Sec. 5-11. - Completion of construction.

Notwithstanding the requirements of the individual codes adopted by this article, and subject to the exceptions provided below, every permit issued by the building official, under the provisions of this code, shall expire by limitation and become null and void if the building or work authorized by such permit is not completed by the owner, owner's agent, or the permittee and approved by the city within the following time frame commencing on the date of such permit issuance: (1) Residential: Room additions and interior/exterior remodeling and/or repair .....12 months (2) Pools/spas .....12 months (3) Patio covers, balconies, decks .....6 months (4) Reroofing .....6 months (5) Fireplaces .....6 months (6) Commercial/industrial tenant improvement: interior and exterior remodeling (including small additions) .....12 months (7) New building construction: ..... Commercial/industrial .....24 months Residential .....24 months (8) Grading .....12 months (9) Plumbing, mechanical, electrical and solar (not associated with any of the above items) .....6 months (10) Demolition .....6 months (11) Plan check .....6 months (12) Other .....6 months Exception. Upon written request of the owner or permittee, the building official may extend the period for completion of construction for a period not to exceed 180 days. The written request must be submitted to the building official prior to the date of expiration of the permit in question and shall demonstrate that (1) due to circumstances beyond the owner or permittee's control, construction could not be completed in the above specified construction time period; (2) that reasonable progress has been made; (3) that the condition of the property presents no health or safety hazard; and (4) that the continued delay will not create any unreasonable visual or physical detriment to the neighborhood. No permit shall be extended more than once. The building official, upon making a determination that there exists extenuating circumstances, may extend the period for completion of construction of a large commercial/industrial project for a period greater than 180 days. Note. (1) Reasonable progress shall mean a demonstration that all means reasonably available to the permittee to complete the work within the prescribed time have been exhausted. (2) Remodeling is defined as construction of work which constitutes construction, enlargement, alteration, erection, repair, demolition or improvement, of an existing building, structure or other improvement located on a piece of property.

(Ord. No. 1167, § 2, 11-7-95)