§ 17.134.060 — Development opportunity reserve (DOR)
Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 17.134.060
Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/685af9fb-f6cc-4766-ad97-5f2e6bb2acbc
17.134.060 - Development opportunity reserve (DOR).
A. Purpose and Overview. 1. The intent of the development opportunity reserve (DOR) is to encourage increased development intensity concurrent with the delivery of public improvements or other community benefits to satisfy the increased demand for public amenities that come with the increased development intensity. 2. Each subarea within the Downtown Specific Plan has development standards on permitted maximum height, number of stories, nonresidential floor area ratio (FAR) and residential density by-right. A "development bonus" or DOR is also provided for in each sub-area. Through the DOR process, the applicant may increase the height, number of stories, nonresidential FAR and residential density, subject to the delivery of additional amenities by the applicant or payment of an in-lieu fee. 3. The DOR supports an inventory of public improvements and amenities determined to be necessary to support development intensity within the Downtown Specific Plan. The applicant may deliver the improvements and amenities or pay an in-lieu fee. B. Types of DOR Credits. Increased levels of development intensity are permitted as consideration for the delivery of public improvements as measured by "residential DOR credit(s)" and "commercial DOR credit(s)," collectively "DOR credits," as described below: 1. One residential DOR credit permits the development of one residential dwelling unit greater than the number permitted by-right, up to the maximum permitted under the specific plan DOR. 2. One commercial DOR credit permits the development of two thousand (2,000) gross square feet of nonresidential square footage greater than the number permitted by-right, up to the maximum permitted under the specific plan DOR. 3. Projects that exceed the height or number of stories permitted by-right, but do not exceed the number of residential dwelling units permitted by-right or the nonresidential square footage greater than the number permitted by-right. The minimum number of DOR Credits shall equal the number of residential dwelling units or nonresidential square footage that are located in the portions of the project that exceeds the height or number of stories permitted by-right. For example, if a property permits fifty (50) units and a height of two (2) stories by-right, and an applicant proposes fifty (50) units and a height of three (3) stories (allowed through the DOR process), the applicant will need to secure DOR credits for all the units that are fully or partially located on the third floor. 4. The DOR credit in-lieu fee shall be as adopted by the most recent City Council fee resolution. C. Application. A DOR permit shall require the approval of a director level zoning clearance. D. DOR Credits—Private Improvements. The applicant may propose the following improvements, amenities and incentives on private property to receive DOR Credits: 1. Affordable Housing. a. One very low income unit shall be equal to one and one-half (1½) DOR credit. b. One lower income unit shall be equal to one DOR credit. c. One moderate income unit shall be equal to one-half DOR credit. 2. Arts or Cultural Space. One DOR credit for each two thousand (2,000) square feet of arts or cultural space. 3. Parcel Consolidation. One DOR credit for each parcel consolidated into one parcel with a minimum total area of twenty thousand (20,000) square feet. Therefore, if four (4) parcels were consolidated to create one parcel with an area of twenty thousand (20,000) square feet, the project will be eligible for four (4) DOR credits. 4. Parking Spaces. a. Privately-Accessible Parking Spaces. One DOR credit for every six (6) parking spaces in excess of the minimum required per Chapter 17.70 (Parking Regulations) of this title. b. Publicly-Accessible Parking Spaces. One DOR credit for every four (4) publicly accessible parking spaces in excess of the minimum required per Chapter 17.70 (Parking Regulations) of this title. 5. Façade Remodel for Existing Structures. One DOR credit for each fifty (50) feet of linear building façade that will be remodeled. Minor improvements such as new paint and signage shall not constitute a façade remodel. 6. Public Art. a. One DOR credit when public art in installed on-site or on a nearby site and the art has a minimum value of one-half percent of the total project cost; or b. Two (2) DOR credits when public art is installed on-site or on a nearby site and the art has a minimum value of one and one-quarter (1¼) percent of the total project or exceeds the public art cap by more than ten (10) percent as adopted by the most recent City Council fee resolution. 7. Publicly Accessible Open Space. a. Residential Only Projects. One Residential DOR Credit for each four hundred (400) square feet of publicly accessible open space, for a maximum of five (5) residential DOR credits. b. Nonresidential Projects or Mixed-Use Projects with Residential. i. Projects with three thousand five hundred (3,500) square feet or less of nonresidential space. One DOR credit for each four hundred (400) square feet of publicly accessible open space, for a maximum of eight (8) DOR credits. ii. Projects with more than three thousand five hundred (3,500) square feet of nonresidential space. One DOR credit for each four hundred (400) square feet of publicly accessible open space in excess of what is required in subsection 17.134.040.E. of this chapter, for a maximum of ten (10) DOR credits. c. Examples of Open Space. Examples include, but are not limited to, formal plazas, urban gardens, park/green space, open space and courtyard space. 8. Other Publicly-Accessible Improvements, Amenities or Other Incentives. Other proposals to secure DOR credits may be considered by the Community Development Director on a case-by-case basis. The Community Development Director may also refer the request to the Planning Commission for consideration. E. DOR Credits—Public Improvements. The applicant may propose improvements within the public right-of-way and on other city property to receive DOR credits: 1. Calculations. The number of DOR credits shall be based on the value of the public improvement(s) in comparison to the DOR credit in-lieu fee. Therefore, if the value of the public improvement(s) is four (4) times the DOR credit in-lieu fee, the project will be eligible for four (4) DOR credits. 2. Process. The contract for the delivery of public improvements shall be awarded through a public bid process managed by the city. 3. Underpayment. To the extent that the actual contact amount is less than the equivalent amount of DOR credits required for the project, the applicant may deliver additional public improvements or pay the DOR credit in-lieu fee. 4. Overpayment. To the extent that the actual contact amount is greater than the equivalent amount of DOR credits required for the project, the applicant may request a credit from the city for the difference. At the city's discretion, the city may reimburse the applicant with funds from the DOR Public Improvement Fund, or the city may wait for receipt of additional in-lieu payments from which it will reimburse the applicant. The applicant may not utilize the credits on another project without the expressed permission of the Community Development Director. 5. Quality and Design of Improvements. The Community Development Director and Public Works Director must approve the design, plans and specifications for all public improvements delivered. All public improvements must meet or exceed city standards. 6. Timing to Deliver the Public Improvements. a. The work shall be completed prior to the issuance of building permits; or b. A contract to complete the award shall be signed prior to the issuance of building permits. The applicant shall be responsible for maintaining a completion bond sufficient to cover the scope of the public improvements until the city has issued a certificate of completion for the public improvements. The cost of the competition bond may be included in the calculation of the contract amount and equivalent DOR credits in-lieu fee. F. DOR Credits—In-lieu Fee. The applicant may propose to pay an in-lieu fee to receive DOR credits. Payments shall be due at time of building permit issuance. Payments shall go into a DOR Public Improvement Fund. Such funds shall only be used to support the delivery of public improvements on the DOR Public Improvements list within the Downtown Specific Plan.
(Ord. No. 3053, § 3(Exh. A), 5-14-2025)
Ask a question about El Monte law
Corpus searches the El Monte sections it holds and shows the ones that match, with their citations. Free, no sign-in.