§ 15.62.340 — Fills

Municipal Code of the City of Daly City, California (Codified through Ordinance No. 1492, passed June 8, 2026 (Supp. No. 39)) · Daly City Municipal Code § 15.62.340

Corpus is an independent public-information project, not the official City of Daly City website. Stable reference: corpuslaw.us/code/bd650640-600e-4796-8287-d1d64048e05e

15.62.340 - Fills.

A. General. Unless otherwise recommended in the approved soil engineering report, fills shall conform to the provisions of this section. In the absence of an approved soil engineering report, these provisions may be waived for minor fills not intended to support structures. B. Fill Location. Fill slopes shall not be constructed on natural slopes steeper than two to one unless specifically recommended by a qualified civil engineer or engineering geologist and approved by the city engineer. C. Preparation of Ground. The ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable materials, scarifying to provide a bond with the new fill, and, where slopes are steeper than five to one, and the height is greater than five feet, by benching into sound bedrock or other competent material as determined by the civil engineer and/or engineering geologist. The bench under the toe of a fill on a slope steeper than five to one shall be at least ten feet wide. The area beyond the toe of fill shall be sloped for sheet overflow or a paved drain shall be provided. Where fill is to be placed over a cut, the bench under the toe of fill shall be at least ten feet wide but the cut must be made before placing fill and approved by the civil engineer and/or engineering geologist as suitable foundation for fill. Unsuitable soil is soil which, in the opinion of the city engineer, the civil engineer or the geologist, is not competent to support other soil or fill, to support structures or to satisfactorily perform the other functions for which the soil is intended. D. Fill Material. Detrimental amounts of inorganic material shall not be permitted in fills. Except as permitted by the city engineer and/or a qualified civil engineer retained by the owner, no rock or similar irreducible material with a maximum dimension greater than twelve inches shall be buried or placed in fills. Exception: The city engineer may permit placement of larger rock when the soil engineer properly devises a method of placement, continuously inspects its placement and approves the fill stability. The following conditions shall also apply: 1. Prior to issuance of the grading permit, potential rock disposal areas shall be delineated on the grading plan; 2. Rock sizes greater than twelve inches in maximum dimension shall be ten feet or more below grade, measured vertically; 3. Rocks shall be placed so as to assure filling of all voids with fines. E. Compaction. All fills shall be compacted to a minimum of ninety percent of maximum density as determined by UBC Standard No. 70-1. Field density shall be determined in accordance with UBC Standard 70-2 or equivalent as approved by the city engineer. F. Slope. The slope of fill surfaces shall be no steeper than is safe for the intended use. Fill slopes shall be no steeper than two horizontal to one vertical. G. Drainage and Terracing. Drainage and terracing shall be provided and the area above fill slopes and the surfaces of terraces shall be graded and paved as required by Section 15.62.360.

(Ord. 1213 § 1 (part), 1995)