For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.4.6 — Same - Application; form; term; display, transfer; changes; fees

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 16.4.6

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/c89b111a-c2dc-47ce-b6f5-003020097bbf

§ 16.4.6: Same - Application; form; term; display, transfer; changes; fees.

(a) Application for permit. The director of public works shall prescribe and provide a regular form of application for the use of applicants for permits required by this article. The application shall show such information and details as the director of public works may deem necessary to establish the exact location, nature, dimensions, duration and purpose of the proposed use or encroachment. (b) Exhibits required. The application shall be accompanied by maps, sketches, diagrams or similar exhibits, to the size and in the quantity as the director of public works may prescribe, sufficient to clearly illustrate the location, dimensions, nature and purpose of the proposed encroachment and its relation to existing and proposed facilities in the right of way or watercourse. (c) Consent of public agencies. The applicant shall also enclose with, attach or add to the application the written order or consent to any work thereunder, required by law, of the public utilities commission, sewer district, state department of transportation or any other public body having jurisdiction. A permit shall not be issued until and unless such order or consent is first obtained and evidence thereof filed with the director of public works. The permittee shall keep himself adequately informed of all state and federal laws and local ordinances and regulations which in any manner affect the permit. The applicant shall at all times comply with and shall cause all his agents and employees to comply with all such laws, ordinances, regulations, decisions, court and similar authoritative orders. (d) Action on applications. Applications may be approved, conditionally approved, or denied. The director of public works may use up to two working days to field check existing conditions related to the permit prior to issuance. Where the director of public works finds that the application is in accordance with the requirements of this article, he shall issue a permit for the use or encroachment, attaching such conditions as he may deem necessary for the health, safety, and welfare of the public and for the protection of the city. If the director of public works finds the application has failed to comply with Sections 16.4.6(o) and 16.4.27 of this code, he or she shall deny the permit, giving the reasons for such denial. (e) Excavation prohibited. The city shall have the power to deny a permit involving excavation in the traveled way of newly constructed and/or heavily traveled streets. (f) Form and validity. Permits must be written on a form prescribed by the director of public works which are on file at the city hall. No permit shall be valid unless signed by the director of public works or his authorized representative. (g) Term for beginning of work. The permittee shall complete the work or use authorized by a permit issued pursuant to this article within seven calendar days from date of issuance, unless a different period is stated in the permit. If the work or use is not begun accordingly, then the permit shall become void. (h) Term for completion of work. The permittee shall complete the work or use authorized by a permit issued pursuant to this article within fourteen days from the date of issuance unless a different time limit is specified in the permit. Should the permittee be unable to complete the work before the permit expires, a time extension may be granted. It shall be the permittee’s responsibility to notify the city in writing of the reason for the delay. If a time extension is justified, the extension will be noted on the permit. Failure to obtain an extension shall require the permittee to make application for a new permit. Any work done without a valid permit will require a special field investigation and resulting field investigation fee. If at any time the director of public works finds that the delay in the prosecution of completion of the work or use authorized is due to lack of diligence on the part of the permittee, he may cancel the permit and restore the right of way or watercourse to its former condition. The permittee shall reimburse the city for all expenses incurred by the director of public works in restoring the right of way or watercourse. (i) Display. The permittee shall keep any permit issued pursuant to this article at the site of work and the permit must be shown to any authorized representative of the director of public works or law enforcement officer on demand. (j) Nonassignment. Permits shall be issued only to the person making application therefor and may not be assigned to another person or location by the permittee. If any permittee assigns his permit to another or another location, the permit shall become void. (k) Changes in permit or work. No changes may be made in the location, dimension, character or duration of the encroachment, or use as granted by the permit except upon written authorization of the director of public works. No permits shall be required for the continuing use of maintenance of encroachments installed by public utilities, for changes, additions or extensions therein or hereto where such use, maintenance, changes, additions or extensions require no excavation of the right of way. (l) The City Council may from time to time establish, by resolution, fees for encroachments pursuant to the Article, and prescribe the time at which such fees become due and payable to the City. (m) Field investigation fees. Whenever any work for which a permit is required under the provision of this article is started or proceeded with prior to obtaining such permit, or when a permit has expired, a special field investigation shall be made, and a field investigation fee shall be collected in addition to any other fees. The payment of the field investigation fee shall not exempt any person from fully complying with the provisions and requirements of this article in the execution of the work nor from any other penalties prescribed by law. (n) Trench cut fee. (1) No person shall excavate in a public street without, in addition to all other requirements of this Article, paying a trench cut fee. The trench cut fee shall be set by resolution of the City Council and shall not exceed the reasonable cost necessary to mitigate the degradation to the public streets caused by such excavation. Funds collected as trench cut fees shall only be expended for the rehabilitation, resurfacing, maintenance and repair of public streets. (2) To the extent an excavation of a public street is performed pursuant to a valid franchise or agreement, which was entered into prior to the adoption of this Subsection and which grants the franchise holder or party to the agreement a specific right to perform such street excavation within the City without being subject to fee requirements, such as those set forth herein, the excavation shall not be subject to the fee requirement set forth herein. (3) Notwithstanding Section 16.4.2 (Exemptions from applicability of article) of this Article, for any excavation of a public street being performed by or for the benefit of a city enterprise, such enterprise fund may pay the trench cut fee imposed pursuant to this Subsection to offset the cost to the City for rehabilitation, resurfacing, maintenance and repair of public streets. (4) The Public Works Director may waive the trench cut fee imposed pursuant to this article in exchange for street improvements that offset the need for resurfacing, maintenance and repair caused by the street excavation. (o) Coordination with the City. (1) An applicant for an encroachment permit under this section for the placement of facilities in, along, across, or through the public right-of-way shall comply with the requirements of this article. (2) Prior to applying for an encroachment permit, any person planning to excavate in the public rights-of-way shall review the utility master plans and the City’s repaving plan on file with the director of public works and shall coordinate, to the extent practicable, with the utility and street work shown on such plans to minimize damage to, and avoid undue disruption and interference with, the use of public rights-of-way. Such coordination shall include the provision that whenever two or more parties (i.e., the City or any applicant) have proposed a major excavation in the same block, they shall meet and confer with the City regarding whether it is feasible to conduct a joint operation excavation. (3) In order to encourage coordination of excavation and pavement scheduling and planning between the City and excavators, the City shall update, at least annually, the streets included in the current year’s pavement rehabilitation plans. Information identifying public rights-of-way that are subject to moratorium provisions, and the moratorium expiration date for each such right-of-way shall be made available upon request. Public rights-of-way included in the City’s pavement rehabilitation plans shall be available for review online at the Department of Public Works’ website. (4) The director of public works shall conduct a working group meeting at least once each year at which utilities, public agencies, and other interested parties may meet to coordinate excavation and repaving schedules, which requirement may be satisfied by the Department’s regular Underground Utility Meetings. The director shall maintain a list of those requesting notice of the working group meeting, and shall provide notice, via mail or e-mail at least thirty (30) days prior to the meeting date, of the time and location of the meeting to each person who has requested notice. If the initial working group meeting is not completed on the designated meeting date, the meeting may continue on a subsequent date as the director announces at the end of the first meeting. (5) Each year, the director of public works shall make available to the utilities the roads selected for overlay. Such list may be referred to as the Annual Pavement Rehabilitation Project List. Any utility or public agency may mail written notice to the director of their intention to excavate in a public right-of-way that has been identified in the Annual Pavement Rehabilitation Project List by identifying the location and dimensions of the planned excavation and the estimated commencement and completion dates of the work. The date of completion of the planned excavation shall be no later than three years after the date of notice of the Annual Pavement Rehabilitation Project List. The notice of intention to excavate shall be mailed not more than 60 days after mailing of the Annual Pavement Rehabilitation Project List. After receipt of a timely notice, the City may delay any anticipated repaving of the affected public right-of-way to a date after the planned excavation. (6) To avoid future excavations and to reduce the number of street excavations, telecommunication companies shall be requested, when practical, to install spare conduits. (p) Need for City Communications Infrastructure. (1) To further the City’s strategic and operational goals for telecommunications services and deployment of a public communications network, the director of public works, or his or her designee, shall consider adding City communications infrastructure to any encroachment permit issued under this article for the placement of underground conduit in, along, across, or through any public right-of-way. (2) Notice Required. a. To the extent feasible, the director of public works, his or her designee, or an applicant as required by the director of public works, shall notify all known telecommunications service providers of an impending excavation and afford all such service providers the opportunity to utilize the excavation to install, upgrade, co-locate, repair, or improve their telecommunication facilities during such an excavation project. Any such notice shall be provided at least thirty (30) days prior to the commencement of excavation. All service providers utilizing the same excavation shall be responsible for their proportionate share of the excavation costs, including but not limited to the costs of permitting. No excavation may occur in violation of an excavation moratorium in effect unless otherwise approved by the written consent of director of public works. b. Notice is required when the proposed underground conduit installation will be at least 300 linear feet, or such other distance as the Public Works Department may establish in the Public Works Requirements. c. All construction, reconstruction, and repaving within a City right-of-way shall include a provision for the installation of a public utility infrastructure, such as conduit, tube, duct, or other device designed for enclosing telecommunications wires, fibers, or cables, unless the public works director determines that such installation is not practical or feasible. d. An encroachment permit shall be required and will be charged based on staff time spent at the rate in effect as established by the duly adopted Master Fee Schedule for engineering plan review. The director of public works, or his or her designee, may exempt projects from these requirements where it is determined that it is not practical, feasible, or for any other consideration. Requests for an exemption must be made in writing with an explanation as to why the project should be exempted. Cost shall not be the determining factor whether a project may be exempted. A determination from the director of public works is the final administrative determination of the matter and is not appealable. (3) Response to Notice. Upon receipt of a notice issued pursuant to subsection (2) above, the Public Works Department shall review the notice to determine whether adding City communications infrastructure to the proposed excavation project would be both financially feasible and consistent with the City’s goals. (4) Approval of Application. The City shall approve an application and issue a permit if the City finds that an applicant has complied with this chapter and all applicable provisions in the Public Works Requirements. (5) Applicant’s Incremental Costs. The City shall be responsible for the applicant’s incremental costs, as calculated by the Public Works Requirements, in the event the City installs City-owned infrastructure within the duration of the applicant’s permitted excavation. (q) Adoption of Requirements. (1) The Public Works Department shall develop and implement the Public Works Requirements consistent with the intents of this article. (2) The purpose of Public Works Requirements is to specify the circumstances under which the City may participate in an excavation project. (3) Minimum Requirements. At a minimum, the Public Works Requirements shall contain the following procedural and substantive requirements for the installation of City communications infrastructure in excavation projects: a. The process for the Public Works Department to review planned excavation projects in a timely manner to determine if City participation is feasible and to verify its participation; b. The criteria to be used by the Public Works Department to decide whether to decline to participate in excavation projects; c. The standard technical specifications for City communications infrastructure to be included in the City’s Standard Details and Specifications; d. The standard methodology for determining the incremental costs associated with installing City communications infrastructure in excavation projects; e. The requirements and process for excavators to seek exemptions from using the City’s standard methodology for determining incremental costs when installing standard City communications infrastructure in excavation projects; and f. Alternative methodologies for determining the City’s incremental costs when exemptions are granted.

( Ord. No. 84-41 , § 1 ; Ord. No. 74-25 , § 6 ; Ord. No. 2014-06 , §§ 1 – 3 ; Ord. No. 2015-09 , §§ 1, 2 ; Ord. No. 2021-10 , §§ 2, 4 – 6 )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.