§ 33-1122: Electric generating facilities.

(a) Definition. As used in this section, an electric generating facility means a structure, apparatus or feature incorporating machinery or equipment, designed to produce electricity for power consumption. (b) Permit requirements. Except where the city's land-use-permit authority is preempted by state law, the land use permit required is determined by the type of facility, as follows: (1) A conditional use permit is required for commercial electric generating facilities proposed for the primary purpose of providing electricity to the power grid. Solar-energy systems are exempt from this requirement and design review unless the building official determines the solar-energy system would have a specific, adverse impact upon the public health and safety and there is no feasible method to avoid the specific adverse impact. Decisions of the building official may be appealed to the planning commission by filing a written request with any required fee, with the department of community development not more than 10 days following the final decision of the building official. The appeal shall state the reasons why the determination is contested and which findings, the appellant believes, were made in error. Decisions of the planning commission may be appealed to the city council pursuant to Article 61, Division 6 of the Zoning Code. Facilities shall conform to the following criteria: (A) All buildings, structures and landscaping should be compatible with surrounding development; (B) Facilities shall involve combined cycle technology as appropriate; (C) Facilities shall utilize most efficient, state-of-the-art technology that is reasonably available; (D) All feasible measures shall be incorporated to minimize pollutants generated by the facility; (E) Fuel used to generate electricity shall be limited to natural gas, solar, wind or other renewable energy resources; (F) Noise levels produced by the generator shall comply with noise ordinance standards for the zone based on 24 hour operation; (G) Transmission lines and components shall be under grounded to the maximum extent feasible; (H) Facilities shall meet the provisions for reducing NOx in section 33-1122(d)(7); (2) A plot plan application shall be required for facilities that retrofit operations to incorporate co-generation, electric production involving any amount of electricity. The application shall include the following: (A) All buildings, structures and landscaping should be compatible with surrounding development; (B) Pollutants generated in producing electricity by the facility shall be demonstrated to constitute the lowest available emission rates; (C) The energy generated is intended to serve facilities on-site; (D) Noise levels produced by the generator shall comply with noise ordinance standards for the zone based on 24 hour operation. (c) Standby/emergency/back-up generators. Emergency back-up generators, including those proposed for previously approved discretionary projects, and portable generators associated with a temporary event shall conform to the following criteria: (1) The energy generated is intended to serve facilities on-site during outages of the primary power or during a temporary event; (2) Noise levels produced by the generator shall comply with noise ordinance standards for the zone based on 24 hour operation; (3) All buildings, structures and landscaping should be compatible with surrounding development; (4) Standby, diesel generators shall demonstrate that the best available technology is being utilized; (5) Standby, emergency generators may operate for no more than 52 hours per year, except in an emergency situation where the primary power is unavailable in the community; (6) Testing and maintenance of standby, diesel generators may only occur between the hours of 7:00 a.m. and 5:00 p.m. (d) General application contents. In addition to any requirements specified later in this section, electric generating facility applications shall include the following information: (1) Description of the physical and operating characteristics of the facility; the maximum design capacity of the facility; the operating schedule; the intended users of the generated energy; and if any electric energy is to leave the site, the physical and contractual arrangement for tying into other facilities; (2) Alternatives to the proposed facility. This will include reliability, as well as economic and environmental advantages and disadvantages; (3) Plans for overhead or underground transmission lines, transformers, inverters, switchyards or any required new or upgraded off-site transmission facilities; (4) Documentation regarding the toxic and/or hazardous materials that will be used during the construction and operation, including the transfer and loading of hazardous materials to ensure on-site containment, estimates of the volumes, the inventory control system that is proposed, the disposition of these materials and the disposal system and ultimate location for disposal; (5) Details pertaining to all off-site improvements associated with constructing the facility including, but not limited to; street improvements, water, natural gas, electricity, etc. (6) The following studies shall be prepared that clearly document compliance with state and federal air quality standards: (A) A health assessment modeled on local meteorological conditions; (B) A concentration analysis of all pollutants at emission sources; (C) A cancer risk assessment; (7) In an effort to reduce nitrogen oxide (NOx) emissions, enhance the spread of cleaner technologies and advance alternative technology, facilities shall include in their proposal details, NOx offsets at a 1.2:1 ratio. Standby, diesel generators shall be exempt from NOx offset requirements. Said offsets shall include, but not be limited to: (A) Purchasing emissions reductions credits through a local, state or federal program that demonstrably offsets local air quality impacts; (B) Providing funding for retrofitting mobile or stationary pollution generators to the satisfaction of the city reducing nitrogen oxide emissions; (C) Providing assurances that the pollution offsets established as mitigation remain effective during the operational life of the facility. (e) Approvals from other agencies. Prior to deeming an application complete, if another agency must approve the proposed facility the applicant shall: (1) Provide documentation that the San Diego Air Pollution Control District has deemed the application for the proposed facility as substantially complete; (2) Provide authorization from San Diego Gas and Electric to extend necessary utilities to serve the site; (3) Provide documents and contracts issued by the state and other appropriate agencies for the distribution of power. (f) Development standards—Hazardous materials. Prior to delivery and use on-site, the applicant shall submit a hazardous material and waste management plan for review and approval by the fire chief including routes used to transport hazardous materials. Details to be contained in this plan will be established in the environmental review and development plan approval process. (g) Co-generation and steam electric generating facilities. (1) Application contents. In addition to the general requirements of section 33-1122(d), (e) and (f) an application for co-generation and steam electric generating facilities shall describe: (A) The cooling system, including volume and flow characteristics, source of the cooling fluid and the location, flow and chemical make-up of any liquid or gaseous discharges; (B) The potable and/or non-potable water requirements and proposed source; (C) The fuel sources, delivery and storage systems and firing characteristics; (D) The air pollution control system and emission characteristics; (E) The characteristics of the energy conversions of the proposed facility and the proportions going to the various end-uses and their seasonal variation. (h) Photovoltaic generating facilities for residential and commercial sites. (1) Application contents. In addition to the general requirements of section 33-1122(d), (e) and (f) an application for a photovoltaic generating facility shall describe: (A) The structural design, location, positioning and/or tracking system design, including documentation that no concentrated reflections will be directed at occupied structures, recreation areas or roads; (B) How public access will be restricted or why public liability is not a concern at the particular facility. (i) Wind energy conversion facilities (WECS). (1) Application contents. In addition to the general requirements of section 33-1122(d), (e) and (f) an application for a wind energy conversion facility shall describe: (A) The location and elevation of proposed WECS; (B) The location of all aboveground utility lines on-site or within one radius of the total height of the WECS; (C) The location and size of structures and trees above 35 feet within a 500 foot radius of the proposed WECS. For purposes of this requirement, electrical transmission and distribution lines, antennas, slender or open lattice towers are not considered structures. (2) Development standards. The following standards apply: (A) Setbacks. The facility shall be set back from property lines at least five rotor diameters for a horizontal axis WECS or the height of a vertical axis WECS. (B) Rotor safety. Each wind conversion system shall be equipped with both manual and automatic controls to limit the rotational speed of the blade below the design limits of the rotor. The application must include a statement by a California-registered professional engineer certifying that the rotor and overspeed controls have been designated and fabricated for the proposed use in accordance with good engineering practices. The engineer shall also certify the structural compatibility of proposed towers and rotors. The manufacturer would normally supply said certification. (C) Guy wires. Anchor points for any guy wires for a WECS tower shall be located within property lines and not on or across any above-ground electric transmission or distribution line. The point of ground attachment for the guy wires shall be enclosed by a fence six feet high or sheathed in a bright orange or yellow covering from three to eight feet above ground. (D) Tower access. Towers shall be constructed to provide one of the following means of access control, or other appropriate method approved by the director of community development. (i) Tower-climbing apparatus located no closer than 12 feet from the ground; (ii) A locked climb-deterrent device installed on the tower; or high. (iii) The tower shall be completely enclosed by a locked, protective fence at least six feet (E) Signs. At least one sign shall be posted at the base of the tower warning of electrical shock or high voltage. (F) Electromagnetic interference. The wind energy conversion system shall be operated such that no disruptive electromagnetic interference is caused. If it has been demonstrated to the planning director that a wind energy conversion system is causing harmful interference, the operator shall promptly mitigate the harmful interference. (G) Height. The facility shall provide documentation that the height of the lowest part of the WECS shall be adequate to ensure safety within 30 feet above the highest existing major structure or tree within a 250 foot radius. For purposes of this requirement, electrical transmission and distribution lines, antennas and slender or open lattice towers are not considered structures. Modification of this standard may be made when the applicant demonstrates that a lower height will not jeopardize the safety of the wind turbine structure. (H) Distance from structures. Horizontal axis wind turbines shall be placed at a distance of at least two times the total tower height from any occupied structure. Vertical axis wind turbines shall be placed at a distance of at least 10 blade diameters from any structure or tree. A modification may be granted by the director of community development for good cause shown, however, in no case shall the turbine be located closer than three blade diameters to any occupied structure. (I) Undergrounding. Electrical distribution lines on the project site shall be undergrounded up to the low voltage side of the step-up transformer, to the point of on-site use, or to the utility interface point of on-site substation. (J) Public nuisance. Any WECS that has not generated power for 12 consecutive months is hereby declared to be a public nuisance that shall be abated by repair, rehabilitation, demolition or removal.

( Ord. No. 2001-19(R) , § 4, 7-25-01 ; Ord. No. 2002-10 , § 4, 4-10-02 ; Ord. No. 2005-14 , § 1, 6-15-05 ; Ord. No. 2008-01 , § 4, 2-6-08 ; Ord. No. 2016-15 , § 4, 10-26-16 ; Ord. No. 2018-07R , § 7, 4-18-18 )