§ 15.40.060 — Permit—Exceptions

Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 15.40.060

Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/feb57c00-c5af-426a-a64a-9b025c535ec6

15.40.060 - Permit—Exceptions.

A grading permit shall not be required for the following exceptions, but in all other respects the provisions of this chapter shall apply: A. An excavation below finished grade for swimming pool or underground structure authorized by a valid building permit; B. An excavation or fill authorized by a valid plumbing permit; and C. Grading by or for a public agency or utility company when specifically exempted by the City Engineer and/or Chief Building Official. D. Minor grading, that will not redirect or concentrate existing drainage flows, and of negligible hazard, where site modification does not exceed a total area of five thousand (5,000) square feet or when specifically exempted by the City Engineer and/or Chief Building Official. E. An excavation that does not exceed fifty (50) cubic yards, does not create a cut slope greater than five (5) feet measured vertically upward from the cut surface to the cut surface of the natural grade, and is not steeper than two (2) units horizontal to one unit vertical (fifty (50) percent slope). F. A fill not intended to support a structure, that does not obstruct a drainage course and complies with one of the following conditions: 1. Is less than one foot (0.3 m) in depth and is placed on natural terrain with a slope flatter than five (5) units horizontal to one unit vertical (twenty (20) percent slope). 2. Is less than three (3) feet (0.9 m) in depth at its deepest point measured vertically upward from natural grade to the surface of the fill, does not exceed fifty (50) cubic yards, and creates a fill slope no steeper than two (2) units horizontal to one unit vertical (fifty (50) percent slope). 3. Is less than five (5) feet (1.5 m) in depth at its deepest point measured vertically upward from natural grade to the surface of the fill, does not exceed twenty (20) cubic yards, and creates a fill slope no steeper than two (2) units horizontal to one unit vertical (fifty (50) percent slope). Exceptions will only be granted upon presenting satisfactory evidence of earthwork depths and quantities to the City Engineer for review. Earthwork calculations shall be prepared and stamped by a registered civil engineer to certify earthwork quantities, excavation and/or fill depths, and slope.

(Ord. No. 3032, § 2, 1-23-2024)