For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33-1124 — Electric vehicle charging stations

Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Zoning Code § 33-1124

Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/65467681-e53b-494d-9fbd-d33a603d7d7b

§ 33-1124: Electric vehicle charging stations.

(a) Applicability. This section shall apply to the permitting of all electrical vehicle charging stations (EVCS) or any other electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle. (1) An EVCS shall be allowed within any legal single-family residential garage or carport, and any multifamily parking space; subject to all applicable city, state, and federal code requirements, and the following: (A) The EVCS shall be protected as necessary to prevent damage by automobiles, vandalism, and to be safe for use in inclement weather. (B) The EVCS shall have complete instructions and appropriate warnings posted in an unobstructed location next to each EVCS. When needed, signage shall be installed designating spaces with charging stations for electric vehicles only. (C) The EVCS is located to discourage unauthorized use, such as public access to the charging station. (D) Charging stations and associated equipment or materials may not encroach on the minimum required clear areas from the public right-of-way, driveways, parking spaces, garages, or maneuvering areas. (2) An EVCS for non-commercial (no service fee) or private use shall be permitted as an accessory use within any legal commercial, industrial, or other non-residential parking space in a parking lot or in a parking garage or carport; subject to all applicable city, state, and federal code requirements, and the following: (A) The requirements listed in subsection (a)(1). (B) Be located in desirable and convenient parking locations that will serve as an incentive for the use of electric vehicles. (C) One standard non-illuminated sign, not to exceed four square feet in area and 10 feet in height, may be posted for the purpose of identifying the location of each cluster of EVCSs. (D) The EVCS may be on a timer that limits the use of the station to the normal business hours of the use(s) that it serves to preclude unauthorized use after business hours. (3) An EVCS for commercial (service fee) and/or public use shall be permitted as a primary or accessory use through the approval of a minor use permit, subject to all applicable city, state, and federal code requirements; except that the director of community development, or designee, is authorized to designate parking spaces or stalls in an off-street parking facility owned and operated by the City of Escondido for the exclusive purpose of charging and parking a vehicle that is connected for EVCS purposes. (A) Only plug-in electric vehicles that are actively charging, as indicated by the electric vehicle charging station monitor display, may be parked at EVCS or in EVCS zones located on any parking facility owned, leased, or operated by the City of Escondido. No person shall park or cause to be parked or allow to remain standing any vehicle at an EVCS or EVCS zones located on any parking facility owned, leased, or operated by the City of Escondido, unless the vehicle is an electric vehicle, is actively charging, and has not exceeded any applicable parking time limit. (b) Application. All applicants for an EVCS permit should ensure that the proposed charging station meets all requirements found in the EVCS Permitting Checklist, on file with the Building Division. (1) For a project complying with the checklist for an EVCS the applicant may submit the permit application and associated documentation to the city's building division by personal, mailed, or electronic submittal. "Electronic submittal" means the utilization of email, the Internet, facsimile, or any other plan review software operated by the city. Electronic submittal of the required permit application and documents through city-utilized computer-based software shall be made available to all EVCS permit applicants. (2) An applicant's electronic signature shall be accepted on all forms, applications, and other documents in lieu of a wet signature. (c) Permit review requirements. (1) The building official shall carry out an administrative review process to streamline approval of EVCS. If the application meets the requirements of the approved checklist and standards and there are no specific, adverse impacts upon public health or safety, the official shall complete the building permit approval process. Review of the application for EVCS shall be limited to the official's review of whether the application meets the requirements of this section, as well as any local, state, and federal health and safety requirements. Such approval shall not include any necessary approval or permission by a local utility provider to connect the EVCS to the provider's electricity grid. The applicant is responsible for obtaining such approval or permission from the local utility provider. (2) If an application is deemed incomplete, the building division shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. (3) The building division may require an applicant to apply for a minor use permit if the official finds, based on substantial evidence, that the EVCS could have a specific, adverse impact upon the public health and safety. Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. Such decisions may be appealed to the planning commission. (4) If a minor use permit is required, the zoning administrator may only deny such application if he/she makes written findings based upon significant evidence in the record that the proposed EVCS would have a specific, adverse impact upon public health and/or safety and there is no feasible method to satisfactorily mitigate or avoid the adverse impact(s). Such findings shall include the justification for the rejection of the potential feasible alternative(s) for preventing the adverse impact. Such decisions may also be appealed to the planning commission. (d) Fees. The city council may establish fees for permits issued under this section.

( Ord. No. 2017-11 , § 5, 8-16-17 )

Ask a question about Escondido law

Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.