For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-218 — Submission of application; contents

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 23-218

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/86042840-5636-49f1-a15e-7780422ec83e

Sec. 23-218. - Submission of application; contents.

(a) All industrial and commercial users proposing to discharge nondomestic wastewater to the POTW shall complete and submit a wastewater discharge permit application to the public works director. Any existing user shall apply for a wastewater discharge permit within 30 days after notification by the public works director. The public works director may require all or some of the following information (if applicable): (1) Identifying information. a. The name and address of the facility, including the name of the operator, authorized representative, and owner. b. The SIC number according to the Standard Industrial Classification Manual, U.S. Office of Management and Budget, 1987, as amended. c. Copies of business licenses; tax or utility bills; vehicle licenses and capacity of waste hauler tank; general, automobile, workers compensation, and employer's liability insurances. d. Contact information, description of activities, facilities, and plant production processes on the premises. (2) Environmental permits. A list of any environmental control permits held by or for the facility, including, but not limited to permits issued by the San Bernardino County Department of Environmental Health Services, State of California, and South Coast Air Quality Management District, and a copy of the county business plan which addresses the location, type and quantity of hazardous materials handled by the user. (3) Description of operations. a. A brief description of activities, facilities, and processes on the premises, including average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include an eight and one-half-inch by 11-inch schematic process diagram, which indicates points of water usage, wastewater generation, treatment, and discharge to the POTW from the regulated processes. b. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are or could accidentally or intentionally be discharged to the POTW. c. Number and type of employees, hours of operation, and proposed or actual hours of operation. d. Type and amount of raw materials processed (average and maximum per day). e. Site plans, floor plans, mechanical and plumbing plans, and detail to show all sewers, floor drains, and appurtenances by size location, and elevation, and all points of discharge. f. Time and duration of discharges. g. The location for monitoring all wastes covered by the permit. (4) Flow measurement. Information showing the measured average daily flow and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). (5) Measurement of pollutants. a. The categorical standards applicable to each regulated process and any new categorically regulated processes for existing sources. b. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the public works director, of regulated pollutants in the discharge from each regulated process. c. Daily maximum and long-term average concentrations, or mass, where required, shall be reported. d. The sample shall be representative of daily operations and shall be analyzed in accordance with section 23-203. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the public works director or the applicable standards to determine compliance with the standard. e. Sampling must be performed in accordance with procedures set out in section 23-204. (6) Special studies may be required in the processing of an application, or a wastewater discharge permit update. In the event a special study is required, the public works director shall notify the applicant or the user in writing, of the need for the special study, and what parameters the study should address. If the public works director performs the study, the applicant or user shall deposit with the city the estimated cost of performing the study. All costs shall be borne by the applicant or user. Final costs will be based upon actual costs incurred by the city. (7) A time schedule for compliance with any provision of this article or categorical standard for which immediate compliance is not possible. (8) Any other information as may be deemed necessary by the public works director to evaluate the permit application. (b) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.

(Ord. No. 1984, § 2(Exh. A), 3-10-26)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.