§ 15.40.070 — Permit—Application
Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 15.40.070
Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/facf1516-d0b4-46e3-9a35-036d215b721a
15.40.070 - Permit—Application.
A. An applicant for a grading permit shall first file an application there for in writing with the Department of Public Works-Engineering Division. Every such application shall: 1. Give the name and address of the record owner(s) of the site; 2. Give the name and address of the grading contractor; 3. Give the legal description and street address of the site; 4. State the purpose of the work; 5. Identify and describe the work to be covered by the permit for which application is made; 6. Be signed by the permittee, who shall be responsible for the correctness of the work and for requesting the inspections required in this chapter; 7. Be accompanied by plans, including: A map showing the present elevation of the land and the proposed elevations of the land after completion of the proposed grading; a plot plan showing the location of the grading boundaries, surveyed lot lines, neighboring public ways and sufficient dimensions and other data to show the location of all work; description of the type and classification of soil in Appendix J Section J103 of the California Building Code; details and location and elevations of proposed drainage structures, piping, walls and cribbing (if any); and such other information that the engineer of record may require to carry out the purpose of this chapter. All plans shall bear the name of the person responsible therefor and shall be submitted to the City Engineer in duplicate. All such plans and specifications shall be prepared by a registered civil engineer; 8. Be accompanied by a preliminary soil report prepared by a registered soils engineer, which shall be based on adequate test borings or excavations. The report may be waived if the available information as to the qualities of the soil satisfies the City Engineer that no preliminary analysis is necessary. a. If the preliminary soil report indicates the presence of critically expansive soils or other soil problems which, if not corrected, would lead to structural defects, then a soil investigation and report shall be required for each site. The soil investigation and report shall be prepared by a registered soils engineer. The report shall recommend corrective action which is likely to prevent structural damage to any structure to be constructed on the expansive soil. b. The soil investigation and report shall be approved if the City Engineer and/or Chief Building Official determines that the recommended action will likely prevent structural damage to any improvement to be constructed. As a condition to the issuance of a building permit, the approved recommended action shall be incorporated in the construction of any improvement on the site. 9. Applicant shall comply with city's grading guideline for additional plan check and permit procedures; submittal requirements; and plan check and permit fees. B. When an erosion and sedimentation control permit is required by Section 15.40.050, the provisions of said permit shall supersede conflicting provisions of any other permit. The application shall be accompanied by plans and specifications prepared by a registered civil engineer. The developer shall be guided by the principles of erosion prevention described in the following subdivisions or by any other acceptable principles or practices. 1. The erosion and sedimentation control plan should be fitted to the topography and soil class so as to create the least potential for soil loss. Maximum use shall be made of vegetation to minimize inevitable soil loss through land disturbing activity, such as: a. Natural vegetation should be retained wherever possible; b. Where inadequate natural vegetation exists, or where it becomes necessary to remove existing natural vegetation, temporary vegetation or mulching should be installed promptly to minimize inevitable soil loss and to ensure that soil losses are kept below the tolerable limits; c. Erosion control elements shall be implemented as soon as practical in the development process, except that the time elapsed shall not exceed sixty (60) days after the cessation, termination or completion of grading, whichever comes first. 2. Exposure of the soil through land disturbing activity should be held to the smallest practicable area and to the shortest practicable period of time consistent with maximum tolerable soil loss levels. 3. Appropriate provision should be made to accommodate increased storm water runoff and consequent soil loss occasioned by changed soil and surface conditions during and after development. In addition to the use of vegetation and limitations on soil exposure as prescribed herein, such provisions may include, but are not limited to: a. Installing and maintaining sediment basins, debris basins, desilting basins or silt traps to substantially reduce sediment from runoff water. C. Whenever an erosion and sedimentation control permit is required, a security deposit per the current Department of Public Works-Engineering Division fee schedule shall be required to guarantee that provisions of the permit are met. Any measures which are temporary and portable, such as sandbags and Visqueen, may be stored on site so as to not interfere with normal construction activity during dry weather. However, any necessary measures shown on the approved plan shall be in place during any storm event. 1. If those erosion control measures shown on the plan are not in place within twenty-four (24) hours of the prediction of a storm event by the U.S. Weather Service, the City Engineer may issue a stop work notice until such measures installed and storm water pollution prevention plan is fully implemented. 2. If any sedimentation does collect in the public right-of-way, it shall be cleaned up within twenty-four (24) hours of the end of each storm event, the City Engineer may issue a stop work notice until such measures installed and storm water pollution prevention plan is fully implemented.
(Ord. No. 3032, § 2, 1-23-2024)
Ask a question about El Monte law
Corpus searches the El Monte sections it holds and shows the ones that match, with their citations. Free, no sign-in.
