For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.41.060 — Soil management report

Municipal Code of the City of Daly City, California (Codified through Ordinance No. 1492, passed June 8, 2026 (Supp. No. 39)) · Daly City Municipal Code § 17.41.060

Corpus is an independent public-information project, not the official City of Daly City website. Stable reference: corpuslaw.us/code/2111c835-139d-4e7a-80f4-944d9c96b197

17.41.060 - Soil management report.

In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed by the project applicant, or his/her designee, or the applicant shall complete a soil management survey (appendix E). The soil management report shall be completed as follows: 1. Submit soil samples to a laboratory for analysis and recommendations. a. Soil sampling shall be conducted in accordance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants. b. The soil analysis shall include: 1. Soil texture; 2. Infiltration rate determined by laboratory test or soil texture infiltration rate table; 3. pH; 4. Total soluble salts; 5. Sodium; 6. Percent organic matter; and 7. Recommendations. c. In projects with multiple landscape installations (i.e., production home developments) a soil sampling rate of one in seven lots or approximately fifteen percent will satisfy this requirement. Large landscape projects shall sample at a rate equivalent to one in seven lots. 2. The project applicant, or his/her designee, shall comply with one of the following: a. If significant mass grading is not planned, the soil analysis report shall be submitted to the local agency as part of the landscape documentation package; or b. If significant mass grading is planned, the soil analysis report shall be submitted to the local agency as part of the certificate of completion. 3. The soil analysis report shall be made available, in a timely manner, to the professionals preparing the landscape design plans and irrigation design plans to make any necessary adjustments to the design plans. 4. The project applicant, or his/her designee, shall submit documentation verifying implementation of soil analysis report recommendations to the local agency with certificate of completion.

(Ord. No. 1407, § 2, 2-22-2016)

Ask a question about Daly City law

Corpus searches the Daly City sections it holds and shows the ones that match, with their citations. Free, no sign-in.