For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-12 — Maintenance of property during construction

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 5-12

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/1f6b1b65-c140-40cc-ba23-aeccc28bdc2c

Sec. 5-12. - Maintenance of property during construction.

During repair, enlargement, construction, remodel, improvement or alteration, all property shall be maintained in a reasonable clean and well-kept manner. All lumber and building materials shall be neatly piled or stacked in a safe manner. All lumber and building materials used in conjunction with a residential addition, remodel or repair shall be stored in the rear yard of the residential property or inside the building construction perimeter. Exception. Building materials may be stored in a front yard, as long as a safety hazard is not created, for a period not to exceed 30 days. The exterior walls and roofs of buildings or structures in conjunction with a residential addition, remodel or repair shall be covered with finished materials, in accordance with city-approved plans and the building code within six months from the commencement of construction. A waiver of this requirement may be obtained from the building official or his/her designated representative if the construction is screened from view from adjacent occupied, public property or public right of way with fencing materials approved by city zoning and building regulations.

(Ord. No. 1167, § 2, 11-7-95)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.