For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-221 — Modifications

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 23-221

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/bbc75c02-dae8-4b39-8bf0-3db1852b432f

Sec. 23-221. - Modifications.

The public works director may modify a wastewater discharge permit for good cause, including, but not limited to the following reasons: (1) Promulgation of categorical standards. Within three months of the promulgation of a categorical standard, permits for users subject to such categorical standards shall be revised to require compliance within the time frame prescribed by such categorical standard. Where an affected user has not previously submitted an application for a permit as required by Section 23-218, the user shall apply for a permit within 180 days after the promulgation of the applicable categorical standard. In addition, users with existing permits shall submit to the public works director, within 180 days after the promulgation of an applicable categorical standard, the information required by subsection 23-218(a)(7). (2) Changes in operation. Industrial users shall receive written approval from the public works director prior to initiating any changes in the operation of the user's facility which may result in a change in quantity or quality of nondomestic wastewater contributed to the POTW. As a condition approving such changes, the public works director may impose such conditions as may be necessary to ensure that the user's system, as modified, will not cause harm to the POTW or unreasonably or inequitably burden the operation of the POTW. For the purposes of this section, the word "changes" shall include but not be limited to the following: a positive or negative change of 25 percent in the quantity of industrial wastes discharged, additional processes, additional or different equipment, and an increase in production capacity. (3) Changes in permit conditions. The terms and conditions of the permit may be subject to modification by the public works director during the term of a permit if limitations or requirements, as referenced in division 4 of this article, are modified or the user violates a provision of this article, misrepresents or fails to fully disclose all relevant facts in the wastewater discharge permit or in any required reporting. The user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of change and may appeal the modification pursuant to section 23-21. Any changes or new conditions in a permit shall include a reasonable time schedule for compliance. (4) The public works director receives information indicating that the permitted discharge poses a threat to the POTW, beneficial use of the biosolids, city or control authority personnel, or the receiving waters. (5) To correct typographical or other errors in the wastewater discharge permit.

(Ord. No. 1984, § 2(Exh. A), 3-10-26)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.