office rates will apply to properties zoned C-P, R-T, and P-F. Industrial rates will apply to properties zoned C-M, M-1, M-2, and M-P. For land uses, except those listed above, that are allowed in multiple zone districts the higher of the rate for the land use or the rate associated with the zoning shall apply. (5) Major street development fees for assisted living facilities shall be assessed at industrial rates regardless of the underlying zoning. (6) Major street development fees for churches shall be assessed at office rates regardless of the underlying zoning. (7) When structural additions are added to an existing multifamily residential structure which adds dwelling units, street fees shall be assessed and collected for each new dwelling unit based on the ratio of the additional dwelling units to the total dwelling units including the new dwelling units, multiplied by the total gross acreage of the lot. (8) No street fees will be required for modifications to existing single-family residential structures meeting the following criteria: (a) The structure was originally constructed within the City’s corporate limits; or (b) The structure lies within the City’s original 1912 corporate limits. (9) The fee for modifications to existing single-family residential add to the building square footage but do not meet the above criteria and have not fully paid street fees shall be based on the ratio of the additional building square footage to the total building square footage including the building addition, multiplied by the gross area of the lot. (10) When structural additions are added to an existing nonresidential structure which has not fully paid its street fees, street fees shall be assessed and collected based on the new square footage. (11) All fees will be adjusted annually to reflect actual construction costs or the percentage increase or decrease in the Engineering News Record Index for the California Cities for the twelve (12) month period preceding December. All fees shall include an administrative charge not to exceed the percentage shown in the Master Development Fee Schedule of the sum of all major street fees to cover the cost of City’s record keeping and handling, except that if sufficient fees are held in the particular fund and general interest sufficient to cover such costs, the administrative charge will be taken from such interest. (b) Fee categories and coverage. (1) Outside travel lane fee. This fee shall be for funding the right-of-way (land cost only) and the actual construction cost (plus engineering and inspection) of the frontage improvements and outside travel lane improvements. For purposes of administering the outside travel lane fee and reimbursements on projects approved after the effective date of the ordinance codified in this chapter, landscaping and irrigation facilities between the curb and the property line and right-of-way beyond ten feet (10') from the ultimate face of curb are excluded from the frontage improvements and are not funded by the outside travel lane fee. Project approval means at least one final map has been approved pursuant to an active tentative map or a building permit has been issued pursuant to an approved site plan review. (2) Center travel lane fee. This fee shall be for funding the right-of-way (land cost only) and the actual construction costs (plus engineering and inspection) of the center travel lane improvements. For all developments in Service Area 3, said fee shall not be required. (3) Special facility contributions. These are contributions made to fund the actual cost of special facilities, as described in Section 7.7.02, or for the relocation of existing facilities to their ultimate location other than such facilities within the adjacent improvement area bounded by the centerline of the street and the parcel boundaries, and shall be collected at the time of development of the parcel(s) for which said facilities have been relocated. (4) Bridge fee. This fee shall be for funding the actual construction cost (plus engineering and inspection) of the bridge improvements. (5) Traffic signal fee. This fee shall be for funding the actual construction cost (plus engineering and inspection) of the traffic signal improvements. (6) Local street fee. This fee shall be the actual construction costs, including engineering and inspection, plus the right-of-way costs of the portion of street and right-of-way constructed and provided in excess of one-half (1/2) the ultimate required right-of-way. (c) Exemptions. (1) Any development considered to be public infrastructure shall be exempt from the payment of center travel lane, outside travel lane, traffic signal, bridge, and administrative fees under this section. (2) Fresno Metropolitan Flood Control District master planned permanent storm drain retention basins shall be exempt from the payment of center travel lane, outside travel lane, traffic signal, bridge, and administrative fees under this section. The outside travel lane improvement costs and the center and outside travel lane right-of-way acquisition costs along the master planned permanent storm drain retention basins shall not be included in the costs used as the basis for calculating the fee rates as noted above.
(§ 1, Ord. 89-32 , eff. September 6, 1989 ; as amended by §§ 3—5, eff. June 6, 1990 ; § 2, Ord. 92-27 , eff. July 22, 1992 ; § 15, Ord. 93-19 , eff. August 18, 1993 ; § 12, Ord. 93-24 , eff. December 1, 1993 ; § 7, Ord. 95-14 , eff. June 30, 1995 ; § 12, Ord. 96-10 , eff. July 1, 1996 ; §§ 2, 12, Ord. 02-12 , eff. June 5, 2002 ; § 19, Ord. 03-15 , eff. June 18, 2003 ; § 5, Ord. 03-21 , eff. August 13, 2003 ; § 31, Ord. 04-14 , eff. May 5, 2004 ; § 13, Ord. 10-19 , eff. January 7, 2011 ; § 11, Ord. 13-13 , eff. July 12, 2013 ; § 6, Ord. 13-25 , eff. December 2, 2013 ; § 2, Ord. 15-07 , eff. May 1, 2015 ; § 3, Ord. 22-07 , eff. October 12, 2022 )
Ask a question about Clovis law
Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.