For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25.33.11 — Conditions of Approval for All Facilities

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 25.33.11

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/83f36c00-0880-4864-8085-376dc31f68d1

§ 25.33.11: Conditions of Approval for All Facilities.

In addition to compliance with the requirements of this section, upon approval all facilities shall be subject to each of the following conditions of approval, as well as any Modification of these conditions or additional conditions of approval deemed necessary by the Reviewing Authority: A. Required Findings. Before the permittee submits any application for a building permit or other permits required by the Fairfield Municipal Code, the permittee must incorporate the Wireless Telecommunication Facility permit granted under this section, all conditions associated with the Wireless Telecommunications Facility permit and the approved plans and any photo simulations (the “Approved Plans”) into the project plans. The permittee must construct, install and operate the Wireless Telecommunications Facility in strict compliance with the Approved Plans. The permittee shall submit to the Fairfield Building Division an as built drawing within 90 days after installation of the facility. B. Where feasible, as new technology becomes available, the permittee shall: 1. Place above-ground Wireless Telecommunications Facilities below ground, including, but not limited to, Accessory Equipment that has been mounted to a Telecommunications Tower or mounted on the ground; and 2. Replace larger, more visually intrusive facilities with smaller, less visually intrusive facilities, after receiving all necessary permits and approvals required pursuant to the Fair-field Municipal Code. 3. The permittee shall submit and maintain current at all times basic contact and Site information on a form to be supplied by the City. The permittee shall notify the City of any changes to the information submitted within seven days of any change, including change of the name or legal status of the owner or operator. This information shall include, but is not limited to, the following: a. Identity, including the name, address and 24-hour local or toll-free contact phone number of the permittee, the owner, the operator, and the agent or person responsible for the maintenance of the facility. b. The legal status of the owner of the Wireless Telecommunications Facility, including official identification numbers and FCC certification. c. Name, address, and telephone number of the property owner if different than the permittee. 4. The permittee shall not place any facilities that will deny access to, or otherwise interfere with, any Public Utility, easement, or Right-of-Way located on the Site. The permittee shall allow the City reasonable access to, and maintenance of, all utilities and Existing public improvements within or adjacent to the Site, including, but not limited to, pavement, trees, Public Utilities, lighting and public signage. 5. At all times, all required notices and signs shall be posted on the Site as required by the FCC and California Public Utilities Commission, and as approved by the City. The location and dimensions of a sign bearing the emergency contact name and telephone number shall be posted pursuant to the approved plans. 6. At all times, the permittee shall ensure that the facility complies with the most current regulatory and operational standards including, but not limited to, radio frequency emissions standards adopted by the FCC and Antenna height standards adopted by the Federal Aviation Administration. 7. If the Director of Public Works determines there is good cause to believe that the facility may emit radio frequency emissions that are likely to exceed FCC standards, the Director of Public Works may require the permittee to submit a technically sufficient written report certified by a qualified radio frequency emissions engineer, certifying that the facility is in compliance with such FCC standards. 8. All conditions of approval shall be binding as to the applicant and all successors in interest to permittee. 9. A condition setting forth the permit expiration date in accordance with subsection 25.33.11 shall be included in the conditions of approval.

( Ord. No. 2021-09 , § 3 )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.