For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.50.030 — Administration

Municipal Code, City of Elk Grove, California · Elk Grove Municipal Code § 16.50.030

Corpus is an independent public-information project, not the official City of Elk Grove website. Stable reference: corpuslaw.us/code/86f100c6-6176-4fa8-b81e-35915ed2618c

§ 16.50.030: Administration.

A. Designation of the Floodplain Administrator. The Public Works Director, or their designee, is hereby appointed to administer, implement, and enforce this chapter. B. Duties and Responsibilities of the Floodplain Administrator. The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to, the following. 1. Permit Review. Review all development permits to determine that: a. Permit requirements of this chapter have been satisfied. b. All other required State and Federal permits have been obtained. c. The proposed development or encroachment does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood at any point within the City, or would otherwise comply with the provisions of this chapter. d. Any necessary letters of map revision (LOMRs) shall be approved prior to the issuance of building permits. Building permits shall not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs will allow for the construction of proposed flood control improvements, land preparation, and/or other exclusions as specified in the “Start of construction” definition. 2. Development of Substantial Improvement and Substantial Damage Procedures. a. Using FEMA publication FEMA P-758, “Substantial Improvement/Substantial Damage Desk Reference,” develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining market value. b. Assure procedures are coordinated with other departments/divisions and implemented by City staff. 3. Determine when substantial progress has been made on flood control projects for local projects relative to EGMC Section 23.42.040 (Flood combining district). 4. Review, Use, and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with EGMC Section 16.50.040(B) (Basis for Establishing the Areas of Special Flood Hazard), the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a Federal or State agency, or other source, in order to administer EGMC Section 16.50.060 (Provisions for Flood Hazard Reduction). Note: For FEMA floodplain mapped areas, a base flood elevation may be obtained using one (1) of two (2) methods from the FEMA publication FEMA 265, “Managing Floodplain Development in Approximate Zone A Areas – A Guide for Obtaining and Developing Base (100-year) Flood Elevations,” dated July 1995. Final decision of method used shall be at the sole discretion of the Floodplain Administrator. 5. Notification of Other Agencies. a. Alteration or Relocation of a Watercourse. i. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation; ii. Submit evidence of such notification to FEMA; and iii. Assure that the flood-carrying capacity within the altered or relocated portion of said watercourse is maintained. b. Base Flood Elevation Changes Due to Physical Alterations to Floodplains Shown on FIRMs. i. At substantial completion of improvements (flood control improvements, land preparation and/or other exclusions as specified in the “Start of construction” definition) as determined by the Floodplain Administrator, the Floodplain Administrator will submit to FEMA for a letter of map revision (LOMR). For private development projects, the developer shall submit to the Floodplain Administrator all necessary technical or scientific data required as part of the LOMR process prior to submittal to FEMA. ii. All LOMRs for flood control projects shall be approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs will allow for the construction of proposed flood control improvements, land preparation and/or other exclusions as specified in the “Start of construction” definition. c. Base Flood Elevation Changes Due to Physical Alterations to Unmapped Areas. No CLOMR or LOMR is required to be submitted to FEMA; however, no building permits shall be issued until the applicable requirements of EGMC Section 16.50.060(C) have been satisfied as determined by the Floodplain Administrator. d. Changes in Corporate Boundaries. Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits. 6. Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed the following: a. Certification required by EGMC Section 16.50.060(A)(3)(a) (Residential Construction); b. Certification required by EGMC Section 16.50.060(A)(3)(b) (Nonresidential Construction); c. Certification required by EGMC Section 16.50.060(A)(3)(c) (Flood Openings); d. Certification of elevation required by EGMC Section 16.50.060(C) (standards for subdivisions and other proposed development); e. Certification required by EGMC Section 16.50.060(D)(2) (floodways). 7. Map Determination. Make interpretations, where needed, as to the exact location of the boundaries of the areas of special flood hazard, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in EGMC Section 16.50.050(D) (Appeals). 8. Remedial Action. Take action to remedy violations of this chapter as specified in EGMC Section 16.50.040(C) (Compliance). 9. Planning. Assure the City’s General Plan and Zoning Code are consistent with floodplain management objectives herein.

( Ord. 15-2016 § 5 (Exh. C), eff. 9-23-2016 ; Ord. 14-2017 § 3 (Exh. A), eff. 6-23-2017 ; Ord. 3-2025 § 3 (Exh. A), eff. 3-14-2025 ; Ord. 13-2025 § 3 (Exh. C), eff. 7-25-2025 )

Ask a question about Elk Grove law

Corpus searches the Elk Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.